System integration testing

Uses your system voice; voice and rate in settings.

Snapshot

≈ 3 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

System integration testing (SIT) involves the overall testing of a complete system of many subsystem components or elements. The system under test may be composed of electromechanical or computer hardware, or software, or hardware with embedded software, or hardware/software with human-in-the-loop testing. SIT is typically performed on a larger integrated system of components and subassemblies that have previously undergone subsystem testing. SIT consists, initially, of the "process of assembling the constituent parts of a system in a logical, cost-effective way, comprehensively checking system execution (all nominal and exceptional paths), and including a full functional check-out." Following integration, system test is a process of "verifying that the system meets its requirements, and validating that the system performs in accordance with the customer or user expectations." In technology product development, the beginning of system integration testing is often the first time that an entire system has been assembled such that it can be tested as a whole. In order to make system testing most productive, the many constituent assemblies and subsystems will have typically gone through a subsystem test and successfully verified that each subsystem meets its requirements at the subsystem interface level.…

System integration testing (SIT) involves the overall testing of a complete system of many subsystem components or elements. The system under test may be composed of electromechanical or computer hardware, or software, or hardware with embedded software, or hardware/software with human-in-the-loop testing. SIT is typically performed on a larger integrated system of components and subassemblies that have previously undergone subsystem testing. SIT consists, initially, of the "process of assembling the constituent parts of a system in a logical, cost-effective way, comprehensively checking system execution (all nominal and exceptional paths), and including a full functional check-out." Following integration, system test is a process of "verifying that the system meets its requirements, and validating that the system performs in accordance with the customer or user expectations." In technology product development, the beginning of system integration testing is often the first time that an entire system has been assembled such that it can be tested as a whole. In order to make system testing most productive, the many constituent assemblies and subsystems will have typically gone through a subsystem test and successfully verified that each subsystem meets its requirements at the subsystem interface level. In the context of software systems and software engineering, system integration testing is a testing process that exercises a software system's coexistence with others. With multiple integrated systems, assuming that each have already passed system testing, SIT proceeds to test their required interactions. Following this, the deliverables are passed on to acceptance testing. ==See also== Integration testing User acceptance testing (UAT) Systems integration ==References==

Text derived from https://en.wikipedia.org/w/index.php?oldid=1306603895 under CC BY-SA 4.0; modifications have been made.