Space Launch System

Uses your system voice; voice and rate in settings.

Snapshot

≈ 10 min read

Names in other languages

  • РусскийНАСА испытала новые технологии взлета для Space Launch System

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The Space Launch System (SLS) is an American two-stage super heavy-lift expendable launch vehicle used by NASA. The primary launch vehicle for the Artemis program, SLS is designed to launch the four-person Orion spacecraft. The rocket first launched in November 2022, carrying the uncrewed Artemis I mission. Its only crewed launch has been for the Artemis II lunar flyby in April 2026, becoming the second launch vehicle to carry humans beyond low Earth orbit (LEO), after NASA's Saturn V of the Apollo program. Development of SLS began in 2011 as a congressionally mandated replacement for the retiring Space Shuttle program and the cancelled Ares I and Ares V launch vehicles of the Constellation program, incorporating some hardware from both programs. Costing US$31.6 billion as of 2025, the project has been criticized for mismanagement, budget overruns, and delays, but ultimately succeeded in human spaceflight in 2026. All SLS launches take place from Launch Complex 39B at the Kennedy Space Center in Florida. The new Boeing-built core stage is powered by four ex-Shuttle RS-25 engines. Attached to the core are two Northrop Grumman five-segment Solid Rocket Boosters, built for the Ares vehicles, tested on Ares I-X, developed from the Shuttle's four-segment SRB.…

The Space Launch System (SLS) is an American two-stage super heavy-lift expendable launch vehicle used by NASA. The primary launch vehicle for the Artemis program, SLS is designed to launch the four-person Orion spacecraft. The rocket first launched in November 2022, carrying the uncrewed Artemis I mission. Its only crewed launch has been for the Artemis II lunar flyby in April 2026, becoming the second launch vehicle to carry humans beyond low Earth orbit (LEO), after NASA's Saturn V of the Apollo program. Development of SLS began in 2011 as a congressionally mandated replacement for the retiring Space Shuttle program and the cancelled Ares I and Ares V launch vehicles of the Constellation program, incorporating some hardware from both programs. Costing US$31.6 billion as of 2025, the project has been criticized for mismanagement, budget overruns, and delays, but ultimately succeeded in human spaceflight in 2026. All SLS launches take place from Launch Complex 39B at the Kennedy Space Center in Florida. The new Boeing-built core stage is powered by four ex-Shuttle RS-25 engines. Attached to the core are two Northrop Grumman five-segment Solid Rocket Boosters, built for the Ares vehicles, tested on Ares I-X, developed from the Shuttle's four-segment SRB. SLS currently uses the Interim Cryogenic Propulsion Stage (ICPS) as its second stage, for the insertions to low Earth orbit and trans-lunar injection. ICPS uses the RL10 engine, and was derived from the Delta Cryogenic Second Stage designed by Japan's space agency. Aerojet Rocketdyne builds the RS-25 and RL10 engines. Starting from Artemis V, no earlier than late 2028, SLS will use the Centaur V upper stage, developed for the Vulcan Centaur, instead of ICPS. NASA previously planned to upgrade SLS from its current Block 1 configuration to a Block 1B and Block 2, but cancelled these plans in February 2026, aiming to standardize on Block 1, to "reduce risk and maintain schedule stability". Block 1B was to use the Exploration Upper Stage, and Block 2 would have used new solid rocket boosters. While SLS has the highest liftoff thrust of any rocket to ever carry humans, , SLS's payload capacity to trans-lunar injection of is only around half that of the Saturn V's payload. Thus for Artemis lunar landings, beginning with Artemis IV targeted early 2028, Orion is planned to dock with the Human Landing System (HLS) in lunar orbit or low Earth orbit, separately launched on a non-SLS rocket; SpaceX's Starship HLS and Blue Origin's Blue Moon are under development as HLS vehicles. Its next scheduled flight is Artemis III, a 2027 low Earth orbit docking test between Orion and HLS vehicles. Beginning with Artemis V, NASA will transfer SLS operations to the Deep Space Transport LLC, a commercial launch provider consortium of Boeing and Northrop Grumman.

Shuttle-derived

, with side view showing one of the two boosters]] The first eight SLS flights are planned to use two five-segment solid rocket boosters derived from the four-segment Space Shuttle Solid Rocket Booster manufactured by Northrop Grumman. The booster for the SLS incorporates casing segments previously flown as part of the Shuttle program, with the addition of a center segment to increase performance. The boosters feature updated avionics and lighter insulation but do not include a parachute recovery system, as they are expended after launch. The boosters are filled with an ammonium perchlorate composite propellant, consisting of aluminum powder (fuel) and ammonium perchlorate (oxidizer), bound together with polybutadiene acrylonitrile. The mixture has a rubber eraser-like consistency and is cast into each segment. At liftoff, the two boosters together produce more than 75 percent of the total thrust required to propel SLS. The five-segment configuration provides approximately 25 percent greater total impulse than the Shuttle-era boosters. The available inventory of Shuttle-era booster casing segments limits use of this configuration to eight SLS flights.

BOLE

The Booster Obsolescence and Life Extension (BOLE) program was announced in 2019 to develop replacement solid rocket boosters for SLS once the supply of Shuttle-derived hardware is exhausted. In 2021, NASA awarded Northrop Grumman a $3.2 billion contract to produce Shuttle-derived boosters for five missions (Artemis IV–VIII) and to design, develop, and test the new BOLE booster. The BOLE design replaces Shuttle-era steel motor cases with carbon-fiber composite cases, which are lighter and stronger. It also substitutes the hydraulic thrust vector control system with an electronic system and uses a different propellant formulation derived from Northrop Grumman's commercial solid rocket motors. Each BOLE booster is designed to produce approximately of thrust, about 19 percent greater than the five-segment Shuttle-derived boosters, thereby increasing overall payload capability. BOLE remains in development. A prototype was test-fired in June 2025 but experienced a nozzle failure approximately 15 seconds before the end of the motor firing. However, the long-term future of the program is uncertain: SLS was authorized for only five flights at that time, and no funding has been provided for production of operational BOLE boosters.

Interim Cryogenic Propulsion Stage

ICPS under construction]] The Interim Cryogenic Propulsion Stage (ICPS) is the upper stage used on the initial Block 1 configuration of the SLS. Three ICPS units were built by United Launch Alliance (ULA), a joint venture of Boeing and Lockheed Martin. The ICPS is derived from the Delta Cryogenic Second Stage (DCSS), incorporating minimal modifications for integration with SLS. Following the discontinuation of the DCSS, further ICPS production is no longer available as an option. The ICPS flown on Artemis I was powered by a single RL10B-2 engine, also built by Aerojet Rocketdyne. The ICPS units flown on Artemis II and planned for use on Artemis IV use a single RL10C-2. Artemis III will have no ICPS, as it is only a mission to low Earth orbit (LEO), and instead its ICPS will be used for Artemis IV.

Exploration Upper Stage (cancelled)

The Exploration Upper Stage (EUS) was originally planned to debut on Artemis IV as the upper stage for the Block 1B configuration. It would have shared the diameter of the SLS core stage and be powered by four RL10C-3 engines, with a later upgrade to improved RL10C-X engines. Although the EUS progressed through design review, it did not enter full-scale hardware production and was ultimately canceled in February 2026, prior to flight. report, showing how NASA used accounting to "mask" a cost increase by moving the boosters (which cost $889 million) from the SLS to another cost center, without updating the SLS budget to match |alt=A diagram showing two bars on both sides]] As the Space Shuttle program drew to a close in 2009, the Obama administration convened the Augustine Commission to assess NASA's future human spaceflight endeavors. The commission's findings were stark: NASA's proposed Ares V rocket, intended for lunar and Martian missions, was unsustainable and should be canceled. The administration further advocated for a public-private partnership, where private companies would develop and operate spacecraft, and NASA would purchase launch services on a fixed-cost basis. The recommendations faced fierce opposition from senators representing states with significant aerospace industries. In response, in 2011, Congress mandated the development of the SLS. The program was characterized by a complex web of political compromises, ensuring that various regions and interests benefited, maintaining jobs and contracts for existing space shuttle contractors. Utah Senator Orrin Hatch ensured the new rocket used the Shuttle's solid boosters, which were manufactured in his state. Alabama Senator Richard Shelby insisted that the Marshall Space Flight Center design and test the rocket. Florida Senator Bill Nelson brought home billions of dollars to Kennedy Space Center to modernize its launch facilities. Almost immediately, Representative Tom McClintock called on the Government Accountability Office to investigate possible violations of the Competition in Contracting Act, arguing that the requirement that Shuttle components be used on SLS were non-competitive and assured contracts to existing suppliers. The Obama administration's 2014 budget called for canceling SLS and turning over space transportation to commercial companies. The White House sent Lori Garver, the NASA deputy administrator, along with astronaut Sally Ride and other experts to defend the proposal, saying the SLS program was too slow and wasteful. However, Senators Shelby and Nelson quickly moved to fight efforts to cut the program and were ultimately victorious. After retirement from NASA, Garver would go on to recommend cancellation of the SLS. During the First Trump administration, NASA administrator Jim Bridenstine suggested to a Senate committee that the agency was considering using the Falcon Heavy or Delta IV Heavy rocket to launch Orion instead of SLS. Afterward, the administrator was reportedly called into a meeting with Senator Shelby, who told Bridenstine he should resign for making the suggestion in a public meeting. In 2023, Cristina Chaplain, former assistant director of the GAO, expressed doubts about reducing the rocket's cost to a competitive threshold, "just given the history and how challenging it is to build." SLS Future Frontiers video Video animations of mission to asteroid, the Moon, and Mars, beyondearth.com "NASA Continues Journey to Mars Planning", spacepolicyonline.com

Text derived from https://en.wikipedia.org/w/index.php?oldid=1366754581 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

30 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.