MV Dali is a Neopanamax container ship built by Hyundai Heavy Industries.
≈ 6 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
MV Dali is a Neopanamax container ship built by Hyundai Heavy Industries. On 26 March 2024, she caused the collapse of the Francis Scott Key Bridge in Baltimore when she lost power and collided with one of its supports. Contracted in 2013, her hull was laid down in October 2014, launched in December, and she was named after Spanish painter Salvador Dalí in January 2015.
In March, she was delivered to Stellar Marine, a subsidiary of the Greek shipowner Oceanbulk Maritime. In July 2016, she collided with the berth at the container terminal of the Port of Antwerp, damaging the ship and the berth.
Dali was sold by Stellar Marine to Grace Ocean, a Singaporean company, in October 2016; she was placed under the management of Synergy Marine and reflagged as Singaporean. A faulty fuel pressure gauge was detected at the port of San Antonio, Chile, in June 2023; the gauge was replaced and no faults were detected at a further check three months later.
On 26 March 2024, shortly after leaving the Port of Baltimore with a crew of 22 and two Maryland pilots en route to Colombo, Sri Lanka, the ship lost power and struck a support pillar of the Francis Scott Key Bridge, causing its collapse. Traffic had been stopped on the bridge in response to a mayday call, but six construction workers were killed.
Francis Scott Key Bridge collapse
On 26 March 2024, Dali departed the Port of Baltimore in the United States, carrying a total load of nearly 4,700 containers and bound for Colombo, Sri Lanka, while under charter to Maersk, with a crew of 22 and two pilots. Shortly after leaving the port, the ship lost power twice, but was able to broadcast a mayday call in between.
Soon afterwards, she collided with a support pillar of the Francis Scott Key Bridge, causing a major part of the bridge to collapse, with one span falling onto the ship's forecastle. None of the 24 on board was seriously injured. All moving traffic had left the bridge, but six construction workers died.
The National Transportation Safety Board conducted the investigation and interviewed the crew. It released its findings on 18 November 2025, tracing the ship's two power outages to an improperly labeled signal wire 1 for terminal block 381 in the electrical control room, which came loose; since the defect could have been found by off-the-shelf thermography technology right after installation, the NTSB found Hyundai's subcontractor WAGO Company at fault.
Grace Ocean Private and Synergy Marine Group filed a joint petition on 1 April 2024 in the Maryland U.S. District Court to limit their liability to about $43.6 million under the Limitation of Liability Act of 1851. Chief judge James K. Bredar is overseeing the proceedings.
On 17 April, Grace Ocean Private filed a general average declaration to require cargo owners to cover part of the salvage costs. in Norfolk, Virginia On 23 April, the Mayor and City Council of Baltimore filed papers, in the Northern District of Maryland, seeking a jury trial within the district, to obtain compensation from Grace Ocean Private Limited of Singapore (owners), and Synergy Marine PE Ltd of Singapore (managers), for the resultant financial losses. The plaintiffs alleged that the defendants provided an incompetent, inattentive, improperly trained, improperly supervised crew, on an improperly maintained and unseaworthy vessel, resulting in the bridge collapse, harming the city.
The collapsed parts of the bridge were separated from the ship on 13 May by explosives. A week later the authorities removed Dali using tugboats which berthed the ship at the Seagirt Marine Terminal for inspection, assessment, and more debris removal. Dali arrived in Hampton Roads on 25 June 2024, to unload its cargo at Virginia International Gateway and undergo repairs.
Dali left Norfolk for China in September 2024. On 13 November, she arrived at Fujian Huadong Shipyard, where structural damage to the ship's bow and deck was repaired, and work done on the vessel's machinery, anchors, thrusters, electrical and hydraulic systems and number-one cargo hold. It was unclear whether the work fixed problems that contributed to the collision.
Post-repair sea trials began on 12 January 2025. Dali was returned to service on 21 January under the management of Synergy Marine, and was assigned to Maersk's AC3 route between Asia and Central America.
In June 2026, prosecutors agreed to a deferred prosecution for the vessel's chief engineer, Karthikeyan Deenadayalan, who admitted to conduct that constitutes a criminal violation of the Ports and Waterways Safety Act, regarding an unsafe fuel supply arrangement, which led to the collision. Additional Synergy employees, including Radhakrishnan Karthik Nair, who had instructed Deenadayalan, were charged separately.
See also
Lake Illawarra, the bulk carrier that collided with the Tasman Bridge in 1975 Marine Floridian, the tanker that collided with the Benjamin Harrison Memorial Bridge in 1977 Summit Venture, the bulk carrier that collided with the Sunshine Skyway Bridge in 1980