Lesson plan

MR-90

The MR-90 was a class of single-level electric multiple unit (EMU) railcar ordered in 1992 at a price of $133,5 million by the Société de Transport de la Communauté Urbaine de Montreal (STCUM). They were built in 1994–1995 by Bombardier Transportation at its La Pocatière factory. They were delivered to the STCUM at a final cost of $119,5 million . They first operated for the STCUM starting October 26, 1995 until January 1, 1997 when operation were transferred the newly created Agence de transport métropolitaine (AMT) which had gained ownership of the rolling stock earlier on December 20, 1996. On June 1, 2017 the AMT's operations was reorganized into the Réseau de transport métropolitain (exo) which became the owner and the operator of the trains. With the closure of the Deux-Montagnes line on December 31, 2020, in favour of the Réseau express métropolitain project, the MR-90 fleet was withdrawn from service. They were subsequently transported to Exo's Pointe-Saint-Charles maintenance center for storage. A request for information has been issued to determine the fate of the cars. In 2022, exo announced that the MR-90 coaches would be scrapped. A single married pair, composed of motor car number 400 and trailer with cab number 485, was set aside for preservation at the Canadian Railway Museum in Saint-Constant.…

Back to article

Article summary

The MR-90 was a class of single-level electric multiple unit (EMU) railcar ordered in 1992 at a price of $133,5 million by the Société de Transport de la Communauté Urbaine de Montreal (STCUM). They were built in 1994–1995 by Bombardier Transportation at its La Pocatière factory. They were delivered to the STCUM at a final cost of $119,5 million . They first operated for the STCUM starting October 26, 1995 until January 1, 1997 when operation were transferred the newly created Agence de transport métropolitaine (AMT) which had gained ownership of the rolling stock earlier on December 20, 1996. On June 1, 2017 the AMT's operations was reorganized into the Réseau de transport métropolitain (exo) which became the owner and the operator of the trains. With the closure of the Deux-Montagnes line on December 31, 2020, in favour of the Réseau express métropolitain project, the MR-90 fleet was withdrawn from service. They were subsequently transported to Exo's Pointe-Saint-Charles maintenance center for storage. A request for information has been issued to determine the fate of the cars. In 2022, exo announced that the MR-90 coaches would be scrapped. A single married pair, composed of motor car number 400 and trailer with cab number 485, was set aside for preservation at the Canadian Railway Museum in Saint-Constant.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.