Lesson plan

Otis Bridge

The Otis Bridge is a six-lane girder bridge crossing the Estero de Concordia, a tributary of the Pasig River, in Manila, Philippines. Constructed in 1968, it carries Paz Mendoza Guazon Street, formerly known as Otis Street (named after the American Governor-General Elwell Stephen Otis). The bridge is a major artery for commercial vehicles carrying cargo from the Port of Manila, with around 10,000 trucks crossing the bridge daily. In 2015, the bridge was slated for replacement or reconstruction as it neared the end of its 50-year service life, with initially being allocated for construction work by the Department of Public Works and Highways (DPWH). However, on June 26, 2018, the bridge was ordered closed by the Metropolitan Manila Development Authority (MMDA) on the advice of the Manila Disaster Risk Reduction Management Council after media reports showed that long cracks started appearing along the center island, caused by the number of overloaded trucks that used the bridge, as well as construction work on the nearby Concordia Bridge which prevented its timely replacement. The bridge was reopened on December 4, 2018, three months ahead of the March 2019 target date, with being allocated from the national budget for its replacement. Construction took place 24/7 in phases until the project was completed.

Back to article

Article summary

The Otis Bridge is a six-lane girder bridge crossing the Estero de Concordia, a tributary of the Pasig River, in Manila, Philippines. Constructed in 1968, it carries Paz Mendoza Guazon Street, formerly known as Otis Street (named after the American Governor-General Elwell Stephen Otis). The bridge is a major artery for commercial vehicles carrying cargo from the Port of Manila, with around 10,000 trucks crossing the bridge daily. In 2015, the bridge was slated for replacement or reconstruction as it neared the end of its 50-year service life, with initially being allocated for construction work by the Department of Public Works and Highways (DPWH). However, on June 26, 2018, the bridge was ordered closed by the Metropolitan Manila Development Authority (MMDA) on the advice of the Manila Disaster Risk Reduction Management Council after media reports showed that long cracks started appearing along the center island, caused by the number of overloaded trucks that used the bridge, as well as construction work on the nearby Concordia Bridge which prevented its timely replacement. The bridge was reopened on December 4, 2018, three months ahead of the March 2019 target date, with being allocated from the national budget for its replacement. Construction took place 24/7 in phases until the project was completed.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.