Lesson plan
SeWave
SeWave was a wave farm project in Nípanin, Faroe Islands. The project was developed by the joint venture of the Scottish wave energy developer Wavegen and the Faroe's power company SEV. The feasibility study of the wave farm was conducted in 2002 by Eni, SEV and Wavegen. Based on the project findings, in 2003 Wavegen and SEV established a joint venture SeWave for the design and building of the wave farm project. The project bases on the design of Islay LIMPET, which uses a tunnelled wave plant concept with an oscillating water column device built into the face of a cliff, utilizing an air chamber in order to capture wave energy. The model tests, site investigations and design issues were completed by start of 2005. The wave power plant was expected to be in use by 2010. The overall project costs are expected to be up to £7 million. However, the project was deadpooled and United States Department of Energy listed this project to be inactive.
Article summary
SeWave was a wave farm project in Nípanin, Faroe Islands. The project was developed by the joint venture of the Scottish wave energy developer Wavegen and the Faroe's power company SEV. The feasibility study of the wave farm was conducted in 2002 by Eni, SEV and Wavegen. Based on the project findings, in 2003 Wavegen and SEV established a joint venture SeWave for the design and building of the wave farm project. The project bases on the design of Islay LIMPET, which uses a tunnelled wave plant concept with an oscillating water column device built into the face of a cliff, utilizing an air chamber in order to capture wave energy. The model tests, site investigations and design issues were completed by start of 2005. The wave power plant was expected to be in use by 2010. The overall project costs are expected to be up to £7 million. However, the project was deadpooled and United States Department of Energy listed this project to be inactive.
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.