New Shuttle
≈ 7 min read
Names in other languages
- 한국어사이타마 신도시 교통 이나선
- EnglishNew Shuttle
- ItalianoNew Shuttle
- NederlandsNew Shuttle
- 日本語伊奈線
- 简体中文伊奈线
- 繁體中文伊奈線
- 中文伊奈綫
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The is a manually operated, rubber-tyred people mover system in Saitama Prefecture, Japan. The system's only route is the , which runs north from Ōmiya Station in Saitama to Uchijuku Station in Ina. The line was built as part of an agreement to address local opposition to the construction of elevated viaducts for the Shinkansen through the area. The New Shuttle runs alongside the Shinkansen for most of its route. Between Ōmiya and Maruyama, the line is double-tracked and runs alongside the viaduct shared by the Tōhoku Shinkansen and Jōetsu Shinkansen. Between Maruyama and Uchijuku, it continues alongside the Jōetsu Shinkansen on a single track. The New Shuttle's depot is located within the Y-shaped junction formed by the Tōhoku and Jōetsu Shinkansen lines at Maruyama. It is operated by the third-sector railway company , whose shareholders include East Japan Railway Company (40%), the Saitama prefectural government (35%), various banks (15% collectively), Tobu Railway (5%), and the municipalities served by the line (5% collectively).
The is a manually operated, rubber-tyred people mover system in Saitama Prefecture, Japan. The system's only route is the , which runs north from Ōmiya Station in Saitama to Uchijuku Station in Ina. The line was built as part of an agreement to address local opposition to the construction of elevated viaducts for the Shinkansen through the area. The New Shuttle runs alongside the Shinkansen for most of its route. Between Ōmiya and Maruyama, the line is double-tracked and runs alongside the viaduct shared by the Tōhoku Shinkansen and Jōetsu Shinkansen. Between Maruyama and Uchijuku, it continues alongside the Jōetsu Shinkansen on a single track. The New Shuttle's depot is located within the Y-shaped junction formed by the Tōhoku and Jōetsu Shinkansen lines at Maruyama. It is operated by the third-sector railway company , whose shareholders include East Japan Railway Company (40%), the Saitama prefectural government (35%), various banks (15% collectively), Tobu Railway (5%), and the municipalities served by the line (5% collectively).
Stations
The stations on the line are as follows. All stations are located in Saitama Prefecture. The line's depot is located near Maruyama Station.
Rolling stock
, the following train types are used on the line, all formed as six-car sets.
2000 series
The 2000 series fleet consists of seven 6-car sets, numbered 01 to 07. Built by Kawasaki Heavy Industries, the trains have stainless steel bodies with different colours on the front ends and bodyside stripes. The cars retain the length of the previous fleet but are wider and have ceilings higher to provide additional capacity and reduce crowding. Set 01 entered service on 22 May 2007. Set 07 was delivered in December 2014, completing the fleet.
2020 series
The 2020 series fleet consists of six 6-car sets, numbered 21 to 26. Built by Mitsubishi Heavy Industries, the trains are marketed by the manufacturer as Urbanismo-16, referring to their gross weight of per car. The cars have aluminium bodies, carbon-fiber-reinforced polymer front ends, and lightweight bogies, making them approximately lighter than earlier series. Their hexagonal cross-section bulges slightly outward on both sides, allowing the seatbacks to be angled for greater comfort. Each set has a different accent colour corresponding to one of the colours in the company's logo, as part of a seven-colour scheme developed for the fleet. The 2020 series received a Good Design Award in 2016 for its design, including its use of interior space and safety and comfort features. Set 21 entered service on 4 November 2015. Set 26 was delivered in November 2024, completing the fleet.
Former rolling stock
The 1000 series was produced by Kawasaki Heavy Industries and Niigata Iron Works and entered service when the line opened in 1983, initially comprising two six-car sets and seven four-car sets. Beginning in 1994, additional cars were built to lengthen the 1000 series to six-car sets, which were renumbered as the 1010 series. Four six-car 1050 series sets were also introduced from 1994 to expand the fleet. The last 1010 series set was retired on June 26, 2016. The last 1050 series set was withdrawn on February 15, 2026.
History
In the early 1970s, planning for what became the Tōhoku and Jōetsu Shinkansen progressed in parallel. However, construction planning took place amid growing public concern over noise and vibration from the Tōkaidō and San'yō Shinkansen. Opposition developed along parts of the planned Tōhoku and Jōetsu corridors. In Ina, where the two Shinkansen lines were planned to branch, residents opposed the project because the construction would divide the town into three sections. Through the efforts of Misao Kato, then the mayor of Ina, an agreement was reached to construct a transit line as compensation for the affected communities, including residents of the neighboring Ōmiya, Ageo, and Ina municipalities. A standard railway was considered excessive given the anticipated demand along the corridor, so a people mover, then a relatively new technology, was chosen as a medium-capacity option. Residents of Toda, Urawa and Yono received a separate heavy-rail route, the Saikyō Line. To reduce costs, the line was built to be manually operated. Saitama New Urban Transit Co., Ltd. was incorporated on 1 April 1980, to operate the new line. The company applied for a local railway business license on 4 December 1980 and received it on 3 April 1981. Construction began on 15 October 1981 and was completed in April 1983. The first section, between Ōmiya and Hanuki, opened on 22 December 1983. The line initially operated with 1000 series trains, and approximately half of the services ran only between Ōmiya and Maruyama; services north of Maruyama operated at 40-minute intervals during the daytime. Construction of the remaining section between Hanuki and Uchijuku was delayed by difficulties acquiring land from two landowners along the planned route. Negotiations with one were completed in March 1988, but the other landowner, supported by activists associated with the conflicts over Narita Airport, continued to oppose the project. The landowner and activists constructed a hut beneath the planned guideway and barricaded themselves inside, while also staging protests from a tower above it. On February 17, 1990, Saitama Prefecture invoked eminent domain to clear the hut, and the landowner and activists were arrested for obstruction. Rather than seizing the land itself, the prefecture acquired an air right over the property, allowing the guideway to pass above it without acquiring the underlying land. A mesh-fenced shelter was subsequently built around the guideway to prevent the landowner from interfering with operations. Remnants of the hut and protest signs remain beneath the line. The remaining section between Hanuki and Uchijuku opened on 2 August 1990, completing the line. On 14 October 2007, Ōnari Station was renamed Tetsudō-Hakubutsukan ( ) to coincide with the opening of the Saitama Railway Museum. On 16 January 2019, a tire on the rear car of an up train suffered a puncture and blowout and derailed from the guideway between Kamonomiya and Tetsudō-Hakubutsukan. The accident suspended service on the entire line until the following afternoon, with substitute bus services provided during the disruption. Following the accident, the company began installing tire-pressure monitoring systems on its trains in 2020.
See also
List of rapid transit systems
References
External links
Text derived from https://en.wikipedia.org/w/index.php?oldid=1376517556 under CC BY-SA 4.0; modifications have been made.