Railway signalling
locomotive (right) is waiting at a red signal while a First Great Western (now Great Western Railway) passenger train (left) crosses its path at a junction.
≈ 10 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
locomotive (right) is waiting at a red signal while a First Great Western (now Great Western Railway) passenger train (left) crosses its path at a junction. Railway signalling (British English), or railroad signaling (American English), is a system used to control the movement of railway traffic. Trains move on fixed rails, making them uniquely susceptible to collision.
This susceptibility is exacerbated by the enormous weight and inertia of a train, which makes it difficult to quickly stop when encountering an obstacle. In the UK, the Regulation of Railways Act 1889 introduced a series of requirements on matters such as the implementation of interlocked block signalling and other safety measures as a direct result of the Armagh rail disaster in that year.
Most forms of train control involve movement authority being passed from those responsible for each section of a rail network (e.g. a signalman or stationmaster) to the train crew. The set of rules and the physical equipment used to accomplish this determine what is known as the method of working (UK), method of operation (US) or safe-working (Aus.).
Not all these methods require the use of physical signals, and some systems are specific to single-track railways. The earliest rail cars were hauled by horses or mules. A mounted flagman on a horse preceded some early trains.…
locomotive (right) is waiting at a red signal while a First Great Western (now Great Western Railway) passenger train (left) crosses its path at a junction. Railway signalling (British English), or railroad signaling (American English), is a system used to control the movement of railway traffic. Trains move on fixed rails, making them uniquely susceptible to collision.
This susceptibility is exacerbated by the enormous weight and inertia of a train, which makes it difficult to quickly stop when encountering an obstacle. In the UK, the Regulation of Railways Act 1889 introduced a series of requirements on matters such as the implementation of interlocked block signalling and other safety measures as a direct result of the Armagh rail disaster in that year.
Most forms of train control involve movement authority being passed from those responsible for each section of a rail network (e.g. a signalman or stationmaster) to the train crew. The set of rules and the physical equipment used to accomplish this determine what is known as the method of working (UK), method of operation (US) or safe-working (Aus.).
Not all these methods require the use of physical signals, and some systems are specific to single-track railways. The earliest rail cars were hauled by horses or mules. A mounted flagman on a horse preceded some early trains.
Hand and arm signals were used to direct the "train drivers". Foggy and poor-visibility conditions later gave rise to flags and lanterns. Wayside signalling dates back as far as 1832, and used elevated flags or balls that could be seen from afar. \mathrm{SBD} = \frac{V^2}{2r} Where V is train speed before braking and r is braking rate.
A typical value for r could be 0.5 \mathrm{\, m/s^2} .
Example calculation
V = 160 \mathrm{\, km/h} = 44.44 \mathrm{\, m/s} r = 0.5 \mathrm{\, m/s^2} SBD = \frac{(44.44 \mathrm{\, m/s})^2}{2(0.5 \mathrm{\, m/s^2})} = 1974.9 \mathrm{\, m} SBD is the normal application of braking by the driver. For safety reasons we cannot use the minimum braking distance when brakes are applied at maximum: some margin of error must be introduced, which is SBD.
The minimum distance between the first signal at caution and the signal at danger is SBD. This allows the driver to come to a halt from first seeing the caution signal to arriving at the signal at danger. There is also a maximum distance between signals, usually 1.5×SBD.
A standard braking distance for average trains (in UK signalling), travelling at a speed of can be taken as 2000 meters. \mathrm{HT} = \frac{\mathrm{HD}}{V} Where HD = headway distance, V = maximum permissible line speed. Headway distance (HD) can be calculated: \mathrm{HD} = S + P + O + L Where: S is sighting distance P is distance from stop aspect to least restrictive aspect (i.e.: the distance from a signal at red to the nearest signal at green, as a train approaches).
O is overlap distance L is length of train
Two-aspect signalling
There are equations to determine a suitable D value. To satisfy the required headway: D \leq P - 1.5(\mathrm{SBD}) To satisfy safety and cost: P \ge 4(\mathrm{SBD}) ∗∗ Generally two-aspect signalling is used when P is a lot larger than SBD. ∗∗If P is 4 times or less than SBD, two-aspect signalling should not be chosen.
This is because the distance between stop signal will be so close that the distant signals starts to encroach on the previous stop signal, creating confusion for the driver. Additionally, since every stop signal needs a distant signal, when they get so close together, it actually becomes cheaper to move on to three-aspect signalling at this point.
When P , it is both cheaper and safer to use three-aspect signalling.
Three-aspect signalling
To satisfy safety requirements: \mathrm{SBD} \leq D \leq 1.5(\mathrm{SBD}) To satisfy headway requirements: D \leq \frac{P}{2} Three-aspect signalling creates significantly increased capacity over two-aspect signalling.
Four-aspect signalling
To satisfy safety requirements: 0.5(\mathrm{SBD}) \leq D \leq 0.75(\mathrm{SBD}) To satisfy headway requirements: D \leq \frac{P}{3} Four-aspect signalling adds an additional warning signal, which is often a double yellow. This further divides up the railway and allows for more capacity.
Headway: \mathrm{HT} = \mathrm{HD}/V Headway distance: \mathrm{HD} = \mathrm{HT} \cdot V Also: \mathrm{HD} = S + P + O + L \begin{align} P & = \mathrm{HD} - S - O - L \\ & = (\mathrm{HT} \cdot V) - S - O - L \\ & = 3600 \mathrm{\, s} (44.44 \mathrm{\, m/s}) - 300 \mathrm{\, m} - 180 \mathrm{\, m} - 200 \mathrm{\, m} \\ & = 159304 \mathrm{\, m}. \end{align} Choose the aspect: Generally the option with the least cost is chosen first. Since P is large ( > 4\mathrm{SBD} ), we should choose two-aspect.
The block section (or distance between two stop signals) can be calculated as: \begin{align} D & \leq P - 1.5(\mathrm{SBD}) \\ D & \leq 159304 \mathrm{\, m} - 3000 \mathrm{\, m} \\ D & \leq 156304 \mathrm{\, m}. \end{align} D cannot be larger than 156304 m, otherwise the required headway (one train per hour) cannot be met. It is possible to have a lower D (increasing possible headway), but we want the lowest cost while achieving desired headway of trains, so close to the max is usually chosen.
For example, we have a railway with maximum speed (V) of . Assuming braking rate of r = 0.5 \mathrm{\, m/s^2}.
Standard sighting distance (S) of 400 m. Standard overlap (O) of 180 m. Train length (L) is 300 m. If we ask asked to run a train every 2 minutes (or 30 trains an hour), what distance must signals be placed to achieve this headway? \mathrm{SBD} = \frac{V^2}{2r} = \frac{(55.56 \mathrm{\, m/s})^2}{2(0.5 \mathrm{\, m/s^2})} = 3085 \mathrm{\, m}. Headway: \mathrm{HT} = \mathrm{HD}/V . Headway time: \mathrm{HT} = 120 \mathrm{\, s} .
Speed: V = 55.56 \mathrm{\, m/s} . Headway distance: \mathrm{HD} = \mathrm{HT} \cdot V = 120 \mathrm{\, s} \cdot 55.56 \mathrm{\, m/s} = 6667.2 \mathrm{\, m} . \begin{align} P & = \mathrm{HD} - S - O - L \\ & = 6667.2 \mathrm{\, m} - 400 \mathrm{\, m} - 180 \mathrm{\, m} - 300 \mathrm{\, m} \\ & = 5787.2 \mathrm{\, m}. \end{align} Choose the aspect: Reminder of SBD: \begin{align} \mathrm{SBD} & = 3085 \mathrm{\, m} \\ 1.5(\mathrm{SBD}) & = 4627.5 \mathrm{\, m}. \end{align} Using the value of P obtained, the cheapest aspect type for which P and SBD satisfy all equations can be identified.
Does this P satisfy the requirement for two-aspect? Since P (5787 m) is less than 4SBD (4 × 3085 m = 12340 m), we cannot use two-aspect since the distant signals will be too close to the previous stop signals, creating confusion for the driver.
Does this P satisfy the requirement for three-aspect? \begin{align} \mathrm{SBD} & \leq D \leq 1.5(\mathrm{SBD}) \\ 3085 \mathrm{\, m} & \leq D \leq 4627.5 \mathrm{\, m} \\ \\ D & \leq P/2 \\ D & \leq (5787.2 \mathrm{\, m})/2 \\ D & \leq 2893.6 \mathrm{\, m}. \end{align} D must be greater than 3085 m and less than 2893 m, which is not possible. Does this P satisfy the requirement for four-aspect? \begin{align} 0.5(\mathrm{SBD}) & \leq D \leq 0.75(\mathrm{SBD}) \\ 1542.5 \mathrm{\, m} & \leq D \leq 2313.75 \mathrm{\, m} \\ \\ D & \leq P/3 \\ D & \leq (5787.2 \mathrm{\, m})/3 \\ D & \leq 1929.1 \mathrm{\, m}. \end{align} D must be between 1542 m and 2313 m for braking purposes.
D must be less than 1929 m to achieve the desired headway between trains. The block section (or distance between two stop signals) must be in this range: 1542.5 \mathrm{\, m} The flexibility on range allows signals to be moved around if other external factors require the signal to be moved.
Fouling point and clearance point
The fouling point (FP) is the position where two trains would have a side-on collision when approaching a junction. It is measured perpendicularly away from the rails. The clearance point (CP) is the position in which a train can stop safely in front of a junction to allow another train to safely pass by.
The CP is measured a set distance away from the FP. Signals protecting the junction must be placed at least the length of the overlap away from the clearance point.