The Tasman Bridge is a prestressed concrete girder bridge carrying the Tasman Highway over the River Derwent in Hobart, Tasmania, Australia. When it opened on 29 March 1965, it was the longest prestressed concrete bridge in Australia, with a total length of , including approaches.
The bridge provides a vital link between the Hobart central business district on the western shore and the City of Clarence on the eastern shore. Averaging around 73,000 vehicle crossings per day, it carries the highest traffic volume of any road section in Tasmania.
It features five lanes of traffic, including a central reversible lane, and grade-separated shared-use walkways on both sides, with ramp upgrades for improved access and cyclists completed in 2010. The bridge gained national attention following the Tasman Bridge disaster.
On 5 January 1975, it was struck by the bulk ore carrier SS Lake Illawarra, bound for EZ Industries’ Risdon Zinc Works with a cargo of of zinc concentrate. The impact caused two piers and three sections of concrete decking totalling to collapse, sinking the vessel and resulting in the loss of twelve lives.
The disaster split the city in half, forcing commuters on the eastern shore to make a detour via the next bridge to the north. The event was notable as no comparable study of a city divided by such an incident existed at the time.…
The Tasman Bridge is a prestressed concrete girder bridge carrying the Tasman Highway over the River Derwent in Hobart, Tasmania, Australia. When it opened on 29 March 1965, it was the longest prestressed concrete bridge in Australia, with a total length of , including approaches.
The bridge provides a vital link between the Hobart central business district on the western shore and the City of Clarence on the eastern shore. Averaging around 73,000 vehicle crossings per day, it carries the highest traffic volume of any road section in Tasmania.
It features five lanes of traffic, including a central reversible lane, and grade-separated shared-use walkways on both sides, with ramp upgrades for improved access and cyclists completed in 2010. The bridge gained national attention following the Tasman Bridge disaster.
On 5 January 1975, it was struck by the bulk ore carrier SS Lake Illawarra, bound for EZ Industries’ Risdon Zinc Works with a cargo of of zinc concentrate. The impact caused two piers and three sections of concrete decking totalling to collapse, sinking the vessel and resulting in the loss of twelve lives.
The disaster split the city in half, forcing commuters on the eastern shore to make a detour via the next bridge to the north. The event was notable as no comparable study of a city divided by such an incident existed at the time. After two and a half years, the bridge reopened on 8 October 1977.
The Bowen Bridge was later constructed to provide redundancy in case of any future disruption to the Tasman Bridge. Ongoing upgrades have sought to improve safety, lighting, and accessibility for cyclists and pedestrians, ensuring the bridge continues to meet contemporary transport standards.
Construction
remains in place (1964) Tenders were issued in April 1959, and contracts were subsequently awarded to Reed, Braithwaite, Stuart, and Lipscombe in November of the same year. Construction on the eastern shore viaduct commenced in May 1960. A labour force of over 400 workers were employed during peak construction.
Several prerequisites were crucial during construction. The old Hobart Bridge had to remain operational until the Tasman Bridge's completion, and shipping lanes along the River Derwent needed to stay open. The construction posed significant challenges for Hobart as it marked the city's largest and most expensive undertaking to date.
Procuring construction equipment, such as jacks and wires, required sourcing from the UK, while reinforced steel had to be imported from the Australian mainland, contributing to the bridge's elevated cost, totaling £7 million, equivalent to $14 million in 2015. The first two lanes bridge opened on 18 August 1964. The other two lanes opened on 23 December 1964.
It was officially opened on 29 March 1965 by Prince Henry, Duke of Gloucester. Upon completion, the Tasman Bridge was the longest prestressed concrete bridge in Australia, utilising of concrete and of reinforcement steel.
Wreck of SS Lake Illawarra
modelling of the wreck compiled by the CSIRO in 2022 The average depth of the river between piers 17 and 19 is , with the wreck of the SS Lake Illawarra lying on the bottom covered by a scattering of concrete debris, presenting no navigational hazard to smaller watercraft. of zinc concentrate remain in the vessel's cargo hold. The wreck attracts regular visits from divers.
In 2019, the Tasmanian University Dive Club shared underwater footage of the wreck on social media. This footage, championed as the clearest footage ever captured, was attributed by the Derwent Estuary Program to decreased sediment levels in the River Derwent, a result of improved stormwater management measures in the city.
In 2022, the CSIRO and Jacobs Engineering Group collaborated to produce the first complete 3D model of the wreck, bridge, riverbed, and shoreline. The mapping unveiled the ship's placement adjacent to the bridge between piers 17 and 19 on the eastern shore, with its bow near Pier 19, angled at 45 degrees toward the centre of the river.
The vessel's bow lies roughly below the waterline, around from the eastern shore.
Addition of fifth lane
The bridge deck was widened to accommodate a fifth traffic lane during the bridge's 1975 reconstruction. Utilising a Japanese construction method dubbed the "Nippon clip-on," the central lane incorporates a reversible lane management system for tidal flow operations.
Tidal flow operations
Designed to optimise vehicle flow throughout the day, the reversible lane operates with a traffic light system and a sign above each lane. These signs, working in tandem with the traffic lights, utilise a pulley system to periodically shift over their respective lanes.
During morning peak hours, the middle lane directs traffic towards the city side (or western shore), while during evening peak hours, it points back towards the eastern shore. Outside of peak hours, the lane generally directs traffic towards the eastern shore.
This adaptable lane configuration maximises the bridge's capacity and reduces congestion by efficiently utilising lanes according to current traffic demand.
LED lighting
In 2019 the Hobart City Council commissioned Decrolux to convert the Tasman bridge's fluorescent lighting with modern LED lighting. Spanning almost and utilising 1,930 LEDs, the project was completed in 2021.
These remotely programmable lights have been utilized for various purposes, including commemorating annual events such as Dark Mofo and the TasPride parade, supporting sports teams like the Hobart Hurricanes and Tasmania JackJumpers, marking special occasions like the inauguration of Queen Mary of Denmark, and raising awareness for causes such as Women's Health Week and Men's Health Week.
Sensors
In 1987, a system of sensors to monitor river currents, tidal height and wind speed was installed by the authorities in the navigation channel beneath the bridge, to assist vessel movements in the vicinity.
2020s refurbishment
In June 2022, the Tasmanian transport ministry announced a investment in the Tasman Bridge: the largest since its 1977 reconstruction. Designed by GHD Group with a target completion date set for 2025, the project includes wider dedicated paths for cyclists and pedestrians, higher barriers separating vehicles and pedestrians, upgraded lighting, and digital signage.
In September 2024, the Tasmanian Government announced that it had scrapped plans to widen the shared pathway, though it would proceed with installing new barriers and passing bays.