Pujiang Line

The Pujiang Line ( ) is an automated, driverless, rubber-tired Shanghai Metro line in the town of Pujiang in the Shanghainese district of Minhang.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The Pujiang Line ( ) is an automated, driverless, rubber-tired Shanghai Metro line in the town of Pujiang in the Shanghainese district of Minhang. It was originally conceived as phase 3 of Shanghai Metro line 8, but afterwards was constructed as a separate line, connecting with line 8 at its southern terminus, Shendu Highway.

The line opened for passenger trial operations on March 31, 2018. It is the first automated, driverless people mover line in the Shanghai Metro, and has 6 stations with a total length of . The people mover was expected to carry 73,000 passengers a day.

The line is colored gray on system maps. The line is operated by Shanghai Keolis Public Transport Operation & Management Co. Ltd. ( ), a joint venture owned by Keolis and Shanghai Shentong Metro Group for at least five years after opening. |-bgcolor=#cccccc ! colspan=3 align=center|Saturday and Sunday (Weekends) |- |Peak||7:00–20:00|| About 6 min |-bgcolor=#EFEFEF |Other hours|| | About 9 min |- style= "background:# ; height: 2pt" | colspan = "3" | |}

Text derived from https://en.wikipedia.org/w/index.php?oldid=1352758225 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

15 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.