PNS Hamza
PNS/M Hamza (S-139) is a diesel-electric fast-attack submarine equipped with an air–independent propulsion system and the third submarine of its Agosta 90B/Khalid-class submarine.
≈ 2 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
PNS/M Hamza (S-139) is a diesel-electric fast-attack submarine equipped with an air–independent propulsion system and the third submarine of its Agosta 90B/Khalid-class submarine. It was designed and constructed by the KSEW Ltd. under the technology transfer agreement with France in 1994.
PNS Hamza is the first submarine that has been fitted with the French MESMA system, which was an experimental at that stage – Pakistan is the first country to use the MESMA system in deep sea on board a submarine. It is the first submarine built in South Asia to feature an Air-independent propulsion.
Design overview
PNS Hamza was designed and built by the KSEW Ltd. at the Karachi Naval Dockyard, with the participation of more than 300 civilian engineers and technicians trained in France's defense industry. In 1999–2004, the French and other European contractors reportedly trained more than 600 Pakistani machinists and metal workers in various construction skills of the submarine to meet the challenges of modern warfare in which submarines play a vital role.
The construction of the submarine reportedly involves the employment of the local metal industry in the Navy's submarine construction program as had done previously when was being rebuilt. PNS Hamza is the most advanced version of the design and is more advanced than her two sister ship, and Saad, as its outer hull is light steel structure, HLES 80, was built at the Pakistan Steel and fabricated at the Naval Dockyard in Karachi in element parts and mounted on the inner pressure hull.
The pressure hull section was fabricated and outfitted by the Naval Dockyard in collaboration with the Karachi Shipyard. PNS Hamza was laid down on 1 March 1997 in Karachi, and the steel cutting started by the Pakistan Steel Mills.
The construction of the submarine started in 1998 by KSEW Ltd. at the Karachi Naval Dockyard, followed by fabrication of 12 pressure hull sub-sections and culminating into three pressure hull sections. This was followed by mounting of light bulkheads, internal tanks and ballast panels in August 2003.
Text derived from https://en.wikipedia.org/w/index.php?oldid=1374151885 under CC BY-SA 4.0; modifications have been made.