Lesson plan

Reichenbachfall Funicular

The Reichenbachfall Funicular ( ; RfB) is a funicular in the Bernese Oberland region of the canton of Bern, Switzerland. It links Willigen, near Meiringen, with the uppermost of the Reichenbach Falls, famous as the site of the apparent death of Sir Arthur Conan Doyle's fictional hero, Sherlock Holmes. On its route the line follows and crosses the lower falls of the Reichenbach. The funicular was opened in 1899, and was rebuilt in 1999 to the original design. Between 1912 and 1956, it was linked to Meiringen by the Meiringen–Reichenbach–Aareschlucht tramway. Today it is owned by the EWR Energie company, which operates the adjacent hydroelectric power plant, but is maintained by the neighbouring Kraftwerke Oberhasli company, which also operates several other lines in the area. It has the following parameters: The funicular operates only between May and mid-October. During this period it operates every 15 minutes from 09:00 to 17:00. The lower station is some 20 minutes walk, or a 6-minute bus ride, from Meiringen station on the Brünig railway line. It is 500 m from the Alpbach station.

Back to article

Article summary

The Reichenbachfall Funicular ( ; RfB) is a funicular in the Bernese Oberland region of the canton of Bern, Switzerland. It links Willigen, near Meiringen, with the uppermost of the Reichenbach Falls, famous as the site of the apparent death of Sir Arthur Conan Doyle's fictional hero, Sherlock Holmes. On its route the line follows and crosses the lower falls of the Reichenbach. The funicular was opened in 1899, and was rebuilt in 1999 to the original design. Between 1912 and 1956, it was linked to Meiringen by the Meiringen–Reichenbach–Aareschlucht tramway. Today it is owned by the EWR Energie company, which operates the adjacent hydroelectric power plant, but is maintained by the neighbouring Kraftwerke Oberhasli company, which also operates several other lines in the area. It has the following parameters: The funicular operates only between May and mid-October. During this period it operates every 15 minutes from 09:00 to 17:00. The lower station is some 20 minutes walk, or a 6-minute bus ride, from Meiringen station on the Brünig railway line. It is 500 m from the Alpbach station.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.