Oakridge Park

Oakridge Park (formerly known as Oakridge Centre) is a major mixed-use development and shopping centre in the Oakridge neighbourhood of Vancouver, British Columbia, Canada.

Uses your system voice; voice and rate in settings.

≈ 4 min read

Cite, export and learn8 citation formats · 8 exports · lesson and quiz

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Oakridge Park (formerly known as Oakridge Centre) is a major mixed-use development and shopping centre in the Oakridge neighbourhood of Vancouver, British Columbia, Canada. It is located at the intersection of West 41st Avenue and Cambie Street.

The site is being redeveloped through a high-density urban complex featuring residential towers, office space, a community centre, a rooftop park, and a luxury retail district opening in phases. The first phase of the newly branded Oakridge Park opened in May 2026.

The original mall opened in 1959 and was anchored by Woodward's Stores until 1993, when Hudson's Bay acquired the company and became the mall's anchor tenant, along with Zellers and Safeway. It is one of the two largest malls in the city of Vancouver, alongside CF Pacific Centre, and together they are historically among the most profitable shopping centres in Canada.

Redevelopment (2020–present)

Oakridge Park is the over centre point for the Oakridge Municipal Town Centre Project, a Vancouver urban densification program aimed at creating a new transit-oriented, high density hub. It would be surrounded by condominiums, market rentals, affordable rentals, and social housing, much like Vancouver's West End, replacing a neighbourhood of single-family residences, centred around the Canada Line's Oakridge-41st station.

Tower V will be the tallest building outside the downtown peninsula and, along with several other Oakridge Park towers, will be among the tallest buildings in Vancouver. The redevelopment application was approved in 2014, and construction began in 2020.

Designed by Vancouver design architects Henriquez Partners aided by executive architects Adamson Associates and Diamond Schmitt Architects, the project is estimated to have a project cost of . It features an integrated city park with a continuous path for walking, running and cycling, a community centre, a luxury mall, a Time Out Market, a theatre, a library, a large daycare, performance venues, and commercial office space.

Hudson's Bay had originally signed on to anchor the new mall. However, in November 2024, they announced they were pulling out of the deal and would not be opening a store. Following this, it was announced that Altea Active would take over a portion of the second-level space previously designated for Hudson's Bay, with an expected opening in Spring 2027.

Oakridge Park P2 Level 202605.JPG|P2 level Safeway supermarket and carpark Oakridge Park P1 Lower Galleria 202605.JPG|P1 Lower Galleria Oakridge Park West Galleria 2026.JPG|Level 1 West Galleria Oakridge Park East Galleria 2026.JPG|Level 1 East Galleria Oakridge Park South Galleria 202605.jpg|Level 1 South Galleria Oakridge Park Level 2 outdoor fitness area 2026.JPG|Outdoor fitness area in public park

Transportation access

The Oakridge–41st Avenue station on the Canada Line is under the plaza at the southwest corner of 41st and Cambie. The mall is also served by TransLink bus service along 41st Avenue and Cambie Street. As part of redevelopment, a major developer-funded upgrade of the SkyTrain station is scheduled to be completed in the summer of 2026.

This project includes a new secondary underground entrance corridor connecting the station's concourse directly to the mall. The station expansion also adds two new street-level escalators, a new elevator, and a new roof for weather protection. Underground parking can be accessed via 44th Avenue and Cambie Street, 45th Avenue and Cambie Street, or 41st Avenue and Heather Street.

The first two underground parking levels provide 2,000 free, three-hour parking stalls. Due to the ongoing construction, several entrances and parking lots have been closed.

Oakridge Centre 2018.jpg|The main entrance to the former Oakridge Centre (2018) Oakridge Centre Interior 2018.jpg|Former Oakridge Centre 's interior Oakridge Centre South Tower Lobby 2018.jpg|Former South Tower Lobby Oakridge Centre Interior1 2018.jpg|Former Mall Oakridge Centre Food Court 2018.jpg|Former Food Court

See also

List of shopping malls in Canada

Oakridge Policy Planning Program Oakridge Centre redevelopment construction timeline expedited significantly | Urbanized

Text derived from https://en.wikipedia.org/w/index.php?oldid=1378747034 under CC BY-SA 4.0; modifications have been made.

Words in each sectionRedevelopment (2020–pre…Redevelopment (2020–present)Redevelopment (2020–present): 298 words298Transportation accessTransportation accessTransportation access: 144 words144Image galleryImage galleryImage gallery: 51 words51See alsoSee alsoSee also: 6 words6
Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

Provenance

snapshot enwiki-001378747034 · captured 2026-10-05 · ledger · version history

Cite this page as: encyclopegia.org, “Oakridge Park”, snapshot enwiki-001378747034. https://encyclopegia.org/a/oakridge-park

Sources cited in this revision

21 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.