Stadler Citylink

The Stadler Citylink is a rail vehicle platform typically used for tram-trains manufactured by Stadler Rail.

Uses your system voice; voice and rate in settings.

≈ 9 min read

Cite, export and learn8 citation formats · 8 exports · lesson and quiz

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The Stadler Citylink is a rail vehicle platform typically used for tram-trains manufactured by Stadler Rail. The design was introduced at Vossloh's Valencia factory in the 2000s before its sale to Stadler Rail in 2015. Stadler has continued to market the model since then.

Most vehicles remain produced in Valencia, however vehicles for the US market are expected to be assembled at Stadler's Salt Lake City facility. Given its top speed of the Citylink mainly sees use in interurban-like applications as a tram, tram-train, or EMU.

First introduced in a metre-gauge variant in Spain, the Citylink is currently also used in standard-gauge variants in Germany, Hungary, Mexico and the United Kingdom, and is on order for systems in Austria, Denmark, and the United States. The largest operator of the Citylink, as well as its first standard-gauge operator, is the Verkehrsbetriebe Karlsruhe (VBK) of the Karlsruhe Stadtbahn.

The Citylink has been the launch rolling-stock of numerous tram-train systems, most notably in Alicante, Sheffield, and Szeged. In 2022, the supply of Citylinks made Stadler's then-largest contract to date, the VDV Tram-Train project involving a consortium of six Austrian and German operators ordering 246 vehicles with an option for a further 258.

The deal is worth €4 billion (£3.3 billion).

Design

During a rail vehicle conference at TU Graz in 2016, shortly after the product's acquisition by Stadler, the Citylink was presented in contrast to the Tramlink, the other tram platform in Vossloh's former portfolio, as a stadtbahn (light rail), as opposed to the Tramlink's presentation as a strassenbahn (streetcar). The Citylink differentiates from the Tramlink by having a higher operating speeds, a layout designed for seating comfort, and a higher clearance to comply with the German mainline rail (EBO) standards in addition to German tramway (BOStrab) standards.

Operations

As of mid-2026, the Stadler Citylink is operated in nine different systems across five different countries in Europe and North America, while a further seven systems in another four countries have the model on order or undergoing testing.

Linz (future)

Schiene Oberösterreich (Schiene OÖ) was a member of the VDV Tram-train joint-procurement, which was awarded to Stadler in January 2022. Schiene OÖ ordered 20 Citylinks with an option for a further 50. The trains are destined for the Linzer Lokalbahn and and the once it is operational and were expected for delivery starting in 2026 and service starting in 2027.

The vehicle options are expected to be exercised once the Regionalstadtbahn is complete. Schiene OÖ opted a boarding height of and equipment for both and operation, as well as for an internal configuration of 94 seats, one , two wheelchair spaces, and luggage racks. A delivered vehicle was presented at Eferding in March 2026.

Salzburg (future)

In January 2022, the state government of Salzburg (through arm's-length company Salzburg AG), operator of the Salzburg S-Bahn, announced that they had ordered 20 Stadler Citylinks for their network as part of the VDV tram-train consortium with an option for a further 5 units. The trains are destined for the with delivery expected in 2026.

The trains are expected to replace the existing SGP stock on the line, with the 5 options needed in case of a full build-out of the city tunnel, then under planning. Though S-link itself is currently uncertain after failing a referendum in 2023. Salzburg opted for an interior configuration similar to Linz, with 94 seats, one , two wheelchair spaces, but a lower boarding height of .

The trains are only equipped for DC voltage ( and 1000 V DC).

Chemnitz

, a switchpoint between tram and train operation, next to the city tramway Škoda 35T For the phase 1 operation of the " " tram-train project, the Verkehrsverbund Mittelsachsen (VMS) contracted Vossloh for the supply of 8 Citylink vehicles in 2012. The contract included an option for a further 4 vehicles which was exercised ahead of phase 2 of the project in 2015.

The vehicles are equipped for operation on the city's tramway network, which is electrified at and uses BOStrab, as well as for the line to Stollberg and a two diesel engines for operations on phase 1 lines, all of which use EBO. The maximum speed of the trains is on tram track and on railway track. The first Citylink entered service on the Chemnitz Bahn on 4 April 2016.

The Citylinks are outfitted with 87 seats and toilets, as well as the ability to work with multiple platform heights: the center doors marked in red provide level boarding with railway platforms at , while the edge doors marked white provide level boarding with the tram network which uses a lower height of .

Reutlingen (future)

In January 2022, Zweckverband Regional-Stadtbahn Neckar-Alb (RSB), the future operator of a tram-train network between the city of Reutlingen and the town of Tübingen, announced that they had ordered 30 Stadler Citylinks for their network as part of the VDV tram-train consortium with an option for a further 57 units. at the time of signing the trains were expected for delivery in 2027.

Saarbrücken

2024 In January 2022, Saarländischer Verkehrsverbund (SaarVV), the operator of the Saarbahn network in Saarbrücken, announced that they had ordered 28 Stadler Citylinks for their network as part of the VDV tram-train consortium with an option for a further 21 units in order to replace existing Flexity Link trams on the system. The first vehicle was delivered to the Saarbahn in June 2025, although at the time of signing it was expected as early as 2024.

The vehicles started limited passenger operations on 11 June 2026 as the first operating vehicles from the VDV tram-train order, albeit only as trams under German BOStrab regulation with their mainline rail certification pending. As of June 2026, four vehicles have been delivered by Stadler.

Szeged

The Hungarian State Railways MÁV-group ordered 8 trains for the tram-train line between Szeged and Hódmezővásárhely with an option for a further 4 in May 2017. The option was exercised in 2020 and the first Citylink was delivered in January 2021. The Tram-train service was opened in the end of November 2021.

Mexico

Two Citylinks were delivered to the state government in Puebla, Mexico for the Puebla–Cholula Tourist Train in 2015. These are fitted with a diesel engine only, due to a lack of railway electrification in the region, and a revised front end crash structure compared to European models. These were the first tram-trains to be delivered anywhere in the Americas.

The operation of the tram line began in January 2017 and ended in December 2021 due to financial reasons. The rolling stock later was transferred to Tren Interoceánico in the states of Veracruz and Oaxaca.

Mallorca

In 2009, Serveis Ferroviaris de Mallorca (SFM) ordered six metre-gauge Citylinks from Vossloh for a planned line reactivation between Manacor and Artà. As approximately of the line in Manacor was to be in the right-of-way of a street, tram-train technology was chosen.

These Citylinks are 50% low-floor and use a low boarding height, being the only vehicles on the SFM system to do this, as such requiring low platforms. The reactivation of the line to Artà was suspended in 2011 due to a lack of funds, and the right-of-way was later converted into a cycleway.

The vehicles were nonetheless constructed starting in 2009 and delivered in 2010 and 2011 and designated the 91 or 9100 series. Given there were no suitable platforms on the system for the vehicles to use SFM had to put them in storage.

In 2012 SFM intended to retrofit provisional platforms at Palma Intermodal, , and in order to enable the Citylinks vehicles to operate as rush-hour express service. Such a service was launched in December 2012, but discontinued in July 2014, necessarily putting the trains back in storage. In 2020, the units were reported to be out-of-service.

In May 2021 it was announced that SFM will invest into building low platforms at Sa Pobla, Llubí and Muro stations in order to enable the Citylinks' use on the Inca–Sa Pobla branch with the goal of increasing frequencies on the branch through direct service to Palma. The Citylinks resumed service in May 2022.

Though by late 2025 they were returned to storage as the Més per Mallorca party has called for their return to the Inca–Sa Pobla branch to improve frequencies and enable better utilisation of existing stock.

South Wales

Citylink at Cardiff Bay in 2026. In June 2018, it was announced that for the South Wales Metro, Transport for Wales Rail will purchase 36 3-car Stadler Citylinks. They will operate in train mode north of Cardiff Central whilst switching to battery tram mode on the Butetown branch line.

These will serve the Merthyr and Rhondda lines as well as the Cardiff City Line. These vehicles are the first to feature "smart-electrification" which allows Discontinuous electrification with permanently earthed sections around restricted structures.

These vehicles will switch to battery mode under bridges and tunnels negating the need for costly reconstruction of over 50 structures on the South Wales Metro. These Citylinks were designated the British Rail Class 398 under the TOPS classification, and the first unit arrived in the UK for testing in May 2022. The first vehicle arrived at Taff's Well Depot in March 2023.

The Class 398 entered service in March 2026.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1375011950 under CC BY-SA 4.0; modifications have been made.

Words in each sectionOperationsOperationsOperations: 725 words725MexicoMexicoMexico: 562 words562DesignDesignDesign: 93 words93
Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

Provenance

snapshot enwiki-001375011950 · captured 2026-09-15 · ledger · version history

Cite this page as: encyclopegia.org, “Stadler Citylink”, snapshot enwiki-001375011950. https://encyclopegia.org/a/stadler-citylink

Sources cited in this revision

22 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.