Lesson plan
LCDR Ruby class
The LCDR Ruby class was a class of six 2-4-0 steam locomotives purchased by William Martley for the London, Chatham and Dover Railway (LCDR) to haul passenger trains. During 1861, the LCDR was experiencing difficulty in obtaining sufficient locomotives with which to work their traffic. Orders had been placed for new locomotives, but delivery was delayed. Hence, the company bought several locomotives secondhand, some from British sources. The same year, James Staats Forbes was appointed to the post of general manager of the LCDR; he had recently been general manager of the Dutch Rhenish Railway (DRR), and knew that the DRR had some surplus locomotives. Martley was sent to Rotterdam in June 1861 to inspect them, and if they proved suitable, purchase them for £2,500 each including tenders but excluding delivery. The six locomotives purchased had been built for the DRR during September–October 1856 by Sharp, Stewart and Company (order no. E316, placed 26 May 1856; works nos. 942–7); the cost to the DRR was £2,480 for each engine and tender. They formed the last of three orders totalling 36 similar locomotives (nos. 1–36) supplied to the DRR by Sharp Stewart between 1854 and 1856. While on the DRR, nos. 31–36 had run between each.…
Article summary
The LCDR Ruby class was a class of six 2-4-0 steam locomotives purchased by William Martley for the London, Chatham and Dover Railway (LCDR) to haul passenger trains. During 1861, the LCDR was experiencing difficulty in obtaining sufficient locomotives with which to work their traffic. Orders had been placed for new locomotives, but delivery was delayed. Hence, the company bought several locomotives secondhand, some from British sources. The same year, James Staats Forbes was appointed to the post of general manager of the LCDR; he had recently been general manager of the Dutch Rhenish Railway (DRR), and knew that the DRR had some surplus locomotives. Martley was sent to Rotterdam in June 1861 to inspect them, and if they proved suitable, purchase them for £2,500 each including tenders but excluding delivery. The six locomotives purchased had been built for the DRR during September–October 1856 by Sharp, Stewart and Company (order no. E316, placed 26 May 1856; works nos. 942–7); the cost to the DRR was £2,480 for each engine and tender. They formed the last of three orders totalling 36 similar locomotives (nos. 1–36) supplied to the DRR by Sharp Stewart between 1854 and 1856. While on the DRR, nos. 31–36 had run between each.…
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.