McCowan Yard

McCowan Yard is an inactive rail yard on the Toronto Transit Commission's (TTC's) Line 3 Scarborough of the Toronto subway system.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

McCowan Yard is an inactive rail yard on the Toronto Transit Commission's (TTC's) Line 3 Scarborough of the Toronto subway system. Line 3 permanently closed following a derailment on July 24, 2023.

Facilities

McCowan Yard is situated on a site located east of McCowan Station, the eastern terminal of the former Line 3. The yard's street entrance is at 1720 Ellesmere Road, Scarborough, Toronto. The yard provided facilities for the storage, cleaning, and maintenance of the 28 Intermediate Capacity Transit System (ICTS) vehicles used on Line 3 Scarborough.

The yard employed a staff of 40. The yard had a carhouse made of prefabricated metal designed by the TTC's Engineering and Construction Department. The carhouse contained one wash track and two repair/maintenance tracks.

Outside, there were four storage tracks for passenger vehicles and a turning loop of radius was used to store work vehicles. The yard also had a power substation. McCowan Carhouse was limited to light repairs and maintenance.

Major maintenance work had to be performed at the Greenwood Yard shop. Because of gauge and technology differences, ICTS cars had to be transported by truck between the McCowan and Greenwood yards.

Future

McCowan Yard was to have been a temporary facility pending an expansion of the line to Malvern. However, the City of Toronto has decided to replace Line 3 with an extension of Line 2 Bloor–Danforth estimated to open in 2030. With the closure of Line 3 in 2023, McCowan Yard was shut down and decommissioned.

As of 2026, the TTC announced that the McCowan Yard will be demolished in order to construct a new operations building. Demolition of the facility is expected to start in June 2026.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1369364695 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

7 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.