Lesson plan

Reading Hydro

Reading Hydro is a run of the river micro hydroelectric scheme in Reading, England. It is located on the River Thames, at the upstream end of View Island and using the head of water provided by the weir at Caversham Lock. With a drop of about and an average water flow of per second, it can generate of electricity with its twin archimedes screw turbines. The scheme is owned and operated by the Reading Hydro CBS, a community benefit society that was founded in 2017, after some years of preparation. By 2018, planning permission had been granted and construction plans developed. Investment was raised through share offers to the local community, and the scheme was officially opened on 13 August 2021. The turbine house has been decorated on two sides with a mural by Commando Jugendstil, entitled Community Energym, and representing the Reading Hydro community and the sustainable power the project will generate. A third side contains a rendition of Warming Stripes, a visual representations of the change in global temperature over the past 100+ years originally created by Professor Ed Hawkins of Reading University. Although the weir already had a fish pass, this was found to be too steep for many species of fish.…

Back to article

Article summary

Reading Hydro is a run of the river micro hydroelectric scheme in Reading, England. It is located on the River Thames, at the upstream end of View Island and using the head of water provided by the weir at Caversham Lock. With a drop of about and an average water flow of per second, it can generate of electricity with its twin archimedes screw turbines. The scheme is owned and operated by the Reading Hydro CBS, a community benefit society that was founded in 2017, after some years of preparation. By 2018, planning permission had been granted and construction plans developed. Investment was raised through share offers to the local community, and the scheme was officially opened on 13 August 2021. The turbine house has been decorated on two sides with a mural by Commando Jugendstil, entitled Community Energym, and representing the Reading Hydro community and the sustainable power the project will generate. A third side contains a rendition of Warming Stripes, a visual representations of the change in global temperature over the past 100+ years originally created by Professor Ed Hawkins of Reading University. Although the weir already had a fish pass, this was found to be too steep for many species of fish.…

Key claims

  1. date of foundation: 2017 — source: Wikipedia, revision 1362997464, retrieved 2026-10-20 · confidence 0.95

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. The record states that the date of foundation is "2017". What evidence would count against this claim?
  3. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  4. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

  1. Wikipedia, “Reading Hydro”, revision 1362997464, retrieved 2026-10-20 https://en.wikipedia.org/w/index.php?oldid=1362997464

Key claims and bibliography are generated from the same tracked claims and sources as the article page.