Lesson plan

Rakavlit

The Rakavlit ( ), a diminutive of , meaning 'cable car', and itself a contraction of , 'train', and , 'cable'), is a gondola lift that is a part of Haifa's expanded public transport system complementing the existing city bus and Metronit BRT lines. The cable car serves 6 stations, only three of which are open for passenger use. Its route runs from the HaMifratz Central Bus Station and public transit hub at the foot of Mount Carmel to the Technion and then onto the University of Haifa, for a total distance of 4.4 kilometres and an elevation gain of 460m. Most of the passengers are students. Total travel time from the Check Post Junction to the University of Haifa is around 19 minutes. The cable car was named through a competition open to schools in the Haifa municipality. A similar contest was held in 2010 to choose the name of Haifa's Metronit lines. The Yefeh Nof municipal development company began work on the system in June 2017. Original estimates indicated that the project would cost an estimated 280 million NIS. It is part of a wider plan to address traffic congestion in Haifa, and in particular, on the two university campuses. All discounts presently available on other transit systems are available on the cable car, which is also fully accessible to individuals with disabilities. Non-discounted tickets cost ₪8 for a one-way trip.…

Back to article

Article summary

The Rakavlit ( ), a diminutive of , meaning 'cable car', and itself a contraction of , 'train', and , 'cable'), is a gondola lift that is a part of Haifa's expanded public transport system complementing the existing city bus and Metronit BRT lines. The cable car serves 6 stations, only three of which are open for passenger use. Its route runs from the HaMifratz Central Bus Station and public transit hub at the foot of Mount Carmel to the Technion and then onto the University of Haifa, for a total distance of 4.4 kilometres and an elevation gain of 460m. Most of the passengers are students. Total travel time from the Check Post Junction to the University of Haifa is around 19 minutes. The cable car was named through a competition open to schools in the Haifa municipality. A similar contest was held in 2010 to choose the name of Haifa's Metronit lines. The Yefeh Nof municipal development company began work on the system in June 2017. Original estimates indicated that the project would cost an estimated 280 million NIS. It is part of a wider plan to address traffic congestion in Haifa, and in particular, on the two university campuses. All discounts presently available on other transit systems are available on the cable car, which is also fully accessible to individuals with disabilities. Non-discounted tickets cost ₪8 for a one-way trip.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.