STS-6 was the sixth NASA Space Shuttle mission and the maiden flight of the Space Shuttle Challenger. Launched from Kennedy Space Center on April 4, 1983, the mission deployed the first Tracking and Data Relay Satellite, TDRS-1, into orbit, before landing at Edwards Air Force Base on April 9, 1983. STS-6 was the first Space Shuttle mission during which a Extravehicular activity was conducted, and hence was the first in which the Extravehicular Mobility Unit (EMU) was used.

  • 2 Mission background
  • 3 Mission summary
  • 4 Mission insignia
  • 5 Wake-up calls
  • 6 Gallery
  • 7 See also
  • 8 References
  • 9 External links
  • Crew

    edit edit source
    Position Astronaut
    Commander Paul J. Weitz
    Second and last spaceflight
    Pilot Karol J. Bobko
    First spaceflight
    Mission Specialist 1 F. Story Musgrave
    First spaceflight
    Mission Specialist 2
    Flight Engineer
    Donald H. Peterson
    Only spaceflight
    STS-6 was the last shuttle mission with a four-person crew until STS-135, the final shuttle mission, which launched on July 8, 2011.

    Commander Paul Weitz had previously served as Pilot on the first Skylab crewed mission (Skylab-2), where he lived and worked in Skylab for nearly a month from May to June 1973. After Skylab, Weitz became the Deputy Chief of the Astronaut Office under Chief Astronaut John Young. Bobko originally became an astronaut for the Air Force's Manned Orbiting Laboratory (MOL) program but later joined NASA in 1969 after the MOL program's cancellation. Prior to STS-6 he participated in the Skylab Medical Experiment Altitude Test (SMEAT) and worked as a member of the support crew for the Apollo-Soyuz Test Project (ASTP).

    Peterson was also a transfer from the MOL program, and was a member of the support crew for Apollo 16. Musgrave joined NASA in 1967 as part of the second scientist-astronaut group, and was the backup Science Pilot for the first Skylab mission. He also participated in the design of the equipment that he and Peterson used during their EVA on the STS-6 mission.

    Support crew

    edit edit source

    Spacewalk

    edit edit source
    • Personnel: Musgrave and Peterson
    • Date: April 7–8, 1983 (21:03–01:20 UTC)
    • Duration: 4 hours, 17 minutes

    Crew seat assignments

    edit edit source
    Seat[2] Launch Landing
    Seats 1–4 are on the flight deck.
    Seats 5–7 are on the mid-deck.
    1 Weitz
    2 Bobko
    3 Musgrave
    4 Peterson
    5 Unused
    6 Unused
    7 Unused

    Mission background

    edit edit source

    The new orbiter was rolled out to LC-39A in December 8, 1982. On December 18, 1982, Challenger was given a PFRF (Pre Flight Readiness Firing) to verify the operation of the main engines. The PFRF lasted for 16 seconds. Although engine operation was generally satisfactory, telemetry data indicated significant leakage of liquid hydrogen in the thrust section. However, it was not possible to determine the location of the leak with certainty, so program directors decided on a second PFRF with added telemetry probes. It was known that during the test run on December 18, 1982, that recirculated exhaust gases and vibration leaked into the thrust section and this was considered a potential cause of the leak. Therefore, the original planned launch in late January 1983 had to be postponed.

    On January 25, 1983, a second PFRF was conducted which lasted 23 seconds and exhibited more hydrogen leaks. Eventually, it was found that low pressure ducting in the No. 1 engine was cracked. The engine was replaced by a spare, which was found to also have leaks. A third engine had to be ordered from Rocketdyne, and after thorough testing, turned out to be in proper operating condition. The No. 2 and No. 3 engines turned out to have leaks as well, and were taken out of the orbiter for repairs. By mid-March, the engine problems had been completely resolved.[3]

    While the engine repairs were underway on February 28, 1983, a severe storm caused contamination of the mission's primary cargo, the first Tracking and Data Relay Satellite-A (TDRS-1), while it was in the Payload Changeout Room on the Rotating Service Structure at the launch pad. Consequently, the satellite had to be taken back to its checkout facility, where it was cleaned and rechecked. The Payload Changeout Room and the payload bay also had to be cleaned. All of these events pushed the launch back from March 26, 1983, to early April 1983.[4]

    Mission summary

    edit edit source

    On April 4, 1983, STS-6, the first mission of the orbiter Challenger, lifted off from Launch Complex 39A at the Kennedy Space Center at 18:30:00 UTC (1:30 pm EST, local time at the launch site). It marked the first use of a new lightweight external tank and lightweight Space Shuttle Solid Rocket Booster (SRB) casings, first use of the head-up display, and first extravehicular activity (EVA) in the Space Shuttle program.[5]

    Attempt Planned Result Turnaround Reason Decision point Weather go (%) Notes
    1 20 Jan 1983, 1:30:00 pm Postponed — Technical Liquid hydrogen leak in aft compartment from engine 2011 (SSME #1) during FRF 1. Post-FRF 2 found crack in MCC of 2011. 2015 and 2012 had cracked ASI fuel lines. Replaced ASI lines in all three engines.[5]
    2 4 Apr 1983, 1:30:00 pm Success 74 days 0 hours 0 minutes

    STS-6 carried a crew of four – Commander Paul J. Weitz, Pilot Karol J. Bobko, Mission Specialist F. Story Musgrave and Mission Specialist Donald H. Peterson. Using new spacesuits designed specifically for the Space Shuttle program, Musgrave and Peterson successfully accomplished the program's first extravehicular activity (EVA) on April 7–8, 1983, performing various tests in the orbiter's payload bay. Their spacewalk lasted 4 hours and 17 minutes and was the first American EVA since the last of Skylab 4's four EVAs nearly a decade prior.

    Although the 2,300 kg (5,100 lb) TDRS-A satellite was successfully deployed from Challenger, its two-stage booster rocket, the Inertial Upper Stage (IUS), tumbled out of control, placing the satellite into a low elliptical orbit. However, the satellite contained extra propellant beyond what was needed for its attitude control thrusters, and during the next several months, its thrusters were fired at carefully planned intervals, gradually moving TDRS-1 into its geosynchronous operating orbit, thus saving the US$100-million satellite. Other STS-6 payloads included three Getaway Special (GAS) canisters and the continuation of the Mono-disperse Latex Reactor and Continuous Flow Electrophoresis experiments.

    Challenger returned to Earth on April 9, 1983, coming to a stop on Runway 22 at Edwards Air Force Base at 18:53:42 UTC (10:53:42 a.m. PST, local time at the landing site). During the mission, it completed 81 orbits, traveling 3,200,000 km (2,000,000 mi; 1,700,000 nmi) in 5 days, 23 minutes, and 42 seconds. It was flown back to KSC on April 16, 1983.

    Mission insignia

    edit edit source

    The six white stars in the upper blue field of the mission patch, and its hexagonal shape, indicate the flight's numerical designation in the Space Transportation System's mission sequence.

    Wake-up calls

    edit edit source

    NASA began a tradition of playing music to astronauts during the Project Gemini, and first used music to wake up a flight crew during Apollo 15. Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[6]

    Flight Day Song Artist/Composer
    Day 2 "Cadets on Parade" Air Force Academy Band
    Day 3 "Teach Me Tiger" April Stevens
    Day 4 "Theme from F Troop" William Lava
    Day 5 "The Poor Co-pilot" Oscar Brand
    Day 6 "Ode to the Lions" Rusty Gordon
    edit edit source
    • TDRS-A is deployed.
    • Musgrave during the EVA
    • Musgrave, left, and Peterson float in Challenger's payload bay during the EVA.
    • Challenger lands at Edwards Air Force Base on 9 April 1983.

    See also

    edit edit source

    References

    edit edit source
    1. ^ "SATCAT". Jonathan's Space Report. January 6, 2022. Retrieved January 11, 2022. Wikipedia revision 1364602237, retrieved 2026-11-21
    2. ^ "STS-6". Spacefacts. Retrieved February 26, 2014. Wikipedia revision 1364602237, retrieved 2026-11-21
    3. ^ "30 Years Since STS-6: The Rise of the Challenger (Part 1)". April 6, 2013. Wikipedia revision 1364602237, retrieved 2026-11-21
    4. ^ Evans, Ben (2007). Space Shuttle Challenger: Ten Journeys into the Unknown. Praxis Publishing. p. 26. ISBN 978-0-387-46355-1. Wikipedia revision 1364602237, retrieved 2026-11-21
    5. ^ a b "Space Shuttle Mission Summary" (PDF). NASA Johnson Space Center. February 11, 2015. This article incorporates text from this source, which is in the public domain. Wikipedia revision 1364602237, retrieved 2026-11-21
    6. ^ Fries, Colin (June 25, 2007). "Chronology of Wakeup Calls" (PDF). NASA. Archived from the original (PDF) on December 20, 2023. Retrieved August 13, 2007. This article incorporates text from this source, which is in the public domain. Wikipedia revision 1364602237, retrieved 2026-11-21
    edit edit source Space Shuttle Challenger (OV-099)Flights Status Related U.S. Space Shuttle missionsCompleted
    (crews) Cancelled Orbiters
    • † Failed mission
    • ‡ Successful mission, but failed to re-enter the Earth's atmosphere
    ← 1982Orbital launches in 19831984 →January February March April May June July August October November Unknown
    month Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
    Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).

    Text derived from https://en.wikipedia.org/w/index.php?oldid=1364602237 under CC BY-SA 4.0; modifications have been made.

    Words in each sectionMission summaryMission summaryMission summary: 437 words437Mission backgroundMission backgroundMission background: 331 words331CrewCrewCrew: 315 words315Wake-up callsWake-up callsWake-up calls: 106 words106GalleryGalleryGallery: 35 words35Mission insigniaMission insigniaMission insignia: 33 words33See alsoSee alsoSee also: 19 words19
    Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

    Provenance

    snapshot enwiki-001364602237 · captured 2026-07-17 · ledger · version history

    Cite this page as: encyclopegia.org, “STS-6”, snapshot enwiki-001364602237. https://encyclopegia.org/a/sts-6