Olive Mount cutting
Olive Mount cutting, which was opened in 1830, is a sandstone railway cutting on the line to Manchester, from Liverpool.
≈ 1 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Olive Mount cutting, which was opened in 1830, is a sandstone railway cutting on the line to Manchester, from Liverpool. The cutting is deep and is situated between Wavertree Technology Park and Broad Green railway stations.
The railway's engineer, George Stephenson, had hoped to avoid the problem of creating the cutting for the Liverpool and Manchester Railway by routing the line further north. However, that plan was objected to by the Earl of Derby and the Earl of Sefton. The cutting was originally designed to accommodate two tracks, and was only wide at the top.
In 1871, it was widened to allow four tracks to enter Liverpool Lime Street, because traffic had increased considerably since the station opened.
External links
Signalling Record Society - Track and signalling diagram of Olive Mount junction, c.1972 Edge Hill Station
Text derived from https://en.wikipedia.org/w/index.php?oldid=1340053558 under CC BY-SA 4.0; modifications have been made.