Nord Stream 2 (German–English mixed expression for "North Stream 2"; ) is a natural gas pipeline from Russia to Germany running through the Baltic Sea, financed by Gazprom and several European energy companies. Feasibility studies began in 2011 to expand the Nord Stream 1 line and double annual capacity to , with construction beginning in 2015.
It was completed in September 2021, but did not enter service. Planning and construction of the pipeline were mired in political controversy over fears that Russia would use it, one of 23 pipelines between Europe and Russia, for geopolitical advantage over Europe, and more specifically, Ukraine.
German chancellor Olaf Scholz suspended its certification on 22 February 2022, following official recognition of the Donetsk People's Republic and Luhansk People's Republic by the Russian State Duma and President Putin during the prelude to the Russian invasion of Ukraine. On 26 September 2022, Danish and Swedish authorities reported a number of explosions at pipes A and B of the Nord Stream 1 pipeline and pipe A of the Nord Stream 2 pipeline, with the resulting damage causing significant gas leaks.
The European Union considers the incident to be sabotage of key European energy infrastructure.…
Nord Stream 2 (German–English mixed expression for "North Stream 2"; ) is a natural gas pipeline from Russia to Germany running through the Baltic Sea, financed by Gazprom and several European energy companies. Feasibility studies began in 2011 to expand the Nord Stream 1 line and double annual capacity to , with construction beginning in 2015.
It was completed in September 2021, but did not enter service. Planning and construction of the pipeline were mired in political controversy over fears that Russia would use it, one of 23 pipelines between Europe and Russia, for geopolitical advantage over Europe, and more specifically, Ukraine.
German chancellor Olaf Scholz suspended its certification on 22 February 2022, following official recognition of the Donetsk People's Republic and Luhansk People's Republic by the Russian State Duma and President Putin during the prelude to the Russian invasion of Ukraine. On 26 September 2022, Danish and Swedish authorities reported a number of explosions at pipes A and B of the Nord Stream 1 pipeline and pipe A of the Nord Stream 2 pipeline, with the resulting damage causing significant gas leaks.
The European Union considers the incident to be sabotage of key European energy infrastructure. The Nord Stream explosions also resulted in the worst release of methane gas in human history, with estimates ranging from of methane released into the atmosphere.
In October 2022, Russia confirmed that Pipe B of the Nord Stream 2 pipeline escaped destruction, and offered to resume gas supply to Europe (which was promptly declined by Berlin). Nord Stream 2 never delivered any gas, while Russia suspended gas deliveries through Nord Stream 1 from August 31, 2021, quoting "maintenance needs".
This situation became permanent after the destruction of three of the pipelines in September 2022 and sanctions linked to the Russian invasion of Ukraine. Out of the three separate investigations carried out by Germany, Sweden and Denmark, the latter two were closed without publicly assigned responsibility for the damage in February 2024.
In June 2024 German authorities issued an arrest warrant for a Ukrainian national suspected of the sabotage, who according to the Polish National Public Prosecutor's Office had since fled to Ukraine. In October 2025 the suspect was arrested in Poland, where a Polish court ruled that the European arrest warrant was without merit after which the suspect was released.
In response to the Russian invasion of Ukraine the EU Commission adopted on 18 July 2025 a sanctions package against Russia that bans the direct and indirect use of the Nord Stream pipelines.
History
In 2011, Nord Stream AG started evaluation of an expansion project consisting of two additional lines (later named Nord Stream 2) to double the annual capacity up to . In August 2012, Nord Stream AG applied to the Finnish and Estonian governments for route studies in their underwater exclusive economic zones for the third and fourth lines.
It was considered to route the additional pipelines to the United Kingdom but this plan was abandoned. In January 2015, Gazprom announced that the expansion project had been put on hold since the existing lines were running at only half capacity due to EU sanctions on Russia over the annexation of Crimea in 2014.
In June 2015, an agreement to build Nord Stream 2 was signed between Gazprom, Royal Dutch Shell, E.ON, OMV, and Engie. As the creation of a joint venture was blocked by Poland, in April 2017, Uniper, Wintershall, Engie, OMV and Royal Dutch Shell signed a financing agreement with Nord Stream 2 AG, a subsidiary of Gazprom responsible for the development of the Nord Stream 2 project.
On 31 January 2018, Germany granted Nord Stream 2 a permit for construction and operation in German waters and for landfall areas near Lubmin. In May 2018 construction started at the Greifswald end point. NS2 was expected to reduce gas price in Europe, as LNG has conversion costs.
In January 2019, the US ambassador in Germany, Richard Grenell, sent letters to companies involved in the construction of Nord Stream 2 urging them to stop working on the project and threatening them with the possibility of sanctions. In December 2019, the Republican Senators Ted Cruz and Ron Johnson also urged Allseas owner Edward Heerema to suspend the works on the pipeline, warning him that the United States would otherwise impose sanctions.
Cruz formally proposed such a bill to enable sanctions in November 2021. In December 2019, Allseas announced that the company had suspended its Nord Stream 2 pipelaying activities, anticipating enactment of the US National Defense Authorization Act for Fiscal Year 2020, which contained sanctions.
In May 2020, the German energy regulator refused an exception from competition rules that require Nord Stream 2 to separate gas ownership from transmission. In August 2020, Poland fined Gazprom €50 million due to its lack of cooperation with an investigation launched by UOKiK, the Polish anti-monopoly watchdog.
UOKiK cited competition rules against Gazprom and companies financing the project, suspecting that they had continued work on the pipeline without permission from the government of Poland. In December 2020, the Russian pipelaying ship Akademik Cherskiy continued pipe-laying. In January, Fortuna, another pipe-layer, joined forces with the Akademik Cherskiy to complete the pipeline.
On 4 June 2021, Vladimir Putin announced that the pipe-laying for first line of the Nord Stream 2 had been fully completed. On 10 June, the sections of the pipeline were connected. The laying of the second line was completed in September 2021.
In June 2021, US Secretary of State Antony Blinken said that Nord Stream 2 completion was inevitable. In July 2021, the US urged Ukraine not to criticise a forthcoming agreement with Germany over the pipeline. On 20 July, Joe Biden and Angela Merkel reached a conclusive deal that the US may trigger sanctions if Russia used Nord Stream as a "political weapon".
The deal aims to prevent Poland and Ukraine from being cut off from Russian gas supplies. Ukraine will receive a $50 million loan for green technology until 2024 and Germany will set up a billion-dollar fund to promote Ukraine's transition to green energy to compensate for the loss of the gas transit fees.
The contract for transiting Russian gas through Ukraine will be prolonged until 2034 if the Russian government agrees. On 16 November 2021, European natural gas prices rose by 17% after Germany's energy regulator suspended approval of the Nord Stream 2.
On 9 December 2021, Polish Prime Minister Mateusz Morawiecki called on Germany's newly appointed Chancellor Olaf Scholz to oppose the start-up of Nord Stream 2 and not to give in to pressure from Russia. On a visit to Rome, Morawiecki said: "I will call on Chancellor Scholz not to give in to pressure from Russia and not to allow Nord Stream 2 to be used as an instrument for blackmail against Ukraine, an instrument for blackmail against Poland, an instrument for blackmail against the European Union."
Scholz suspended certification of Nord Stream 2 on 22 February 2022 in consequence of Russia's recognition of the Donetsk and Luhansk republics and the deployment of troops in territory held by the DPR and LPR. Nord Stream 2 AG filed for bankruptcy on 1 March 2022 and laid off all 106 employees1 from its headquarters in Zug, Switzerland.
On 26 September 2022, a massive pressure loss and signs of large gas releases near the Danish island Bornholm were reported. Shortly after, gas leaks from the two pipelines were discovered within the Danish and Swedish economic zones. The day after the leaks occurred, Swedish police opened an investigation of the incident, calling it "major sabotage".
The investigation is conducted in cooperation with other relevant authorities as well as the Swedish Security Service. A similar investigation was opened in Denmark. The two nations were in close contact, and had also been in contact with other countries in the Baltic region and NATO.
These gas leaks were soon considered to be sabotage. On 29 September 2022, the Swedish Coast Guard confirmed a second leak from Nord Stream 2 very close to a larger leak found earlier on Nord Stream 1.
Costs and financing
For Nord Stream 2, the loan from Uniper, Wintershall Dea, OMV, Engie, and Royal Dutch Shell covers 50 percent of the projected costs of €9.5 billion. The rest is being financed by Gazprom.
Project companies
Nord Stream 2 was developed and is operated by Nord Stream 2 AG, a subsidiary of the Russian state energy company Gazprom headquartered in Zug, Switzerland.
Contractors
was one of the ships involved in pipelaying. Nord Stream 2 was laid by Allseas using pipe-laying vessels Pioneering Spirit and Solitaire, except the part of the German offshore section which was laid by Saipem's pipe-laying vessel C10. Pipes were manufactured by EUROPIPE, OMK and the Chelyabinsk Pipe-Rolling Plant (Chelpipe), and were coated by Wasco Coatings Europe.
Blue Water Shipping handled the transportation and storage of pipeline segments in Germany, Finland and Sweden for Wasco. A joint venture of Boskalis and Van Oord did rock placement at the preparatory stage of construction. Kvaerner did the civil and mechanical engineering of the onshore facilities in Russia.
Route
Except for the Russian and Danish section, the route of Nord Stream 2 follows mainly the route of the Nord Stream 1 pipeline.
Russian onshore-pipeline
To feed Nord Stream 2, of new pipeline and three compressor stations were built and five existing compressor stations were expanded. The feeding pipeline starts in Gryazovets and follows the existing route of the Northern Lights pipeline. In Volkhov, the pipeline turns south and continues to the Slavyanskaya compressor station near Ust-Luga.
Baltic Sea offshore pipeline
Nord Stream 2 starts at the Slavyanskaya compressor station near Ust-Luga port, located south-east of the village of Bolshoye Kuzyomkino (Narvusi) in the Kingiseppsky District of the Leningrad Oblast, in the historical Ingria close to the Estonian border. A onshore pipeline runs from the compressor station to the landfall at the Kurgalsky Peninsula on the shore of Narva Bay.
The landfall point in Kolganpya (Kolkanpää) at the Soikinsky Peninsula was considered as an alternative. Except for the Russian section, the route of Nord Stream 2 follows mainly the route of Nord Stream 1. From the Russian landfall, a section runs through Russian territorial waters to the Finnish exclusive economic zone.
The Finnish section is and the following section in the Swedish exclusive economic zone is long. The Danish sections runs on the Danish continental shelf southeast of Bornholm. The German part of the pipeline consists of of offshore pipeline and onshore pipeline connecting the landfall with the Nord Stream 2 receiving terminal.
Nord Stream 2 has two parallel lines, each with a capacity of of natural gas per year.
German onshore pipelines
Nord Stream 2 is connected to the NEL pipeline and European Gas Pipeline Link (EUGAL), which runs largely parallel to the OPAL pipeline.
EU gas directive
According to the amended EU gas directive, the EU extended its gas market rules to external pipelines entering the EU internal gas market. It applies to all pipelines which were completed after 23 May 2019 when amended directive entered into force.
Additional legal concerns relate to international trade law and to the law of the sea in connection with Nord Stream 2's route through the Danish territorial waters around Bornholm. Nord Stream 2 AG had started legal proceedings in the Court of Justice of the European Union to annul the amended directive and also started arbitration against the EU under the Energy Charter Treaty.
Although Russia has not ratified the Energy Charter Treaty and has terminated its provisional application, both the EU and Switzerland — a domicile of Nord Stream 2 AG — are contracting parties of it.
Regulatory clearance by Germany
In late October 2021, the approval of the pipeline was still in process as permits were expected from the German regulatory Federal Network Agency ( ) and finally from the European Commission later that year. The German agency still awaited the processing of applications by the Ukrainian gas company Naftogaz and the Ukraine gas grid company GTSOU.
Poland also voiced opposition to the approval of the pipeline as it feared a lack of Russian gas transits through its territory. However, spokesperson for the German Ministry of Economy Beate Baron said on 22 October 2021 "all the available capacities for natural gas supplies from Russia to Europe are used".
Earlier that week, the Swiss-based operator confirmed it had filled the first line of the pipeline with "technical" gas. On 21 October 2021, Russian President Vladimir Putin stated that the pipeline would start gas delivery the day after Germany approved it. Regulatory clearance for Nord Stream 2 would double Russia's gas exports to the Baltic and Germany to per year.
Economic pressures for its approval in Germany were mounting, as tight supplies and soaring prices increased costs in transportation and heating fuel markets. Approvals for gas delivery through the fully constructed pipeline were further delayed in late November 2021, when Germany required that part of the assets of the Switzerland-registered Nord Stream AG including the pipeline itself to be transferred to a Germany-registered business entity.
Concurrently, the US Department of State imposed more financial sanctions on Russian companies connected to Nord Stream 2. President Joe Biden earlier waived sanctions on German companies involved in the project.
The US and the European Union had accused Russian-owned Gazprom of not having delivered sufficient gas through existing pipelines, while Russia claimed that those pipelines were already delivering natural gas at full capacities. According to energy analysts, the delay of gas deliveries through Nord Stream 2 had significantly exacerbated the 2021 energy crisis.
Political aspects
President Barack Obama opposed Nord Stream 2, echoing the policy of his predecessor George W. Bush who opposed Nord Stream 1. The US and European nations such as Ukraine, Poland, Estonia, Latvia and Lithuania opposed Nord Stream 2 on the grounds that it increased dependence on Russian energy and posed a security threat to the EU.
After 2014, these countries further argued that Europe should not be refilling Russia's coffers after it invaded and annexed Crimea. In January 2018, United States Secretary of State Rex Tillerson reaffirmed the policy, stating US and Poland opposed the Nord Stream 2 pipeline, for the same reasons of European energy security and stability.
The Nord Stream 2 pipeline has been opposed by a wide range of US and European leaders, including Ukrainian President Volodymyr Zelenskyy, Polish Prime Minister Mateusz Morawiecki, Slovak President Zuzana Čaputová, US President Donald Trump, former US President Joe Biden, Estonian PM Kaja Kallas, the European Council President Donald Tusk and former British foreign minister Boris Johnson. Tusk has said that Nord Stream 2 is not in the EU's interests.
Former Italian Prime Minister Matteo Renzi and Hungarian Prime Minister Viktor Orbán have questioned the different treatment of Nord Stream 2 and South Stream projects. Some claim that the project violates the long-term declared strategy of the EU to diversify its gas supplies.
A letter, signed by the leaders of nine EU countries, was sent to the EC in March 2016, warning that the Nord Stream 2 project contradicts the European energy policy requirements that suppliers to the EU should not control the energy transmission assets, and that access to the energy infrastructure must be secured for non-consortium companies. An anti-trust investigation against Gazprom started in 2011 revealed a number of "abusive practices" the company applied against various recipients in the EU and Nord Stream 2 was criticized from this angle as strengthening Gazprom's position in the EU even more.
European Commission officials expressed the view that "Nord Stream 2 does not enhance [EU] energy security". Sberbank's investment research division in 2018 voiced concerns from Russian stakeholders' perspective, specifically that the project's goals are exclusively political:
Public opinion in Germany
A representative Forsa study conducted in May 2021 found that 75% of Germans were in favor of the construction of Nord Stream 2, while only 17% were against it. The survey found that broad support for the completion of the project could be found in all voter groups. This was after Germany's phase out from nuclear power plants.
Criticism of US sanctions and obstruction efforts
The Ost-Ausschuss der Deutschen Wirtschaft (Committee on Eastern European Economic Relations) criticised that US sanctions and obstruction efforts were thus threatening democratic processes in Germany and Europe, endangering Germany's interests, and causing damages estimated to be several billion euros at the expense of European taxpayers and businesses.
Others
The Economist warned that Europe was becoming more dependent on Russia while its own reserves decline. Vincent Roberti of Roberti Global and Walker Roberts of BGR Group have received more than $5 million and $1.3 million respectively to lobby the US Congress for the gas project.
In 2024 German FAZ published results of investigation indicating that the certification for Nord Stream 2 construction was issued in conflict on interest and involving political pressure and various personal-business connections, and it likely should have never been granted.
2022 sabotage
On 26 September 2022, Denmark and Sweden almost simultaneously reported four gas leaks from Nord Stream 1 and 2 in the Baltic Sea; two leaks in the economic zone of each country. Despite the fact that Nord Stream 1 was shut down and Nord Stream 2 had not commenced transporting gas, there was gas under pressure in each of the four pipes, most of it methane.
More than half of the gas had already leaked out at the time of reporting, and there were no containment mechanisms in the pipelines the rest of the gas was expected to leak out before 1 October. By 10 October, some gas was still seeped out of Nord Stream 2, with a surface plume wide.
Andrew Baxter, director of energy strategy for the Environmental Defense Fund, said he estimated that about of methane had been released into the environment. To date, this may be the largest gas leak in human history. According to German estimates, about of methane, which is one of the most potent greenhouse gases (more potent than CO 2 ), was emitted into the atmosphere.
This amount of gas is enough to affect the environment for another 20 years, with an annual gas emission capacity of 5.48 million combustion-engined cars. On 29 September, Russian President Vladimir Putin said the "unprecedented sabotage" against the Nord Stream gas pipelines was "an act of international terrorism" carried out by the West, US forces specifically, claiming the United States would have "much to gain from sabotaging the pipelines" even offering to keep supplying the EU by the only Nord Stream 2 gas pipeline that remained operable.
The charge was denied by both US and its NATO allies. While not directly pointing fingers at Russia, European leaders have suggested a foreign attempt to "energy blackmail" NATO citizens into withdrawing their support in Ukraine while noting that it is Russia, not Europe, that benefits from chaos in the energy markets and the war.
Two artificial craters, apart, each with a depth of were found on the seabed with pipeline debris scattered up to away. Denmark, Germany and Sweden each initiated separate investigations, describing the explosions as sabotage.
The Swedish and Danish investigations were closed in February 2024 without identifying those responsible, however the German public prosecutor affirmed in July 2026 that the man responsible for the sabotage was following orders from Ukraine.