Lesson plan
Murat River
The Murat River, also called Eastern Euphrates ( , , ), is a major source of the Euphrates River. The Ancient Greeks and Romans used to call the river Arsanias ( ). It originates near Mount Ararat north of Lake Van, in Eastern Turkey, and flows westward for through mountainous terrain. Before the construction of the Keban Dam, the Murat River joined the Karasu River or Western Euphrates north of the dam site and north of the town of Keban. In Muş Province, the river is interrupted near Toklu by the Alpaslan-1 Dam, which was completed in 2009. The Alpaslan-2 Dam was completed in 2021 and is located downstream of Alpaslan-1. The river merges into the reservoir of the Keban Dam, at one time Turkey's largest dam, which was completed in 1974 and provides electrical power. In Bingöl and Elazığ provinces, Kalehan Energy has four dams planned for the river: from upstream to downstream, the Upper Kaleköy Dam, Lower Kaleköy Dam, Beyhan I Dam, and Beyhan II Dam. The Beyhan I and Upper Kaleköy dams are already completed. Once completed, all four dams will have a combined installed capacity of 1,855 MW.
Article summary
The Murat River, also called Eastern Euphrates ( , , ), is a major source of the Euphrates River. The Ancient Greeks and Romans used to call the river Arsanias ( ). It originates near Mount Ararat north of Lake Van, in Eastern Turkey, and flows westward for through mountainous terrain. Before the construction of the Keban Dam, the Murat River joined the Karasu River or Western Euphrates north of the dam site and north of the town of Keban. In Muş Province, the river is interrupted near Toklu by the Alpaslan-1 Dam, which was completed in 2009. The Alpaslan-2 Dam was completed in 2021 and is located downstream of Alpaslan-1. The river merges into the reservoir of the Keban Dam, at one time Turkey's largest dam, which was completed in 1974 and provides electrical power. In Bingöl and Elazığ provinces, Kalehan Energy has four dams planned for the river: from upstream to downstream, the Upper Kaleköy Dam, Lower Kaleköy Dam, Beyhan I Dam, and Beyhan II Dam. The Beyhan I and Upper Kaleköy dams are already completed. Once completed, all four dams will have a combined installed capacity of 1,855 MW.
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.