The LRT Mutiara Line (English: Pearl) is a light rapid transit (LRT) system under construction in Penang. The line will connect George Town's city centre with its southern suburbs of Jelutong, Gelugor and Bayan Lepas, with a link towards Seberang Perai across the Penang Strait.

The first domestic LRT line outside the Klang Valley, the Mutiara Line is a component of the Penang Transport Master Plan (PTMP) and comprises 22 stations. Once completed, it will be owned by the Malaysia Rapid Transit Corporation (MRT Corp). Construction of the line began in 2025 and it is planned to be completed by December 2031.

An LRT or rapid transit system has been proposed for Penang for decades, with early plans dating back to 1981. However, the project faced prolonged delays due to political disputes between rival coalitions. Over the years, proposals shifted between heavy rail, heritage trams and a monorail system.

The monorail, proposed in 2002, was ultimately scrapped in 2008 following the Barisan Nasional (BN) government's defeat in the state election that year. The current project was introduced by the Penang state government, under Pakatan Rakyat (PR), in 2015 as the "Bayan Lepas line" under the PTMP.

The plan envisioned a light metro system operating along a north-south axis across George Town's heavily urbanised eastern shoreline, with a planned extension toward Silicon Island.…

The LRT Mutiara Line (English: Pearl) is a light rapid transit (LRT) system under construction in Penang. The line will connect George Town's city centre with its southern suburbs of Jelutong, Gelugor and Bayan Lepas, with a link towards Seberang Perai across the Penang Strait.

The first domestic LRT line outside the Klang Valley, the Mutiara Line is a component of the Penang Transport Master Plan (PTMP) and comprises 22 stations. Once completed, it will be owned by the Malaysia Rapid Transit Corporation (MRT Corp). Construction of the line began in 2025 and it is planned to be completed by December 2031.

An LRT or rapid transit system has been proposed for Penang for decades, with early plans dating back to 1981. However, the project faced prolonged delays due to political disputes between rival coalitions. Over the years, proposals shifted between heavy rail, heritage trams and a monorail system.

The monorail, proposed in 2002, was ultimately scrapped in 2008 following the Barisan Nasional (BN) government's defeat in the state election that year. The current project was introduced by the Penang state government, under Pakatan Rakyat (PR), in 2015 as the "Bayan Lepas line" under the PTMP.

The plan envisioned a light metro system operating along a north-south axis across George Town's heavily urbanised eastern shoreline, with a planned extension toward Silicon Island. The project received conditional approval from the Malaysian federal government in 2019, and construction was scheduled to begin in 2020.

However, the project faced successive delays due to the COVID-19 pandemic and the nationwide political crisis, which led to a withdrawal of support by alternating ruling coalitions before the federal government eventually intervened. Following the 2022 general election, the federal government, which now included Pakatan Harapan (PH) members, the successors of PR, expedited development by providing additional funding before fully taking over the project from the Penang state government.

The line was subsequently re-designated and its alignment substantially redesigned, introducing a cross-strait link from George Town to Seberang Perai on the mainland.

Overview

The Mutiara line forms the backbone of the PTMP, an initiative created by the Penang state government in 2015 to improve transport infrastructure throughout the state. The master plan includes several rapid transit lines, including one that spans the north south axis of George Town's east coast between the city centre and Bayan Lepas. , average daily traffic along the city centre Bayan Lepas axis reached 64,144 vehicles, further necessitating an alternative mode of transportation to serve the densely populated urban and industrial corridor.

In addition, the transit service would facilitate easier commutes for tourists arriving via the Penang International Airport.

See also

Malaysian national projects Rail transport in Malaysia Rapid Penang Transport in Penang

Official website of the Mutiara LRT

Text derived from https://en.wikipedia.org/w/index.php?oldid=1376348636 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

31 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.