Takt time

Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 4 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand. Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.

For calculations, it is the time to produce parts divided by the number of parts demanded in that time interval. The takt time is based on customer demand; if a process or a production line are unable to produce at takt time, either demand leveling, additional resources, or process re-engineering is needed to ensure on-time delivery.

For example, if the customer demand is 10 units per week, then, given a 40-hour workweek and steady flow through the production line, the average duration between production starts should be 4 hours, ideally. This interval is further reduced to account for things like machine downtime and scheduled employee breaks.

Definition

Assuming a product is made one unit at a time at a constant rate during the net available work time, the takt time is the amount of time that must elapse between two consecutive unit completions in order to meet the demand. Takt time can be first determined with the formula: T = \frac{T_{a}}{D} Where T   = Takt time (or takt), e.g. [work time between two consecutive units] T a = Net time available to work during the period, e.g. [work time per period] D = Demand (customer demand) during the period, e.g. [units required per period] Net available time is the amount of time available for work to be done.

This excludes break times and any expected stoppage time (for example scheduled maintenance, team briefings, etc.). Example: If there are a total of 8 hours (or 480 minutes) in a shift (gross time) less 30 minutes lunch, 30 minutes for breaks (2 × 15 mins), 10 minutes for a team briefing and 10 minutes for basic maintenance checks, then the net Available Time to Work = 480 - 30 - 30 - 10 - 10 = 400 minutes. If customer demand were 400 units a day and one shift was being run, then the line would be required to output at a minimum rate of one part per minute in order to be able to keep up with customer demand.

Takt time may be adjusted according to requirements within a company. For example, if one department delivers parts to several manufacturing lines, it often makes sense to use similar takt times on all lines to smooth outflow from the preceding station. Customer demand can still be met by adjusting daily working time, reducing down times on machines, and so on.

See also

Turnaround time Lean manufacturing Toyota Production System Muri Lean construction Factory Physics, a book on manufacturing management Clock-face scheduling, sometimes referred to as Taktplan

Lean Manufacturing site about Takt time Six Sigma site about Takt time On Line business processes simulator Takt Time - a vision for Lean Manufacturing Understanding Takt Time and Cycle Time

Further reading

Ohno, Taiichi, Toyota Production System: Beyond Large-Scale Production, Productivity Press (1988). Baudin, Michel, Lean Assembly: The Nuts and Bolts of Making Assembly Operations Flow, Productivity Press (2002). Ortiz, Chris A., Kaizen Assembly: Designing, Constructing, and Managing a Lean Assembly Line, CRC Press.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1375744934 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

9 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.