Nyerere Bridge

Nyerere Bridge ( ), unofficially known as Kigamboni Bridge, is a 680-meter-long bridge located in the Dar es Salaam Region of Tanzania that connects the Temeke District's ward of Kurasini from the east to the west of Kigamboni District's…

Uses your system voice; voice and rate in settings.

Snapshot

≈ 3 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Nyerere Bridge ( ), unofficially known as Kigamboni Bridge, is a 680-meter-long bridge located in the Dar es Salaam Region of Tanzania that connects the Temeke District's ward of Kurasini from the east to the west of Kigamboni District's Vijibweni ward across the Kurasini estuary. Construction work began in February 2012 and completed in April 2016.

The completion of the bridge has offered an alternative transport link to the new district of Kigamboni. Previously, the Kivukoni ferry provided a quick transport link between south east of the Dar es Salaam Central Business District specifically from south east of Kivukoni to north west of Kigamboni.

The bridge has six lanes (three on each direction) and two pedestrians/cyclists lanes with width of 2.5 meters (one on each side). Construction of 2.5 km approach roads were completed with 1 km on the Kurasini side in Temeke District and 1.5 km on the Kigamboni side.

The road joins the Nelson Mandela expressway through elevated free interchange to separate traffic approaching and leaving the junction. There is a toll plaza for controlling and charging of vehicles passing through the bridge. A total of 14 controlled lanes are going to be in this area (seven for each of the two directions).

Nyerere Bridge ( ), unofficially known as Kigamboni Bridge, is a 680-meter-long bridge located in the Dar es Salaam Region of Tanzania that connects the Temeke District's ward of Kurasini from the east to the west of Kigamboni District's Vijibweni ward across the Kurasini estuary. Construction work began in February 2012 and completed in April 2016.

The completion of the bridge has offered an alternative transport link to the new district of Kigamboni. Previously, the Kivukoni ferry provided a quick transport link between south east of the Dar es Salaam Central Business District specifically from south east of Kivukoni to north west of Kigamboni.

The bridge has six lanes (three on each direction) and two pedestrians/cyclists lanes with width of 2.5 meters (one on each side). Construction of 2.5 km approach roads were completed with 1 km on the Kurasini side in Temeke District and 1.5 km on the Kigamboni side.

The road joins the Nelson Mandela expressway through elevated free interchange to separate traffic approaching and leaving the junction. There is a toll plaza for controlling and charging of vehicles passing through the bridge. A total of 14 controlled lanes are going to be in this area (seven for each of the two directions).

Artist's Impressions

Text derived from https://en.wikipedia.org/w/index.php?oldid=1364187631 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

5 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.