Nuremberg U-Bahn

The Nuremberg U-Bahn is a rapid transit system in Nuremberg and Fürth, Bavaria.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 17 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The Nuremberg U-Bahn is a rapid transit system in Nuremberg and Fürth, Bavaria. It is operated by Verkehrs-Aktiengesellschaft Nürnberg (VAG; Nuremberg Transport Corporation), which itself is a member of the Verkehrsverbund Großraum Nürnberg (VGN; Greater Nuremberg Transport Network).

The Nuremberg U-Bahn is Germany's newest metro system, having begun operation in 1972, although the Nuremberg-Fürth route (U1) uses part of the right of way of the Bavarian Ludwig Railway, which was Germany's first passenger railway opened in 1835. The current network of the U-Bahn is composed of three lines, serving 49 stations, and comprising of operational route, making it the shortest of the four heavy-rail metro systems in Germany, behind Berlin, Hamburg and Munich.

In 2008, driverless and fully automated trains were introduced on the new U3 line, making it Germany's first automatic U-Bahn line. U2 was converted to driverless operation by 2010, the first such conversion anywhere in the world.

Planning a basic network

Initial considerations for a metro network already existed after the City Council decision of 1965, but concrete Grundnetz (starting or basic network) planning began only in the late 1960s after the adoption of the land-use plan of 1969. The first metro axis (what is now U1) was at this time already under construction and thus included in all variants.

It was to connect the newly emerging satellite town of Langwasser via the main station, the old town and the Plärrer with Fürth and follows essentially the former tram line 1. Important goals for the other lines were the connection of the destinations airport, Meistersingerhalle, Municipal Hospital (today: Klinikum Nord ) and Tiergarten, covering as much of the urban area with as few stops as possible and the easy possibility to extend the base network into new urban development zones.

All these considerations eventually led to a large number of network proposals, of which the models P, Q, R and S most closely approximated the specifications.

Construction

On 20 March 1967, German transport minister Georg Leber and Nuremberg Oberbürgermeister ("Lord Mayor") Andreas Urschlechter (both SPD) had the honour of "striking the first blow" for the new metro. This was done in Bauernfeindstraße when they triggered the pile driver.

On 1 March 1972, the first stretch of the system opened, U1 Langwasser Süd to Bauernfeindstraße. An elevated line from Muggenhof station to Stadtgrenze station started construction along with the works on the first stretch of U1 in the Southeast of Nuremberg. This line along Fürther Straße would be used on an interim basis for the Straßenbahn (Tram) from 1970 to 1981 before being opened for the U-Bahn in 1982.

Over the next few years, further stretches of U1 were opened. Uniquely, the metro was built "from the outside in", starting in the rather outlying area of Langwasser before reaching the historical core and the central train station. Langwasser was a new housing development with many high-rise buildings assembled from prefabricated parts as was the style in that era.

Similar developments in East Germany are known as Plattenbau. When Plärrer station was built, it was built with two sets of tracks above each other and provisions were made for another level of tracks to cross the existing tracks. The former has been in use for U2 (and later U3) ever since those lines opened, whereas the latter has never been fully built up as of 2024.

Unlike at Hauptbahnhof where U2/U3 and U1 stop on different levels, at Plärrer there is one track on both levels used for U1 and the other for U2/U3, enabling easier change between trains (Cross-platform interchange). The first subway line reached Fürth Hauptbahnhof in 1985 which would remain its endpoint until 1998.

The focus thus shifted to the construction of a second subway line in Nuremberg. On 28 January 1984, Nuremberg's second U-Bahn line, U2, went into service between Plärrer and Schweinau. This line, too, underwent further extensions, eventually even reaching the airport in 1999 — the last extension of U2 as of 2024.

Even during construction, provisions were made for future branching extensions at Rothenburger Straße station and Rathenauplatz station. Those tunnel stubs were indeed used roughly two decades later when what is now U3 was built. Expansions of the metro were often accompanied with the closure of nearby tram lines, which was initially not opposed by most of the city's population.

The original plans of the 1960s had called for the complete abandonment of the tram network if and when the metro was fully built out. However, in the 1990s a change of course became apparent and the decision to shut down the tram network was officially reversed.

Nonetheless, in the course of the construction of the northern branch of U3, further shutdowns of trams occurred along Pirckheimerstraße – however, the tracks are still operational for non-revenue movements of trams or in case of interruptions on the rest of the network and it is variously debated to restart revenue service on those tracks. On 4 December 2004, a new section of U1 opened in Fürth, stretching from Stadthalle station to Klinikum station and allowing a further interchange with S1 (Nuremberg S-Bahn), which was extended to serve that station in 2010.

On 8 December 2007, U1 was further extended to Fürth Hardhöhe. Those were the last (as of 2024) extensions of U1. On 14 June 2008, the newest U-Bahn line, U3, opened for service.

U3 was first extended in 2011 with Kaulbachplatz and Friedrich Ebert Platz (interchange for Tram line 4) opening on 11 December. U3 was extended again in 2017 with Klinikum Nord and Nordwestring being the latest stations to open on its northern branch on 22 May. The latest station to open was on 15 October 2020, Großreuth bei Schweinau, along the southern branch of U3.

Further extensions along the same branch with tentative names "Kleinreuth" and "Gebersdorf" are already planned or under construction.

U11

Eberhardshof ↔ Messe U11 service ran on the U1 line between Eberhardshof and Messe most of the day, adding passenger capacity between Nuremberg main station, the car-free main shopping district and the Plärrer.

U21

Röthenbach → Ziegelstein U21 trains ran only from Röthenbach to Ziegelstein on the U2 line. Since the single-track tunnel between Ziegelstein and Flughafen (Airport) could only accommodate a train frequency of 400 seconds at the time (or roughly one train every 6 minutes), only every second train during the day ran to the airport, while the other trains reversed at Ziegelstein.

On their way back all trains were designated as U2 since they all run to Röthenbach, and their origin – Ziegelstein or Flughafen – was meaningless to passengers. U2 trains terminating at Ziegelstein are still operated but signaled as U2 to passengers.

U1

Fürth Kieselbühl With Fürth Hardhöhe station, the U1 has reached its provisional terminus after 40 years. Whether Fürth Kieselbühl station, northwest of Hardhöhe, is still to be built depends mainly on the financial power of the city of Fürth and on the development of this district. The area is designated in the land use plan as a commercial area.

If the area were to be developed in the future, an extension of the metro could take place in connection with the construction of a park-and-ride facility. However, the city of Fürth has rejected various plans for developing the area currently filled with home supply and grocery stores.

Nuremberg University With the decision in 2017 that Nuremberg should become a university city, policy planning for a metro station University was determined. The metro stop is projected in the Brunecker Straße industrial area, between Hasenbuck and Bauernfeindstraße stations, where the university and the new urban quarter of Lichtenreuth are planned.

Branch Scharfreiterring Further discussion refers to a possible branch of the metro from Scharfreiterring station to Klinikum Nürnberg-Süd. Intermediate stops could possibly be Thomas-Mann-Straße and Gleiwitzer Straße.

U2

With the route to the airport/Flughafen station in use, the part of the U2 within Nuremberg has been completed. A possible extension towards the new tram terminus "Am Wegfeld" is not deemed sensible.

Marienberg When the extension from Ziegelstein to the airport was built, provisions were made for a future infill station at Marienberg to serve a potential new commercial and/or housing development. The section between Ziegelstein and Airport is by far the longest stretch between two stops in the entire network.

Branch northeast station (Nordostbahnhof) To better serve the industrial development at Nordostpark (currently only served by buses) a branch of U2 eastward from Nordostbahnhof has been proposed. Branch Hohe Marter Another proposal for a branch off of U2 would branch at the second to last stop in the southerly direction, Hohe Marter, in a roughly southeasterly direction toward the neighborhood of Eibach.

While Eibach is already served by the S-Bahn, the stop is out of the way of most development. Further extensions of such a branch towards Reichelsdorf have thus far failed to reach a benefit cost ratio above 1.0 and are thus unlikely to get the federal money that is widely seen as precondition for construction.

U3 Nord (Northern branch)

The northern branch (U3 Nord) diverts from the U2 tunnel north of Rathenauplatz to run west under the northern quarters of Nuremberg. This branch consists of 5 stations, of which three stations (Maxfeld, Kaulbachplatz and Friedrich-Ebert-Platz) have been completed until December 2011.

The last two stations (Klinikum Nord and the terminus station Nordwestring) have been completed in December 2016 and were opened for service in May 2017, thus completing this branch. In 2018, the local SPD proposed to extend the U3 to a proposed housing project in Wetzendorf.

However, a subsequent study showed that it was extremely unlikely such an extension would achieve a benefit cost quotient anywhere near 1.0.

U3 Süd (Southern branch)

The southern branch (U3 Süd) diverts from the U2 tunnel south of Rothenburger Straße and runs to the west as well. Three stations of this branch (Sündersbühl, Gustav-Adolf-Straße and Großreuth) have been completed.

The terminus of this branch, to be opened around 2025 or later, will be Gebersdorf near the former station Fürth Süd of the abandoned Bibertbahn railway at a busy street intersection south of Fürth's city limits. Further expansion beyond that is under consideration on the right of way of the abandoned Bibertbahn railway into Zirndorf and possibly beyond.

A new station called "Großreuth bei Schweinau" started service on 15 October 2020 marking the latest extension of the network. Further extensions are planned along this branch with construction already underway for a new station "Kleinreuth" and a further station tentatively called "Gebersdorf" planned roughly at the site of the former "Fürth Süd" station along the abandoned :de:Bibertbahn.

Possible U4

Since the earliest plans (see above) called for more than two fully fledged "main lines" with two branches (U3 South and North) branching from them, there have been discussions of a third "main line" or another branch similar to U3. However, the financial situation of Nuremberg would only allow for such a line to be constructed with federal or state funds.

Federal funds are conditional on a "benefit cost quotient" which is calculated according to standardized measures and has to reach a value above 1.0 (i.e. "benefits" need to exceed "costs") and thus far (2020) most proposals have not reached this threshold. In general the local CSU has been in favor of a new U4 whereas the SPD and the Greens tended to be more skeptical about new metro construction.

As Nuremberg has had a SPD mayor for most of its postwar history – excepting the 1996–2002 period in office of Ludwig Scholz (CSU) and the period during which Andreas Urschlechter (formerly SPD) ran as an independent – the debate about a new U4 has been mostly theoretical. However, in the 2020 municipal elections the office of Lord Mayor was won by CSU-candidate Marcus König who had campaigned on the promise of metro extensions.

Which route such a metro would take is not entirely clear, but proposals to serve ("Zabo") are among the more frequent ones.

Extensions to the Landkreis Fürth

Possible extensions to the U2 and U3 are currently in competition with each other. For cost reasons, only one of the two projects will be implemented.

The current southern terminus of U2, Röthenbach, is by far the busiest in the network and as it is served by both a large P&R multistory carpark (shut down in 2020 and subsequently demolished ) and several bus lines, the question of extending the line to serve those currently using the buses and the parking garage has come up repeatedly since the opening of the station in 1986. Extension of the U2 from Röthenbach to Stein was part of the network plans dating from the 1970s. A profitability study from 1994 reported a cost-benefit factor of 0.33, thus not reaching the target of at least 1 that was required for funding, although that study examined only the subsection from Röthenbach to the planned end point in Deutenbach.

In 1997, the Zweckverband Verkehrsverbund Greater Nuremberg (ZVGN) commissioned the engineering firm Intraplan Consult to carry out another study, this time for the section from Nuremberg Hauptbahnhof to Deutenbach. This study yielded a cost-benefit factor of 1.7 at an estimated total construction cost of 159.01 million euros (311 million D-Mark).

On that basis, the extension of the U2 was decided by the Nuremberg City Council. The Stein authorities were also in favour of the construction, in order to reduce traffic on the B14 road, but could not afford their share of the construction costs (over 1 million D-Mark) and the operating costs.

The automation of the U2, which has been completed in 2010, would provide a new opportunity for extension to the neighboring city, which both cities are still interested in. With this in mind, ZVGN prepared a new study to investigate the impact of automatic operation on operating and maintenance costs.

After the U3 extension to Zirndorf was rejected by referendum, the mayor of Stein, Kurt Krömer, called for a rapid investigation of the U2 extension parallel to the remaining U3 extension in the direction of Oberasbach / Leichendorf, to avoid missing the opportunity of obtaining subsidies under the Municipal Transport Financing Act that would expire in 2013. When the results of the study were presented on 23 September 2013, however, the conclusion was that the chances of a benefit-cost indicator of at least +1.0 were small.

In 2013, the plans for the extension to Stein were shelved by the traffic committee of the Fürth rural district council. There was criticism because the profitability study examined only the new section from Stein to Röthenbach, not up to Plärrer in Nuremberg. Current political planning includes only one additional station, "Schloss Stein " (Stein Castle).

In the press conference held on 23 March 2010 it was announced that there would be no extension of the U3 to Oberasbach. According to the report, neither of the two alternatives (a tunnel under the Rothenburger Straße to Oberasbach Süd with a cost-benefit factor of 0.44 or an above-ground route following the old Bibertbahn railway to Oberasbach Nord with a negative cost-benefit factor of −0.04) achieved the legally required 1.0.

Rolling stock

The Nuremberg U-Bahn currently uses two classes of trains. Its former DT1 vehicles are largely the same design as the A cars found on the Munich U-Bahn, and both transport companies once lent each other trainsets as reserve rolling stock for major events (such as the Munich Olympics) at the time when both systems were quite new.

Such swaps are now no longer possible, as the rolling stock on each system have developed in ways that would require modification for use on the other system. The newer Nuremberg trains (the DT3, for example) are incompatible with the Munich system. While A cars are still in use in Munich, the DT1 was withdrawn from service in Nuremberg in 2023.

Two units (forming one train) are to be preserved as heritage vehicles. The DT2 which was last used during the 50 year anniversary celebrations of the network in 2022 is to be scrapped entirely due to lack of space to store any preserved units. Especially the DT1 was sometimes called "Pegnitzpfeil" by local media reports.

The Pegnitz is a river that runs through Nuremberg, while "Pfeil" is the German word for "arrow". In 2004, 6 Munich A cars were bought by VAG to supplement its own rolling stock fleet. However, owing to the divergence in specifications between the Nuremberg and Munich systems, it turned out that the old Munich stock could not be coupled with Nuremberg stock.

As a result, it was not possible to compose trains using both types, although they can at least run on the same tracks. VAG left the Munich stock in its old white and blue Munich livery, reasoning that it was not worth repainting in Nuremberg livery, given that it was approaching the end of its service life.

Technical problems leading to a 2-year delay

Construction of the line started in 2003, with the DT3 units ordered in the same year, and opening of the initial line segment from Maxfeld to Gustav-Adolf-Straße had been scheduled for early 20061 to be operational for the 2006 FIFA World Cup. Initially it was thought by Siemens and VAG that development, testing and certification of the ATC components could be conducted during those 3 years in parallel to the construction of the line, at first in simulations and, after the first DT3 units had been delivered, on a test track at the Langwasser Depot, and that the new line could enter service immediately after the tunnels and stations were built.

However, in 2005 news was published that ATC development was not progressing as planned and that the opening would have to be postponed by one year to late 2006 or early 2007. In fall 2006 the responsible parties had to admit that the ATC system would still not be ready by the already postponed date at the end of 2006 and that the opening of the line would have to be postponed again.

At that point, Siemens appointed a new project manager. The new U3 line finally opened on 14 June 2008.

To Siemens this delay is a major embarrassment, since the company hopes to sell this ATC system to other metro operators around the world who wish to gradually convert their existing metro lines to ATC operation, allowing for mixed operations on line segments used by ATC and non-ATC operated trains during interim periods.

Conversion of the U2 for ATC operation

After the initial segment of the U3 had entered service and all problems concerning the ATC system had been sorted out, work commenced on the conversion the existing U2 to ATC operation. Full ATC operation of the U2 begun in January 2010 and on the shared section of track between Rathenauplatz and Rothenburger Straße the interval between trains on that tunnel segment reduced to 100 seconds.

(See above) VAG Nuremberg official site VAG Nürnberg official site Implementation of an automated metro in Nuremberg Page on U-Bahn and S-Bahn in Nuremberg Page on local transport in Franconia pics from Nuremberg underground Nuremberg U-Bahn Map

Text derived from https://en.wikipedia.org/w/index.php?oldid=1375824626 under CC BY-SA 4.0; modifications have been made.