Project Connect (listed as Proposition A on the general election ballot) is a transit expansion program in Austin, Texas led by the Austin Transit Partnership and the Capital Metropolitan Transportation Authority (CapMetro). The program was approved by voters on November 3, 2020, in a local election concurrent with the 2020 presidential election. The project is estimated to cost $7.1 billion and will be funded with public funds, both federally and locally through increasing the local property tax rate by 8.75 cents. This is a smaller-scale version of the proposal, originally estimated at $10 billion, but ultimately downsized to $7.1 billion due to COVID-induced cost concerns. Plans were again scaled down in 2023 as construction costs had risen since the proposition's passage.

Project Connect (listed as Proposition A on the general election ballot) is a transit expansion program in Austin, Texas led by the Austin Transit Partnership and the Capital Metropolitan Transportation Authority (CapMetro). The program was approved by voters on November 3, 2020, in a local election concurrent with the 2020 presidential election. The project is estimated to cost $7.1 billion and will be funded with public funds, both federally and locally through increasing the local property tax rate by 8.75 cents. This is a smaller-scale version of the proposal, originally estimated at $10 billion, but ultimately downsized to $7.1 billion due to COVID-induced cost concerns. Plans were again scaled down in 2023 as construction costs had risen since the proposition's passage.

CapMetro Rail Red Line infill and improvement

CapMetro's Red Line is a commuter rail service linking downtown Austin to residential neighborhoods in East Austin, the Domain, Research Park, Cedar Park, and Leander. Currently under construction is the future Downtown station, which will connect commuters with the downtown area, giving commuters and visitors direct access to the Austin Convention Center. Multiple upgrades to the red line are proposed by Project Connect. Two new stations were planned, at McKalla (adjacent to the new Austin FC soccer stadium), and at the Broadmoor development. These new stations would replace the existing Kramer station. The installation of positive train control was completed in August 2020. Additionally, once the new Downtown station is complete, the red line will run every 15 minutes, doubling its current frequency and capacity. If Project Connect is built out to its full plan in the future, the red line will be electrified, and station platforms will be extended to accommodate 2-unit trains.

Current Plans

Budget

On September 24, 2024, it was announced that Project Connect would tentatively be going forward with a $193 million budget for the fiscal year and that it would hopefully break ground in 2027. The project also includes two bus lanes that began operating in 2025. The exact budget was $172 million in funding from taxpayers, with the remaining $21 million in investments and other income. The Austin Transit Partnership has estimated it will spend $116 million towards "professional services and administrative costs" with the rest going towards new construction. Of that, $8 million is set aside for the two bus routes, while the remaining cost will go towards environmental impact reviews, as well as overall design. By July 2026, KUT reported that the estimated cost of the light rail line exceeded $8.2 billion, with construction set to begin in 2027 and the first trains on target to run in 2033. Community Impact's reporting in February and April 2026 continued to describe the project as a $7.1 billion, 10-mile system.

Legal controversy

In November 2023, the City of Austin and the Austin Transit Partnership, among others, were sued under the legal theory that the scaled down plans required voter approval. The plaintiffs include former state senator Gonzalo Barrientos (D-14), Travis County Commissioner Margaret Gómez (D), and Austin Council Member Ora Houston (D), with the lead plaintiff being a burger restaurant built in 1926 named Dirty Martin's that was set to be demolished in the original project proposition. They argue that although the scope of the project was reduced in size and cost in 2022, that the reduced scope warrants an entire new proposition, and cannot proceed or be funded without a popular referendum. More specifically, the plaintiffs argue that the city cannot use money that was earmarked for maintenance and operation to be used for debt service on bonds the ATP planned on issuing. Texas' attorney general, Ken Paxton (R) issued an opinion in favor of the plaintiffs, arguing that the ATP's bond funding scheme violates article XI, section 5 of the Texas Constitution. The plaintiffs are requesting that the Travis County district court permanently enjoin the city defendants from “continuing to assess or collect the Project Connect tax because they no longer have voter approval for the tax as required by the Texas Tax Code.” As well as asking for a permanent injunction to prohibit the city and ATP “from spending the Project Connect tax on designing, acquiring right-of-way or constructing the Third Street rail route or the Trinity Street Bridge over Lady Bird Lake.” The case is set to be heard in court on May 28–30, 2024, however, Paxton has attempted to push the hearing until after the 2024 legislative elections seemingly in an effort to reintroduce House Bill 3899, or a similar variant. House Bill 3899 was introduced by Ellen Troxclair (R-19), a former member of the Austin City Council, which would have frozen the project until a new referendum could be held. Despite easily passing the house three times, the bill would be defeated in the Texas Senate each time, triggering the three-reading rule, which prohibits a bill from being read in a single legislative session more than three times. Additionally, Paxton has full authority to approve or deny any entity that wants to issue debt in the state.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1375552528 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

Extracted from the cited revision's reference blocks; absent citations are not invented.