Lesson plan
Phú Mỹ Bridge
The Phú Mỹ Bridge ( ) is a cable-stayed road bridge over the Saigon River in Ho Chi Minh City, Vietnam. The bridge was constructed from March 2007 to September 2009 by a consortium consisting of Baulderstone, Bilfinger Berger, Freyssinet (cable stays and stressing), and the Vietnamese company CC620 (concrete, formwork, etc.) and was designed by the French consultant Arcadis (design of the main bridge) and Cardno (design of the approaches). The project manager for the project was AECOM. The Phu My Bridge is 705 metres long across the river, with a main span of 380 metres and the approach viaduct structures on either side of the river are approximately 758m and 638m long respectively. The modified H-shaped main towers, which are 145m high, support a 27m wide main span deck. It has six lanes of traffic; two lanes of vehicle traffic in each direction, and a separate lane for motorbikes and pedestrian footways. The bridge will connect District 2 on the north side of the river to District 7 and forms part of a new ring road currently being built around the south and east of Ho Chi Minh City. The bridge was officially opened to traffic in a ceremony attended by the Prime Minister of Vietnam, Nguyễn Tấn Dũng, along with other Vietnamese and Australian government officials, on 2 September 2009.…
Article summary
The Phú Mỹ Bridge ( ) is a cable-stayed road bridge over the Saigon River in Ho Chi Minh City, Vietnam. The bridge was constructed from March 2007 to September 2009 by a consortium consisting of Baulderstone, Bilfinger Berger, Freyssinet (cable stays and stressing), and the Vietnamese company CC620 (concrete, formwork, etc.) and was designed by the French consultant Arcadis (design of the main bridge) and Cardno (design of the approaches). The project manager for the project was AECOM. The Phu My Bridge is 705 metres long across the river, with a main span of 380 metres and the approach viaduct structures on either side of the river are approximately 758m and 638m long respectively. The modified H-shaped main towers, which are 145m high, support a 27m wide main span deck. It has six lanes of traffic; two lanes of vehicle traffic in each direction, and a separate lane for motorbikes and pedestrian footways. The bridge will connect District 2 on the north side of the river to District 7 and forms part of a new ring road currently being built around the south and east of Ho Chi Minh City. The bridge was officially opened to traffic in a ceremony attended by the Prime Minister of Vietnam, Nguyễn Tấn Dũng, along with other Vietnamese and Australian government officials, on 2 September 2009.…
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.