Long Gully Bridge
The Long Gully Bridge, also known as Northbridge, Suspension Bridge, and Cammeray Bridge, is a concrete arch road bridge that carries Strathallen Avenue across Flat Rock Creek and Tunks Park, and connects the suburbs of Cammeray, in the…
≈ 5 min read
Long Gully Bridge. encyclopegia.org, snapshot enwiki-001367992446. /a/long-gully-bridge
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The Long Gully Bridge, also known as Northbridge, Suspension Bridge, and Cammeray Bridge, is a concrete arch road bridge that carries Strathallen Avenue across Flat Rock Creek and Tunks Park, and connects the suburbs of Cammeray, in the North Sydney Council local government area to its south, with Northbridge in the City of Willoughby local government area to its north, on the Lower North Shore region of Sydney, New South Wales, Australia. Privately-built to promote residential development in the suburb of Northbridge and beyond, the bridge opened in January 1892 as a steel suspension bridge finished in Sydney sandstone with crenellated turreted towers.
The bridge was transferred to the Department of Main Roads in 1935 and, in 1939, was rebuilt as a reinforced concrete two rib arch bridge, with the sandstone towers kept.
Original bridge
With the land boom of the 1880s, land to the north of Long Bay, Middle Harbour, was sold and resold. The North Sydney Investment and Tramway Company or the North Shore and Middle Harbour Land Company made major investments in the area and planned to build a tramway and a bridge across Long Bay gully in order to open up the area for sales of residential land.
A suspension bridge across the gully was opened to traffic in January 1892. It had taken two years and nine months to complete and cost A£42,000. With a suspension span of centre to centre of towers, it was considered one of the engineering wonders of Sydney and became a great tourist attraction.
A toll of threepence return for adults and one penny for children was charged. The disastrous crash of 1892 saw both the above companies go into liquidation. The Depression of the 1890s slowed land sales and Northbridge did not develop as had been hoped; the tramway was not built.
In 1894 a fundraising dance and promenade concert was held on the bridge. In 1912 the bridge was handed over to the NSW Government as a gift, on the condition that a tramway be extended to the north side and no toll charged. The tramway was extended over the bridge in 1913-14, with its terminus in Sailors Bay Road.
Between its construction and its handing over to the Department of Public Works, the bridge was little used and poorly maintained for many years. Repairs and some strengthening works were carried out in conjunction with the construction of the tramway.
The Department of Main Roads (DMR) assumed control of the bridge in 1935 and inspections soon revealed serious corrosion in the steelwork and cables, partly attributable to defects in the design of the bridge. Water had been allowed to accumulate around the suspension rods as they passed through the cross girder ends in small, undrained reserves that had originally been filled with a bituminous mixture, which had not stood the test of time.
The main suspension cables were also found to be weakened by corrosion. The bridge was carefully monitored and it rapidly became clear that replacement or substantial rebuilding would be necessary. From several options, it was decided that a large concrete arch span to support the deck of the old suspension bridge was the most satisfactory solution.
The towers themselves were in very good condition and were recognised by the DMR as having local significance as a landmark and tourist attraction and as having considerable historical value. For these reasons they were retained and repeated in the design of the new work, with much attention to sympathetic design. The bridge closed in May 1936.
Current bridge
The arch was designed and tested through the analysis of models within the DMR. The construction contract was awarded to Hornibrook Bros. & Clark Pty. Ltd. The bridge was closed to tram and vehicular (but not pedestrian ) traffic and work began at the beginning of June 1937.
While a 'Melan' system using a steel rib to serve as falsework and then reinforcement in the completed structure had been considered, the tenderers favoured the conventional system of timber falsework, and it was this system which was employed. An interesting innovation, however, was employed in the form of steel cylinders with base plate partly filled with a fine dune sand and fitted with a hardwood piston.
The pistons bore the weight of the girders until it was time to strike the falsework when two small screw plugs on the cylinders could be opened to a carefully prepared schedule, with a large team of operators working to signals, and sand released so that the crown and then, gradually, the whole arch took up its own load. Worker safety was also an important factor in the design of construction methods for the bridge.
The bridge was re-opened to traffic in late 1939.
Text derived from https://en.wikipedia.org/w/index.php?oldid=1367992446 under CC BY-SA 4.0; modifications have been made.