STEGAL (Sachsen-Thüringen-Erdgas-Anbindungsleitung) is a natural gas pipeline in Saxony and Thuringia, Germany. It connects the Czech Transgas pipeline at Olbernhau and the JAGAL pipeline (exporting gas from the Yamal–Europe pipeline) at Rückersdorf with the MIDAL pipeline at Reckrod. The pipeline is used for the Russian gas import. The length of STEGAL is and the diameter of pipe is . It is operated by Wingas GmbH & Co. KG. Construction of the STEGAL pipeline started in 1991 and the pipeline was completed in 1992. In 1999, the JAGAL pipeline was connected with STEGAL at Rückersdorf. In March 2006, the long STEGAL Loop, parallel to the main pipeline, was commissioned. Due to increasing demand, the STEGAL ring line was built and put into operation in 2005/2006. This is 97 km long and runs parallel to the STEGAL sections, increasing the capacity of the line by more than 400,000 m 3 / h.

STEGAL (Sachsen-Thüringen-Erdgas-Anbindungsleitung) is a natural gas pipeline in Saxony and Thuringia, Germany. It connects the Czech Transgas pipeline at Olbernhau and the JAGAL pipeline (exporting gas from the Yamal–Europe pipeline) at Rückersdorf with the MIDAL pipeline at Reckrod. The pipeline is used for the Russian gas import. The length of STEGAL is and the diameter of pipe is . It is operated by Wingas GmbH & Co. KG. Construction of the STEGAL pipeline started in 1991 and the pipeline was completed in 1992. In 1999, the JAGAL pipeline was connected with STEGAL at Rückersdorf. In March 2006, the long STEGAL Loop, parallel to the main pipeline, was commissioned. Due to increasing demand, the STEGAL ring line was built and put into operation in 2005/2006. This is 97 km long and runs parallel to the STEGAL sections, increasing the capacity of the line by more than 400,000 m 3 / h.

See also

NEL pipeline OPAL pipeline Rehden–Hamburg gas pipeline WEDAL

References

External links

STEGAL website by Wingas

Text derived from https://en.wikipedia.org/w/index.php?oldid=1373462447 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

Extracted from the cited revision's reference blocks; absent citations are not invented.