The MBIR ( ) is a multi-loop research reactor capable of testing lead, lead-bismuth and gas coolants, and run on MOX fuel. MBIR intends to replace the old BOR-60 experimental fast reactor that started operations at RIAR's site in 1969. It will have a design life of 50 years.

The MBIR ( ) is a multi-loop research reactor capable of testing lead, lead-bismuth and gas coolants, and run on MOX fuel. MBIR intends to replace the old BOR-60 experimental fast reactor that started operations at RIAR's site in 1969. It will have a design life of 50 years.

History

Construction has started in 2015. MBIR control assembly was installed in 2019. Reactor vessel was installed in 2023. Pilot fuel elements were produced in 2024. The MBIR is scheduled to begin operation in 2027. Estimated commissioning date is 2028.

See also

Generation IV reactor BN-800 reactor – generation IV sodium-cooled fast breeder reactor, operational since 2016 BREST-300 – generation IV lead-cooled fast reactor, in construction since 2020 Versatile Test Reactor – a similar US project, the funding was canceled in 2022

References

External links

Official website

Text derived from https://en.wikipedia.org/w/index.php?oldid=1375387588 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

6 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.