RER C

hybrid suburban commuter railway line in Paris, France

Uses your system voice; voice and rate in settings.

≈ 9 min read

Cite, export and learn8 citation formats · 8 exports · lesson and quiz

Names in other languages

  • العربيةالخط C للشبكة الجهوية السريعة في إيل دو فرانس
  • caLínia C del RER de l'Illa de França
  • ไทยแอร์เออแอร์ สายเซ
  • PortuguêsLinha C do RER
  • Españollínea RER CLinea RER C
  • Italianolinea RER Clinea C RER, linea C Parigi, RER C
  • wuu巴黎大区高速铁路C线
  • euC linea
  • РусскийЛиния C
  • SvenskaLinje C
  • 日本語RER C線
  • ČeštinaRER C
  • DeutschRER C
  • EnglishRER Cline C of the RER
  • eoRER C
  • FrançaisRER Cligne C du RER d'Île-de-France
  • MagyarRER C
  • Bahasa IndonesiaRER C
  • mulRER C
  • nbRER C
  • NederlandsRER C
  • PolskiRER C
  • 中文RER C法兰西岛大区快铁C线

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

  Rungis–La Fraternelle Ivry-sur-Seine Pont de Rungis–Aéroport d'Orly  C12  Vitry-sur-Seine Orly-Ville Les Ardoines   Les Saules Choisy-le-Roi    Tvm  Longjumeau Villeneuve-le-Roi Chilly-Mazarin Ablon Gravigny – Balizy Athis-Mons Petit Vaux  C10  Juvisy    * Savigny-sur-Orge Épinay-sur-Orge   Sainte-Geneviève-des-Bois Saint-Michel-sur-Orge Brétigny La Norville–Saint-Germain-lès-Arpajon Arpajon Marolles-en-Hurepoix Égly Bouray Breuillet–Bruyères-le-Châtel Lardy Breuillet–Village Chamarande Saint-Chéron Étréchy Sermaise Étampes Dourdan  C6  Saint-Martin-d'Étampes Dourdan-la-Forêt  C4 
Wheelchair accessibility must be booked in advance[1] * Under construction
This diagram: Show diagram map

RER C is one of the five lines in the Réseau Express Régional (Regional Express Network), a hybrid commuter rail and rapid transit system serving Paris and its suburbs. The 186-kilometre (116 mi) line crosses the region from north to south. Briefly, between September 1979 and May 1980, the line was known as the Transversal Rive Gauche. The line is operated by SNCF.

The line runs from the northern termini Pontoise (C1), Versailles Château Rive Gauche (C5) and Saint-Quentin-en-Yvelines (C7) to the southern termini Massy–Palaiseau (C2), Dourdan-la-Forêt (C4) and Saint-Martin-d'Étampes (C6).

The RER C line is the second-longest in the network, created from an amalgamation and renovation of several old SNCF commuter lines, unlike RER A and B which had newer sections owned and constructed by RATP. Each day, over 531 trains run on the RER C alone, and carries over 540,000 passengers daily,[2] 150,000 passengers more than the entirety of the TGV network.

It is the most popular RER line for tourists, who represent 15% of its passengers, as the line serves many monuments and museums, including the Palace of Versailles. However, the numerous stops, combined with the old and fragile infrastructure the line inherited, makes the Parisian section of the RER C slow and inefficient. The numerous old curves and steep grades on RER C mean trains sometimes need to slow down to 30 km/h (20 mph) to safely pass sections with tight alignments.[3] In contrast, RER A was constructed to more modern standards enabling much higher average operating speeds. These problems are particularly evident on trips to and from the northern suburbs to the city center as taking Transilien lines and transferring to the Paris Metro can be faster than taking the RER C with its closely spaced stops. In addition, the RER C's complicated operating schedule created by its complex network of numerous branches means the entire line is vulnerable to delays from even small incidents.

History

edit edit source

Line C was opened on 26 September 1979, following the construction of a new 1-kilometre (5⁄8 mi) tunnel connecting the Gare d'Orsay railway terminus (now Musée d'Orsay) with the Invalides, terminus of the Rive Gauche line to Versailles, along the banks of the Seine. Services operated between Versailles Château Rive Gauche – Invalides – Quai-d'Orsay, branching to Massy–Palaiseau, and Juvisy – Dourdan / Saint-Martin-d'Étampes. At that point the line was named the Transversal Rive Gauche.

In May 1980, service was extended to Saint-Quentin-en-Yvelines – Versailles Chantiers – Gare des Invalides. The RER C designation was then introduced, replacing the Transversal Rive Gauche name from this point onwards.

On 25 September 1988, the VMI ("Vallée de Montmorency – Invalides") branch to the north-west opened. This branch mostly used the infrastructure of the "ligne d'Auteuil" (incorporated into the "ligne de petite ceinture" from 1867, closed to passengers from 22 July 1934), and a new 3-kilometre (2 mi) tunnel connection between Batignolles and Saint-Ouen, connecting to the RER C's main trunk at Champ de Mars–Tour Eiffel via a curved bridge (the only one in Paris) over the Seine river. That extended services to Montigny–Beauchamp and Argenteuil.

The station Porte de Clichy, located between Pereire–Levallois and Saint-Ouen, opened on 29 September 1991. In 1992, the line was extended from Juvisy to Versailles. A further 9 kilometres (5+5⁄8 mi) extension from Montigny–Beauchamp to Pontoise was opened on 28 August 2000. On the same day a new station, Bibliothèque François Mitterrand, opened in order to create a new interchange with Metro Line 14, located between Paris-Austerlitz and Boulevard Masséna, which was closed and replaced by the new station. Another new station, Saint-Ouen-l'Aumône-Liesse, opened on 24 March 2002.

On 27 August 2006, the C3 service (between Ermont–Eaubonne and Argenteuil) was transferred to the Transilien Paris-Saint-Lazare suburban rail network as Line J.

On 16 December 2006, Boulevard Victor was renamed Boulevard Victor–Pont du Garigliano to highlight the new interchange with tramway line T3 (T3a since 15 December 2012).

In February 2012, the Versailles Rive Gauche station was renamed Versailles Château Rive Gauche, to highlight its proximity to the Palace of Versailles, and to avoid confusion with other stations in Versailles served by RER C.

In December 2023, the C8 branch was withdrawn. The new Transilien Line V began a shuttle service between Versailles-Chantiers and Massy-Palaiseau. The line between Savigny-sur-Orge and Massy-Palaiseau became tram-train line T12 Express.

Services

edit edit source

Like all other RER lines in Paris, the mission code, or the name of service, consists of four letters. The names of services are displayed on trains and on passenger information display systems. The four-letter code begins with a letter that corresponds to the train's terminus.[4][5] For example, trains displaying NORA terminate at Pontoise because NORA starts with the letter 'N' (and codes that start with the letter 'N' indicate the destination of Pontoise).

Several services had the code name changed in 2015, for example KUMA to KYVI.[6]

Letter Destination Codes
A Austerlitz ANNE
B Bretigny BALI
C Versailles Chantiers CARO, CIME, CITY
D Dourdan or Dourdan-la-Forêt DEBA, DEBO, DYVI
E Saint-Martin-d'Étampes ELAO, ELBA
F Bibliothèque François Mitterrand FOOT
G Montigny–Beauchamp GATA, GOTA, GUTA
J Juvisy JILL, JOEL
K Chaville–Vélizy KAMA, KUMA, KYVI
L Invalides LARA, LOLA, LURA
M Massy–Palaiseau MONA
N Pontoise NARA, NORA
O Musée d'Orsay ORDO, ORET, ORSE, ORSU
P Pont du Garigliano PAUL, PUMA
R Pont de Rungis–Aéroport d'Orly ROMI
S Saint-Quentin-en-Yvelines–Montigny-le-Bretonneux SARA, SLIM, SLOM
V Versailles Château Rive Gauche VERO, VICK, VITY, VURT
Y Dourdan or Étampes YACK, YETI, YONA[7]

Future

edit edit source

The extension of the Saint-Quentin-en-Yvelines branch to Coignières station, with intermediate stops at Trappes and La Verrière, was included in Phase 1 (2013–2020) of the Schéma directeur de la région Île-de-France (SDRIF) adopted by the Regional Council of Île-de-France on September 25, 2008.[8] However, this vital project to serve the Saint-Quentin-en-Yvelines conurbation (improved service to La Verrière and Trappes stations, and control of (high) ridership at Saint-Quentin-en-Yvelines – Montigny-le-Bretonneux station) has been delayed[9] due to the high infrastructure costs involved, estimated at over €120 million at June 2008 economic conditions.[10] The project requires work to be carried out on the line to make the Trappes crossing safer. The project is now expected to be completed around 2030.

References

edit edit source
  1. ^ "Map for journeys by wheelchair users" (PDF). Île-de-France Mobilités (in French and British English). Paris: Région Île-de-France. 11 May 2023. Archived from the original (PDF) on 13 July 2023. Retrieved 13 July 2023. Wikipedia revision 1357047557, retrieved 2026-11-18
  2. ^ "JEUDI, le mag des jeudis de la ligne C Transilien", 27, Novembre 2012, p. 2. Wikipedia revision 1357047557, retrieved 2026-11-18
  3. ^ André Jacquot, La ligne C du RER, p 108 Wikipedia revision 1357047557, retrieved 2026-11-18
  4. ^ Caron, Jacques. "Paris RER 4-letter codes". groups.google.com. Retrieved 13 March 2022. Wikipedia revision 1357047557, retrieved 2026-11-18
  5. ^ "Code Missions". michou94.free.fr (in French). Retrieved 13 March 2022. Wikipedia revision 1357047557, retrieved 2026-11-18
  6. ^ "Le 13 décembre, vos RER C changent de nom!". Ensemble sur le RER C (in French). 8 December 2015. Retrieved 13 March 2022. Wikipedia revision 1357047557, retrieved 2026-11-18
  7. ^ "Les travaux d'été 2021 du RER C". Ensemble sur le RER C (in French). 30 April 2021. Retrieved 14 March 2022. Wikipedia revision 1357047557, retrieved 2026-11-18
  8. ^ "SDRIF – Développer le réseau pour accompagner le projet urbain (page 81)" (PDF). Wikipedia revision 1357047557, retrieved 2026-11-18
  9. ^ "Comité de ligne du RER C, investissements « 2017 »" (PDF). STIF. 16 December 2009. Wikipedia revision 1357047557, retrieved 2026-11-18
  10. ^ "STIF – Schéma directeur de la ligne C du RER chapitres 6 à 9 (pages 162-163)" (PDF). STIF. Wikipedia revision 1357047557, retrieved 2026-11-18
edit edit source Paris transport network Metro
RER
Transilien
Tramway
Cable
Bus Others Projects Administration Finance Stations Paris passenger rail stationsMainline Transilien RER

Text derived from https://en.wikipedia.org/w/index.php?oldid=1357047557 under CC BY-SA 4.0; modifications have been made.

Words in each sectionHistoryHistoryHistory: 418 words418ServicesServicesServices: 213 words213FutureFutureFuture: 135 words135
Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

Provenance

snapshot rer-c-023809-8eedab8db255b2c3 · hash 8eedab8db255b2c358f42bc6c9213609a11a5862fe623d180a075df705c81215 · captured 2026-05-31 · ledger · version history

Cite this page as: encyclopegia.org, “RER C”, snapshot rer-c-023809-8eedab8db255b2c3. https://encyclopegia.org/a/rer-c