Laird is an underground Toronto subway station on Line 5 Eglinton in Toronto, Ontario, Canada.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Laird is an underground Toronto subway station on Line 5 Eglinton in Toronto, Ontario, Canada. It is located in the Leaside neighbourhood in East York at the intersection of Laird Drive and Eglinton Avenue.

Construction

Ontario premier Kathleen Wynne officiated at the ground-breaking for the station on June 30, 2016. The station was constructed using the sequential excavation method (SEM), referred to as "mining". Laird, and stations were all constructed by this method, while the other underground Line 5 stations were built by cut-and-cover.

According to Crosslinx, SEM is more common in Europe and the Crosstown is the first project to use the technique in Toronto. Two shafts were built on the south side of Eglinton Avenue on both the east and west sides of Laird Drive. From the vertical shafts, workers mined horizontally towards and above the twin tunnels created by the tunnel boring machines.

Large pipe-like sections are used to support the roof of the excavation. Then, workers gradually excavated down to the liners of the twin tunnels, which were removed. When the excavation was finished, there was a multi-storey cavern with an arched ceiling, which provides enough strength to support the ground above.

The tunnel walls were then sprayed with shotcrete. Excavation was done slowly, about 1.5 metres per day; mining work proceeded on a 24-hour, 7-day-a-week basis. The station's mined cavern is long because it contains a crossover and a storage track in addition to the train platform.

Both the platform and the adjacent trackworks are contained within a single circular tube, and there are no support columns between the tracks. Using cut-and-cover would have disrupted approximately of Eglinton Avenue.

; published by the Toronto Star on April 27, 2018 ; published by the Crosstown project on June 7, 2018

Text derived from https://en.wikipedia.org/w/index.php?oldid=1377507394 under CC BY-SA 4.0; modifications have been made.

References

1 claim could not be tied to a specific sentence and is listed in the table below instead.