The Network Development Plan – Metropolitan Rail was a long-term development plan for the rail network of Melbourne, Australia.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 4 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The Network Development Plan – Metropolitan Rail was a long-term development plan for the rail network of Melbourne, Australia. It was written by Public Transport Victoria (PTV) and released to the public on 27 March 20131 under the Napthine government and received minor updates in 20161. Similar plans were intended to be released for regional rail, trams and buses.

However, only the metropolitan rail aspect of the plan was released to the public by PTV. The Regional Network Development Plan was released by the Victorian Department of Transport in 2016. The primary aim of the metropolitan rail plan was to improve the efficiency, reliability and patronage of Melbourne's train network and transition it towards a rapid transit system.

It set out a number of goals over four stages, to be carried out over 20 years. Then-CEO of PTV Ian Dobbs (whose contract was not renewed in 2015) estimated the whole plan would cost about $30 billion. In 2019 PTV was abolished as an independent, statutory government body and absorbed into the Victorian Department of Transport.

The plan was influential on Melbourne's transport planning but does not represent current government policy.

Background

The Public Transport Development Authority, later trading as Public Transport Victoria, was established by the Victorian government under Premier Ted Baillieu with the intent of, among other things, planning and improving the operations of the rail network.

Plan

Below is the initial timeline of Stages 1–4 of the Network Development Plan of Metropolitan Rail which was released in 2013

Stage 1: (Timeline 2012 – 2016)

This stage outlined immediate high priority goals to overcome urgent constraints, with a targeted completion date of 2016. All projects listed in Stage 1 had been completed in 2022.

2018 Transport for Victoria Plan

In October 2018, a Victorian Rail Plan prepared by Transport for Victoria (TFV) was leaked to the press, containing a similar staged approach to the PTV NDMPR. The plan, released during the campaign for that year's state election, caused some controversy, as government policy announcements did not align with the strategic priorities identified in the plan.

The Suburban Rail Loop, in particular, did not appear, and the TFV plan was further criticised for failing to prioritise meaningful service increases for regional corridors in the earlier stages of the plan. Government representatives argued that the plan was an "internal working document" and not representative of government policy; Opposition politicians contended that the plan was representative of the government's priorities.

Stage 5

A timeframe for Stage 5 has not been published.

Stage 6

A timeframe for Stage 6 has not been published.

See also

Victorian Transport Plan List of Victoria Government infrastructure plans, proposals, and studies

Official website

Text derived from https://en.wikipedia.org/w/index.php?oldid=1377624574 under CC BY-SA 4.0; modifications have been made.