Mose

Uses your system voice; voice and rate in settings.

Q1644374Snapshot

≈ 5 min read

Names in other languages

  • DeutschMose
  • EnglishMose
  • EspañolMose
  • FrançaisMose
  • ItalianoMose
  • NederlandsMose
  • skMose
  • SvenskaMose

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

floods in Piazza San Marco, November, 2004. The increasing frequency of this type of event caused considerable damage and prompted projects such as MOSE. MOSE ( ) is a project intended to protect the city of Venice, Italy, and the Venetian Lagoon from flooding. The project is an integrated system consisting of rows of mobile gates, installed on the seafloor at the Lido, Malamocco, and Chioggia inlets, that can be raised to temporarily seal off the Venetian Lagoon from the Adriatic Sea during acqua alta high tides. Together with other measures, such as coastal reinforcement, elevating of quaysides, and paving and improvement of the lagoon, MOSE is designed to protect Venice and the lagoon from tides of up to . , the floodgates are raised for tides forecast to be more than . The Consorzio Venezia Nuova is responsible for the work on behalf of the Ministry of Infrastructure and Transport – Venice Water Authority. Construction began simultaneously in 2003. On 10 July 2020, the first full test was successfully completed, and after multiple delays, cost overruns, and scandals resulted in the project missing both its 2018 completion deadline (originally a 2011 deadline) and its 2021 deadline, and is now to be finished in 2025.…

floods in Piazza San Marco, November, 2004. The increasing frequency of this type of event caused considerable damage and prompted projects such as MOSE. MOSE ( ) is a project intended to protect the city of Venice, Italy, and the Venetian Lagoon from flooding. The project is an integrated system consisting of rows of mobile gates, installed on the seafloor at the Lido, Malamocco, and Chioggia inlets, that can be raised to temporarily seal off the Venetian Lagoon from the Adriatic Sea during acqua alta high tides. Together with other measures, such as coastal reinforcement, elevating of quaysides, and paving and improvement of the lagoon, MOSE is designed to protect Venice and the lagoon from tides of up to . , the floodgates are raised for tides forecast to be more than . The Consorzio Venezia Nuova is responsible for the work on behalf of the Ministry of Infrastructure and Transport – Venice Water Authority. Construction began simultaneously in 2003. On 10 July 2020, the first full test was successfully completed, and after multiple delays, cost overruns, and scandals resulted in the project missing both its 2018 completion deadline (originally a 2011 deadline) and its 2021 deadline, and is now to be finished in 2025. On 3 October 2020, the MOSE was activated for the first time in the occurrence of a high tide event, preventing some of the low-lying parts of the city (in particular piazza San Marco) from being flooded. In 2020, the experts who had conceived a set of three floodgates separating the Adriatic Sea from Venice estimated that each year they would have to raise the floodgates 5 times. Within two years after the inaugural raising of the floodgates, MOSE was activated 49 times.

Baby MOSE

'Baby MOSE' is the flood defence system protecting Chioggia from the most frequently occurring high waters, up to a maximum of . Completed in the summer of 2012, it consists of two movable sluices located at the ends of the Vena canal - the canal that crosses the centre of Chioggia from North to South. These can be raised in a few minutes and protect the center of Chioggia from the most frequent high waters. The two sluices (Vigo and Santa Maria) are equal, long, wide and thick; in case of threatening tides, they are raised in eight minutes using hydraulic motors. Together with raising canal banks and the areas at the edge of the urban centre, completed previously, the babyMose is able to defend from tides up to The babyMose was completed in time to keep the center of Chioggia dry during the high water of October 2012. In the case of more extreme high waters, it is necessary to wait for the main MOSE to come into operation, which blocks the entrance of the tide into the lagoon through the closure of the MOSE barriers. The babyMose, as well as the other interventions of protection and urban redevelopment implemented in Chioggia in recent years, was carried out by the Magistrate of the Waters of Venice, through the Consorzio Venezia Nuova, together with the municipal administration.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1366715547 under CC BY-SA 4.0; modifications have been made.

Provenance

snapshot mose-192314-869026691a17cf60 · hash 869026691a17cf608adde5264515f8ecefdb374a85ed79ba8acbe218815c6d5e · captured 1785345069.0 · version history

Cite this page as: encyclopegia.org, “Mose”, snapshot mose-192314-869026691a17cf60. https://encyclopegia.org/a/mose

Sources cited in this revision

No external citation was extracted for this revision. That is a statement about the source, not a claim that none exists.