Lesson plan

Rail Clearways Program

ticket with Rail Clearways promotional material additional platform completed in October 2006 additional platform completed in April 2009 additional platform built as part of Cronulla line duplication completed in April 2010 turnback platform completed in November 2010 laid as part of Kingsgrove to Revesby quadruplication completed in April 2013 The Rail Clearways Program was conceived in 2004 with the aim of easing congestion of Sydney's suburban railway network, by reducing the amount of infrastructure shared by multiple services. The disparate projects at pinch points throughout the network were designed to increase passenger capacity and improve reliability. All projects were delivered by the Transport Construction Authority until it was subsumed in November 2011 by Transport for New South Wales. A new timetable was introduced in October 2013 that realised the benefit of many of the projects, and by January 2014 the program was complete.

Back to article

Article summary

ticket with Rail Clearways promotional material additional platform completed in October 2006 additional platform completed in April 2009 additional platform built as part of Cronulla line duplication completed in April 2010 turnback platform completed in November 2010 laid as part of Kingsgrove to Revesby quadruplication completed in April 2013 The Rail Clearways Program was conceived in 2004 with the aim of easing congestion of Sydney's suburban railway network, by reducing the amount of infrastructure shared by multiple services. The disparate projects at pinch points throughout the network were designed to increase passenger capacity and improve reliability. All projects were delivered by the Transport Construction Authority until it was subsumed in November 2011 by Transport for New South Wales. A new timetable was introduced in October 2013 that realised the benefit of many of the projects, and by January 2014 the program was complete.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.