MRT Line 5

The MRT Line 5 ( , romanised: Em-Ar-Ti Lain Pachh) is an approved mass rapid transit line of Dhaka Metro Rail, in Bangladesh.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The MRT Line 5 ( , romanised: Em-Ar-Ti Lain Pachh) is an approved mass rapid transit line of Dhaka Metro Rail, in Bangladesh. It will be the third line of the Dhaka Metro Rail system and comprise the Northern Route and Southern Route. The construction of the MRT Line 5's Northern Route began on 5 November 2023 and is scheduled to commence operation by December 2032.

Background

In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka. The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka. The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6.

Northern Route

The construction of the Northern Route of the MRT Line 5 will start in July 2023 and will end by December 2032.

Southern Route

The Southern Route of MRT Line 5 is still in the planning stages. There may be changes to the list of stations, including adding new stations, assigning different names to the stations or some stations getting eliminated from the line. Hence, the list of stations is not final and may be updated in the future.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1375330577 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

6 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.