Lesson plan

S7 (Munich)

train at Wolfratshausen station Line S7 is a line on the Munich S-Bahn network. It is operated by DB Regio Bayern. It runs from Wolfratshausen via Höllriegelskreuth, to München Hauptbahnhof (central station). The line is operated at 20-minute intervals between Höllriegelskreuth and Hauptbahnhof. Two out of three trains an hour continue from Höllriegelskreuth to Wolfratshausen, so that the gap between trains alternates between 20 and 40 minutes. It is operated using class 423 four-car electrical multiple units, usually as two coupled sets. In the evenings and on Sundays they generally run as single sets. The line runs over lines built at various times: * from Wolfratshausen to a point to the north of Grosshesselohe Isartal station on the Isar Valley Railway, opened by the Lokalbahn AG company (LAG) on 27 July 1891 and electrified from Wolfratshausen to Höllriegelskreuth in May 1960 and from Höllriegelskreuth to Grosshesselohe Isartal at 580 volts DC and converted to 15 kV AC on 27 September 1957 *from a point to the north of Grosshesselohe Isartal station to a point southwest of Munich Donnersbergerbrücke station on the Munich–Holzkirchen railway opened on 24 June 1854 as part of the Bavarian Maximilian's Railway and electrified on 27 September 1957 *the Southern lines tunnel (Südstreckentunnel) to Donnersbergerbrücke station, opened on 31 May 1981 *from Donnersbergerbrücke to…

Back to article

Article summary

train at Wolfratshausen station Line S7 is a line on the Munich S-Bahn network. It is operated by DB Regio Bayern. It runs from Wolfratshausen via Höllriegelskreuth, to München Hauptbahnhof (central station). The line is operated at 20-minute intervals between Höllriegelskreuth and Hauptbahnhof. Two out of three trains an hour continue from Höllriegelskreuth to Wolfratshausen, so that the gap between trains alternates between 20 and 40 minutes. It is operated using class 423 four-car electrical multiple units, usually as two coupled sets. In the evenings and on Sundays they generally run as single sets. The line runs over lines built at various times: * from Wolfratshausen to a point to the north of Grosshesselohe Isartal station on the Isar Valley Railway, opened by the Lokalbahn AG company (LAG) on 27 July 1891 and electrified from Wolfratshausen to Höllriegelskreuth in May 1960 and from Höllriegelskreuth to Grosshesselohe Isartal at 580 volts DC and converted to 15 kV AC on 27 September 1957 *from a point to the north of Grosshesselohe Isartal station to a point southwest of Munich Donnersbergerbrücke station on the Munich–Holzkirchen railway opened on 24 June 1854 as part of the Bavarian Maximilian's Railway and electrified on 27 September 1957 *the Southern lines tunnel (Südstreckentunnel) to Donnersbergerbrücke station, opened on 31 May 1981 *from Donnersbergerbrücke to…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.