The Nutbrook Canal was a canal in England which ran between Shipley in Derbyshire and the Erewash Canal, joining it near Trowell. It was built to serve the collieries at Shipley and West Hallam, and was completed in 1796. It was initially profitable, but from 1846 faced competition from the railways, and more seriously, subsidence caused by the coal mines that it was built to serve.

With the mines failing to pay tolls for goods carried on the canal, and in some cases refusing to accept responsibility for the subsidence, most of it was closed in 1895, although the final remained in use until 1949.

Construction

Benjamin Outram, a man with previous experience of canal building, having completed the Cromford Canal, and a partner of William Jessop in the Butterley Company, was appointed as engineer, and supervised the direct labour force who built the canal. When built, the canal was long, with thirteen locks, each , giving a total rise of .

The system was fed by Shipley Reservoir, which in turn was fed by the Nut Brook. The canal was brought into use in stages, with the first tolls being collected in November 1794, and 17 boats carrying 639 tons recorded in that year. The canal reached West Hallam in June 1795, but it was not until May 1796 that the final section with its three locks was completed.

Traffic figures for July 1796 showed that 1,602 tons had originated from the Shipley colliery and 1,158 tons from West Hallam. The canal ran beside the Nut Brook for most of its length, diverging at its southern end towards its junction (later known as Nutbrook Junction) with the Erewash Canal just above Heath Lock. There were two significant branches from the main line.

One from just below Moor's Bridge went to Sir Henry Hunloke's estate at West Hallam, while a second, smaller branch left the main line just above Lock 3 to connect with Lord Stanhope's wagonway. The costs of construction overran, and were quoted as £22,801 ( ), in a report to the Derbyshire Justices, made at the start of 1797.

The excess over the £19,500 authorised by the act of Parliament was managed by further calls on the shareholders, and debts were repaid out of the initial receipts.

Operation

Traffic on the canal was never particularly heavy, for even in October 1821, when the canal was most prosperous, there were only about nine laden boats per day using it. Despite this, water supply was a regular problem. When first built, the canal was supplied by a reservoir at Shipley, constructed by building a dam across the valley at the end of the canal.

The resultant lake provided an attractive feature for Shipley Hall, but flooded the coach road which provided access to it, and so a new bridge and road across the top of the dam were constructed. The reservoir was further topped up by a feeder from the stream above Hawley's Pond. In November 1819, plans were made for a new reservoir, to be constructed above Hawley's Pond.

A contract for £790 ( ), for the earthworks was given to Henry West and Joseph Belfield of Shipley, and John Kiddy was awarded a £265 ( ), contract to build a bridge and other stonework. The contractors claimed extra payments for strengthening the dam and providing more puddling when it was tested in February 1821. £1,520 ( ), had been advanced to them, which was well in excess of the actual cost, but they refused to return the excess, and the canal company resorted to legal action to obtain a refund.

Despite the extra provision, there were still problems with providing sufficient water to operate the canal. Toll rates on the canal were set at 8d ( ), per ton for coal from Shipley and West Hallam collieries and for all other goods, with reduced rates of 4d ( ), for other coal moved along the canal but not transferring to the Erewash Canal, and 1d ( ), for coal from the Mapperley, Kirk Hallam, Ilkestone and Little Hallam collieries.

Joseph Outram, the younger brother of Benjamin Outram, complained about tolls for limestone, and they were cut by half from November 1796. Other concessions for road stone, manure, agricultural lime and gravel were made at intervals between 1798 and 1825.

Railway competition was first mentioned in 1832, when the Midland Counties Railway proposed to build a line along the west bank of the Erewash Canal, which would have crossed the Nutbrook Canal near its junction with the Erewash. Although the scheme was not fully sanctioned by Parliament, the full toll of 8d for coal was never charged afterwards.

The Erewash Valley Railway was built in 1846, and although it followed the east bank of the Erewash Canal, branches from it were built to the Shipley Collieries and the Stanton iron mines, which directly affected trade on the canal. However, by reducing tolls, much of the traffic was retained.

Problems

The canal company experienced a steady increase in the cost of maintenance as the years passed. In June 1852, they were notified that unless they paid £832 ( ), in compensation, coal would be mined from beneath the dam of the old reservoir at Shipley. The outcome of this confrontation is not clearly documented.

In 1854, rainfall was less than two thirds of the normal average, and the reservoirs ran dry. Consideration was given to providing other sources of water, and £595 was spent on constructing a small reservoir on Mapperley Brook, and on raising the banks of the old reservoirs at Shipley and Mapperley.

Further problems arose from seepage, which resulted in a puddle bank being constructed at the head of the canal between 1857 and 1866, and extensive puddling being carried out at Limekiln lock in 1866, which had little effect, since canal water was reputedly entering two mines there in 1867. The Derbyshire Assizes Court heard the claim for compensation in 1871, and ruled against the canal owners, who then faced a large bill for the work and another for compensating the mine owners.

Closure of the canal was considered, but instead it was shut in September and October 1871 for the work to be done, and afterwards traffic improved briefly. Railway expansion continued, with both the Midland Railway and the Great Northern Railway building tracks along the Nutbrook valley, which between them included seven bridges over the canal by 1880.

The canal company attempted to sell itself to the Great Northern Railway in 1876, but the railway company declined to buy.

Closure

In June 1895, Smith, acting for the canal, gave notice to the collieries that the gates of the locks above Stanton would be locked shut, as large amounts of rent were outstanding. The company attempted to obtain an act of abandonment in February 1896. The action was opposed by Manners Colliery, West Hallam Colliery, the Erewash Canal, the Grand Junction Canal, and a number of councils.

Evidence was heard in March 1896, by which time £1,258 had been spent, and the canal company decided to withdraw the bill, rather than run up more debts. The middle section of the canal was bypassed by a pipe, laid under the towpath, to ensure Stanton Ironworks still had a supply of water. No further action to repair the canal was taken.

In 1907, the company replied to a request from the Board of Trade for a statistical return that the canal was derelict, apart from "kept open for Stanton". A request from the Midland Railway to convert bridges over the canal into embankments was denied by the proprietors, on the basis that they did not have to authority to grant it.

The railway bridge at West Hallam was rebuilt in the 1950s, although that at Derby Road was partly filled in at the same time. The road bridge at New Stanton was lowered in 1913 by the Ironworks Company, who attempted to get Shardlow Rural District Council to contribute to the cost, but there is no known record of the outcome.

The legal status of the abandoned canal was formalised in 1925, when two holding companies were created, Nutbrook No 1 Company, to hold the shares of the original company, and Nutbrook No 2 Company to hold the shares of Nutbrook No 1 Company, and to attempt to purchase the freehold of the canal bed, to remove the burden of rental payments. The Stanton Ironworks stood across the junction of the Nutbrook and Erewash Canals (and still does under different ownership) and continued to use the bottom section for the transport of finished iron products.

Boats were loaded just above the second lock, but the volume of goods leaving the works by boat gradually declined. This part of the canal saw an increase in traffic during the Second World War in support of war efforts, with the carriage of slag bound for West Drayton, which was used in the construction of airfields, and bomb cases from a new foundry at Stanton Gate, opened by the Ministry of Supply.

Stanton Ironworks sold all of their boats in July 1947, and some traffic continued until March 1949, when the last boat used the canal. A total of 59,411 tons were carried along this short stretch between 1940 and final closure. In 1946, the Stanton Company paid £1,500 ( ), to Shipley Collieries for all of the canal south of the Shipley boundary, in order to safeguard its water supply.

This did not include either Shipley or Mapperley reservoir, as the canal company never owned the freehold of these. The shares of the Nutbrook No 1 Company were transferred to the Stanton Company in late 1948, and this is where ownership still lies.

Stanton Ironworks expressed interest in purchasing Mapperley reservoir when the National Coal Board sold the Shipley estates in 1966, but there were objections to their intent to raise and lower the water levels as required.

Remains

A section of the canal above lock 3 remains in water, although the lock gates have been removed and replaced by weirs. Beyond this section, footpaths follow the course of the canal as far as Hallam wharf. Below lock 3, most of the canal has been filled in as the ironworks have expanded, but a pipe in the bed of the canal still delivers water to the works.

The four-storey toll house at the Ladywood Road bridge remained until 1965 when it was demolished by the local council. Mapperley reservoir and Hawley's Pond are still there, but Shipley reservoir has been transformed as its site was occupied by the lake at the centre of The American Adventure Theme Park, until its closure in 2007.

Two original bridges connected with the reservoir are located at its southern end. Colliery Road Bridge is a single-arched grade II listed structure built of sandstone and red brick, while Paul's Arm Bridge is of a similar construction but has two arches. The Great Northern Railway Branch through Stanton Ironworks crossed the canal within the works.

The bridge over which the railway crossed is notable for having been damaged during a bombing raid by German airships in 1916 during World War One. Part of the derelict canal is used for angling. The Stanton Fishing Club manages and maintains a section of the canal on Quarry Hill road in Ilkeston.

Nutbrook Canal History and Route

Text derived from https://en.wikipedia.org/w/index.php?oldid=1377225251 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

3 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.