Lesson plan

Quadrant:MK

The Quadrant:MK is Network Rail's national operations centre in Milton Keynes. After being topped out in April 2011, it opened in June 2012. The complex consists of four linked buildings with of space, and is designed to accommodate 3,000 staff. The complex was designed by GMW Architects and built by Royal BAM Group. The centre is on the site of the former England National Hockey Stadium, adjacent to Milton Keynes Central railway station and the A509/A5 intersection.

Back to article

Article summary

The Quadrant:MK is Network Rail's national operations centre in Milton Keynes. After being topped out in April 2011, it opened in June 2012. The complex consists of four linked buildings with of space, and is designed to accommodate 3,000 staff. The complex was designed by GMW Architects and built by Royal BAM Group. The centre is on the site of the former England National Hockey Stadium, adjacent to Milton Keynes Central railway station and the A509/A5 intersection.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.