The MRTC 3000 class, also known as the Tatra RT8D5M, is the class of first-generation high-floor uni-directional light rail vehicles in use on the Manila MRT Line 3 and built by Czech tram manufacturer ČKD Tatra. The LRVs are owned and operated by the Department of Transportation (DOTr). Until 2025, the RT8D5M LRVs were owned by the Metro Rail Transit Corporation (MRTC) pursuant to its build-lease-transfer contract with the DOTr. These were also the last vehicles made by ČKD Tatra before it was taken over by Siemens.
The MRTC 3000 class, also known as the Tatra RT8D5M, is the class of first-generation high-floor uni-directional light rail vehicles in use on the Manila MRT Line 3 and built by Czech tram manufacturer ČKD Tatra. The LRVs are owned and operated by the Department of Transportation (DOTr). Until 2025, the RT8D5M LRVs were owned by the Metro Rail Transit Corporation (MRTC) pursuant to its build-lease-transfer contract with the DOTr. These were also the last vehicles made by ČKD Tatra before it was taken over by Siemens.
History
Purchase and production
Construction of the MRT Line 3 began in 1996 when the then-Department of Transportation and Communications (DOTC; later the Department of Transportation) entered into a build-lease-transfer agreement with the Metro Rail Transit Corporation (MRTC). MRTC signed a contract with ČKD Tatra in 1997 to supply the trains. 73 light rail cars were produced by ČKD in two batches; 49 were produced in 1998 and the other 24 were completed the following year. The first train was flown into Manila via plane while the remaining trains were transported by sea. The fleet also happened to be the last produced by ČKD before it was taken over by Siemens.
Prototype RT8D5 0029
In late-March 1995, the first three-section tram was tested in Prague under the number 0029 as a prototype. It was a development of the Tatra KT8D5; 0029 retained its control, proportions, the front and rear sections, and unlike the later production vehicles, designed for bidirectional operation. Prototype 0029 soon remained in Prague. On November 3, 1998, under orders of MRT-3's future operator, 0029 was used together with the Tatra T5A5 prototype, tram no. 0013, and T3 no. 6663 for crash tests in the main workshop in Hostivař. The tests were proven to be successful as 0029 was not significantly damaged. It then stood at the workshop for several years before being eventually scrapped.
Refurbishments and upgrades
All 73 light rail vehicles (LRV) were first refurbished from 2008 to 2009 by Sumitomo Corporation, its technical partner Mitsubishi Heavy Industries Engineering (MHIENG), and its subsidiary TES Philippines Inc. (TESP). The aging air-conditioning units of the trains since 1999 were replaced with new ones. The interior and exterior of the trains were also refurbished. In 2016, Busan Universal Rail, Inc. (BURI) initiated the second overhaul of the trains.
Forty-three light rail vehicles were to be overhauled as part of its three-year maintenance contract with the Department of Transportation and Communications (DOTC; later the Department of Transportation [DOTr]). The refurbished cars underwent a body repaint and installation of new air-conditioning units from Thermo King. However, DOTr terminated its contract with BURI on November 6, 2017, with only three vehicles refurbished. On May 1, 2019, Sumitomo returned as maintenance provider and continued the second refurbishment of the trains.
The contractual scope was expanded to cover all 72 LRVs. It consists of the installation of new choppers, traction motors, wheels, pantographs, new air conditioning units from Thermo King; the repainting of the train's exteriors and interiors; and the fitting of new lighting installations throughout the trains. SKD TRADE, a.s., the successor company to ČKD Tatra, also supplied new tachographs, axles, and bogies, as well as spare parts for the interior, pantographs, couplers, and resistors. The first overhauled train was deployed in mid-2019.
On October 29, 2020, a newly overhauled train underwent a test run at a speed of ; it was put to service on November 5. Refurbishment was completed on February 2, 2023, three months ahead of schedule.
Four-car operations
Plans for four-car operations were first laid in 2016, adding an additional car from the current three. Although MRT-3's stations are designed for four-car trains, the pocket track near Taft Avenue station was too short for safe four-car operations. After the completion of the line's rehabilitation in late 2021, the DOTr tested a four-car 3000 class trainset on the mainline on March 9, 2022. The first two four-car trainsets were deployed on March 28, while a third trainset was rolled out on April 18.
Although full conversion was initially planned to be achieved by 2023, all trains soon reverted to the existing 3-car configuration. In February 2025, the DOTr planned to redeploy four-car trainsets once the construction of the extended Taft Avenue pocket track would be completed in June. In the aftermath of the line's annual maintenance shutdown during Holy Week, four-car operations returned on April 21 (Easter Monday), two months ahead of schedule, with an initial three sets deployed during the weekday peak hours.
On October 17, 2025, the DOTr increased the number of four-car trainsets to six to further reduce passenger congestion at stations. On October 18, it extended its deployment to weekends.
Mechanical
Each LRV has inside-frame bogies, consisting of four motorized bogies. The primary suspension is a steel spring and the secondary suspension is a wound-up steel spring. Scharfenberg couplers are present in the ends of the light rail vehicles.
Electrical
The electrical and traction systems of the RT8D5M trains are supplied by ČKD Trakce. The propulsion is controlled by choppers with IGBT thyristors. The traction motors consist of eight DC series-wound/wave armature winding self ventilated motors. The IEC 349-compliant traction motors have a Class H insulation class for the rotor and a Class F insulation class for the stator. Each motor has a power output of , and are rated for 375 volts, a current of 190 amps, and a speed of 1946 revolutions per minute (rpm) with a maximum speed of 4350 rpm. Auxiliary power is sourced from 480-volt AC static converters and two 24-volt DC batteries.
Signaling and safety equipment
The trains are equipped with the EBICAB 900 Automatic Train Protection (ATP) system. Some onboard signaling equipment consist of vehicle logic units (VLUs), driver panels, and antennas. The original VLUs were manufactured by Bombardier Transportation (acquired by Alstom in 2021). The VLUs are the primary automatic safety devices for the trains. In 2017, it was revealed that the original VLUs were stolen and replaced with unauthorized parts. An audit report by Bombardier Transportation showed that 99% of the trains were using fake parts. According to the inventory conducted in all cars, the other cars were equipped with ABB, ABB Daimler-Benz or DaimlerChrysler-branded VLUs. The EBICAB 900 ATP system is integrated with the Alstom CITYFLO 250 signaling solution.
Train formation
Each unidirectional light rail vehicle consists of three articulated sections. These are operated bidirectionally in sets of three or four.