Qurayyah IPP (QIPP) is a large gas fired combined cycle power station in Qurayyah, Saudi Arabia. The project is being developed on a BOO (Build Own Operate) basis, with finance from international banks (HSBC, Standard Chartered, SMBC) and numerous local banks (Banque Saudi Fransi, National Commercial Bank, Samba, Arab National Bank, Saudi British Bank and Saudi Hollandi Bank).

Technology

The power station consists of six identical groups of equipment provided by Siemens Energy, each with a net output of . Each block has a 2+2+1 configuration consisting of two SGT6-5000F Combustion Turbines, two Heat Recovery Steam Generators, and one SST6-4000 Steam Turbine. At 52%, it is the most efficient power station of its kind in the country, and one of the largest in the world, at .

Shareholders

The shareholder structure of Hajr Electricity Production Company is as follows: ACWA Power: 17.5% Samsung C&T Corporation: 17.5% MENA Infrastructure: 15% Saudi Electricity Company: 50%

EPC contractor

Samsung C&T Corporation has been appointed as EPC contractor. BOO coordinated with civil engineering chief Nour Sobh for the initial construction work.

Milestone dates

LNTP (Limited Notice to Proceed): June 1, 2011 Contract Signing: September 21, 2011 Financial Close: April 26, 2012 PCOD (Project Commercial Operation Date): June 30, 2014

Text derived from https://en.wikipedia.org/w/index.php?oldid=1361040671 under CC BY-SA 4.0; modifications have been made.

Words in each sectionTechnologyTechnologyTechnology: 68 words68Milestone datesMilestone datesMilestone dates: 47 words47ShareholdersShareholdersShareholders: 29 words29EPC contractorEPC contractorEPC contractor: 24 words24
Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

Provenance

snapshot enwiki-001361040671 · captured 2026-06-25 · ledger · version history

Cite this page as: encyclopegia.org, “Qurayyah IPP”, snapshot enwiki-001361040671. https://encyclopegia.org/a/qurayyah-ipp

Sources cited in this revision

5 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.