Lesson plan
Thameslink
Thameslink is a main line route on the British railway network which connects destinations north and south of London via tunnels under Central London. It runs from , , , , , and to , , , Rainham, , , and . The initial network opened as a through service in 1988 and, as of 2025, calls at 135 stations in regular service. A part of the route, from to , runs 24 hours a day, except on early Sunday mornings and during maintenance periods. The Thameslink Programme was a major £7 billion scheme to increase capacity on the central London section by accommodating more frequent and longer trains, and providing additional routes and destinations. The programme was divided into three key phases, with the final Key Output 2 introducing world-first Automatic Train Operation (ATO) technology over European Train Control System (ETCS) Level 2, enabling 24 trains per hour through the core section. The new services began operating in 2018, though the full projected timetable of 24 trains per hour has never been achieved. Passenger service on the route use purpose-built trains, which were introduced in 2016. Passenger services on the Thameslink route, along with all others operated by Govia Thameslink Railway, transferred to the state-owned Greater Thameslink Railway on 31 May 2026.
Article summary
Thameslink is a main line route on the British railway network which connects destinations north and south of London via tunnels under Central London. It runs from , , , , , and to , , , Rainham, , , and . The initial network opened as a through service in 1988 and, as of 2025, calls at 135 stations in regular service. A part of the route, from to , runs 24 hours a day, except on early Sunday mornings and during maintenance periods. The Thameslink Programme was a major £7 billion scheme to increase capacity on the central London section by accommodating more frequent and longer trains, and providing additional routes and destinations. The programme was divided into three key phases, with the final Key Output 2 introducing world-first Automatic Train Operation (ATO) technology over European Train Control System (ETCS) Level 2, enabling 24 trains per hour through the core section. The new services began operating in 2018, though the full projected timetable of 24 trains per hour has never been achieved. Passenger service on the route use purpose-built trains, which were introduced in 2016. Passenger services on the Thameslink route, along with all others operated by Govia Thameslink Railway, transferred to the state-owned Greater Thameslink Railway on 31 May 2026.
Key claims
- publication date: 2011 — source: Wikipedia, revision 1378136891, retrieved 2026-10-20 · confidence 0.95
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- The record states that the publication date is "2011". What evidence would count against this claim?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
- Wikipedia, “Thameslink”, revision 1378136891, retrieved 2026-10-20 https://en.wikipedia.org/w/index.php?oldid=1378136891
Key claims and bibliography are generated from the same tracked claims and sources as the article page.