Murraylink

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Murraylink is an Australian high voltage direct current electricity transmission link between Berri, South Australia and Red Cliffs, Victoria, connecting the two state electricity grids. Murraylink was commissioned in 2002 and is believed to be the world's longest underground transmission system and cost more than A$177 million. It was built by TransEnergie Australia, a subsidiary of Hydro-Québec. It was sold to the APA Group in March 2006 for A$153 million. In December 2008 ownership of Murraylink (as well as Directlink) was transferred to the newly formed Energy Infrastructure Investments Group, while APA continued as the operator. The ownership of EII is APA with 19.9%, with the balance with Marubeni (49.9%) and Osaka Gas (30.2%).

Murraylink is an Australian high voltage direct current electricity transmission link between Berri, South Australia and Red Cliffs, Victoria, connecting the two state electricity grids. Murraylink was commissioned in 2002 and is believed to be the world's longest underground transmission system and cost more than A$177 million. It was built by TransEnergie Australia, a subsidiary of Hydro-Québec. It was sold to the APA Group in March 2006 for A$153 million. In December 2008 ownership of Murraylink (as well as Directlink) was transferred to the newly formed Energy Infrastructure Investments Group, while APA continued as the operator. The ownership of EII is APA with 19.9%, with the balance with Marubeni (49.9%) and Osaka Gas (30.2%). ==References== ==External links==

Text derived from https://en.wikipedia.org/w/index.php?oldid=1373455889 under CC BY-SA 4.0; modifications have been made.