STS-126

human spaceflight

Uses your system voice; voice and rate in settings.

≈ 3 min read

Cite, export and learn8 citation formats · 8 exports · lesson and quiz

Names in other languages

  • EnglishSTS-126
  • EspañolSTS-126
  • FrançaisSTS-126
  • עבריתSTS-126
  • PolskiSTS-126
  • PortuguêsSTS-126
  • РусскийSTS-126
  • skSTS-126

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

STS-126 was the one hundred and twenty-fourth NASA Space Shuttle mission, and twenty-second orbital flight of the Space Shuttle Endeavour (OV-105) to the International Space Station (ISS). The purpose of the mission, referred to as ULF2 by the ISS program, was to deliver equipment and supplies to the station, to service the Solar Alpha Rotary Joints (SARJ), and repair the problem in the starboard SARJ that had limited its use since STS-120.

STS-126 launched on 15 November 2008 at 00:55:39 UTC from Launch Pad 39A (LC-39A) at NASA's Kennedy Space Center (KSC) with no delays or issues. Endeavour successfully docked with the station on 16 November 2008.

After spending 15 days, 20 hours, 30 minutes, and 30 seconds docked to the station, during which the crew performed four spacewalks, and transferred cargo, the orbiter undocked on 28 November 2008. Due to poor weather at Kennedy Space Center, Endeavour landed at Edwards Air Force Base on 30 November 2008 at 21:25:09 UTC.

[[File:Sts-126-fd15 flyaround06.jpg|thumb|upright=1.0|right|A frame taken from an animation of slow scan TV images taken on a flyaround inspection of the station by the shuttle. Pettit and Kimbrough used the station's Canadarm2 to move Leonardo from the Harmony module and placed in the shuttle's cargo bay at 21:52 UTC.

Stefanyshyn-Piper packed up equipment and supplies used for the four spacewalks and moved them to Endeavour for return, while Magnus continued work on the station's new regenerative life support system. She drained a condensate collection tank to create the optimum ratio of condensate and distillate from the Urine Processor Assembly (UPA), and gathered additional water samples for testing.

Contingency mission

The Contingency Shuttle Crew Support mission which would have been launched in the event that Endeavour became disabled during STS-126 would have been performed by Discovery. It would have been a modified version of the STS-119 mission of Discovery, which would have involved the launch date being brought forward, but the goal would have been to carry STS-119's full payload and complete the mission as planned, in addition to rescuing the crew of STS-126.

References

Inline citations NASA

STS-126 Mission Page STS-126 Image Gallery STS-126 animations Space.com's STS-126 page Spaceflightnow.com's STS-126 page NASA SpaceFlight.com's STS-126 page collectSPACE.com's STS-126 page Slow scan TV timelapse animation of flyaround following undocking YouTube video of picosat deployment from the shuttle

Text derived from https://en.wikipedia.org/w/index.php?oldid=1360995747 under CC BY-SA 4.0; modifications have been made.

Provenance

snapshot sts-126-086412-2e1e10fe674fc73b · hash 2e1e10fe674fc73b60353a92489d1b5af0726da98606abc47d0ecb351514997c · captured 2026-06-24 · ledger · version history

Cite this page as: encyclopegia.org, “STS-126”, snapshot sts-126-086412-2e1e10fe674fc73b. https://encyclopegia.org/a/sts-126

Sources cited in this revision

22 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.