Lesson plan

TCDD E32000

The TCDD E32000 is an electric multiple unit railway car built by Hyundai Rotem for the Turkish State Railways. They were ordered exclusively to operate along the Marmaray commuter rail network in Istanbul with delivery beginning in 2011. The EMUs consist of 5-car and 10-car sets respectively. The first EMUs went into service along Istanbul's two commuter rail lines from 2012 and 2013. On 29 October 2013, the first 5-car sets began operating between Kazlıçeşme and Ayrılıkçeşmesi as part of Phase I of the Marmaray project. Hyundai Rotem announced on 11 November 2008, that it had signed a €580 million contract to supply the rolling stock for the Marmaray project. The Korean firm had competition from shortlisted bidders Alstom, CAF, and a consortium of Bombardier, Siemens, and Nurol for the 440-vehicle contract which was placed by the Ministry of Transport's General Directorate of Railways, Harbours, and Airports. There is also an enlarged variant named TCDD E64000.

Back to article

Article summary

The TCDD E32000 is an electric multiple unit railway car built by Hyundai Rotem for the Turkish State Railways. They were ordered exclusively to operate along the Marmaray commuter rail network in Istanbul with delivery beginning in 2011. The EMUs consist of 5-car and 10-car sets respectively. The first EMUs went into service along Istanbul's two commuter rail lines from 2012 and 2013. On 29 October 2013, the first 5-car sets began operating between Kazlıçeşme and Ayrılıkçeşmesi as part of Phase I of the Marmaray project. Hyundai Rotem announced on 11 November 2008, that it had signed a €580 million contract to supply the rolling stock for the Marmaray project. The Korean firm had competition from shortlisted bidders Alstom, CAF, and a consortium of Bombardier, Siemens, and Nurol for the 440-vehicle contract which was placed by the Ministry of Transport's General Directorate of Railways, Harbours, and Airports. There is also an enlarged variant named TCDD E64000.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.