A traction power network, also known as a traction power supply system, is an electrical distribution system dedicated to supplying power to electrified railways. The installation of a separate traction network generally is done only if the railway in question uses alternating current (AC) with a frequency lower than that of the national grid, such as in Germany, Austria and Switzerland. in Germany.
Alternatively, the three-phase alternating current of the power grid can be converted in substations by rotary transformers or static inverters into the voltage and type of current required by the trains. For railways which run on direct current (DC), this method is always used, as well as for railways which run on single-phase AC of decreased frequency, as in Mecklenburg-Western Pomerania, Saxony-Anhalt, Norway and Sweden.
In these areas there are no traction current networks.
Austria
The Mariazell railway in Lower Austria operates on single phase AC at a 25 Hz utility frequency. The railway has its own traction current lines with an operating voltage of 27 kV. These lines are mounted on the pylons of the overhead wire over the catenary wire.
Germany
In Germany, single conductors are usually used for traction current lines but, for the ICE train, two bundle conductors are used. The traction current supply lines from the nuclear power station Neckarwestheim to the traction current switching station at Neckarwestheim and from there to the central substation in Stuttgart, Zazenhausen are implemented as a four-bundle conductor circuit.
Scandinavia
In Sweden, Norway and some areas of the former German Democratic Republic, three phase AC is converted into single phase AC with a frequency of 16.7 cycles per second at the substations. Unlike in Western Germany, there are no dedicated power plants for railway electricity. All power comes from general electricity suppliers.
Although in this region there is, in principle, no requirement for traction power lines, there is a 132 kV-single AC power grid for railway power supply in Central Sweden (see Electric power supply system of railways in Sweden). In Norway, there is a small 55 kV single phase AC network for power supply of trains in the South, fed by Hakavik Power Station.
A further power station, at Kjofossen feeds single phase AC directly in the overhead wire. In Denmark and Finland, 50 Hz is used for the main lines (if electrified) and the electricity comes from general suppliers. As such, much simpler equipment than in Sweden and Norway is needed for conversion.
South Africa
In the Republic of South Africa there are extensive AC and DC traction schemes, including 50 kV and 25 kV AC single phase systems. Electrification in Natal was stimulated by the takeover of the South African Railways' system by the Electricity Supply Commission (now Eskom) based on the Colenso Power Station.
United Kingdom
In the United Kingdom, the Network Rail 750 V DC electrification system in the southeast of England is supplied with power from an extensive 33 kV power distribution network.
Areas with traction power networks
United Kingdom Germany (except Mecklenburg-Western Pomerania and Saxony-Anhalt), total length 7,959 km Switzerland Austria (separate traction power network for the Mariazeller Bahn) Central Sweden Southern Norway east of Oslo USA (Amtrak's former Pennsylvania Railroad lines between Philadelphia and New York City, Washington, D.C., and Harrisburg, PA running with single phase 25 Hz AC, see also Amtrak's 25 Hz traction power system) South Africa Melbourne, Australia (dedicated high voltage transmission wires between former Newport A Power Station and traction substations. However these lines are operated with three phase AC) Riyadh, Kingdom of Saudi Arabia (Riyadh Metro Networks)
Routing of traction current lines
Traction current lines are not usually laid parallel to the railway line, so as to minimise the line length and to avoid unnecessary influences of electrical system near the railway line. However, there are cases where this practice is not followed (for example, the current supply of some rapid-transit railways operating with alternating current in Germany).
In this case, the traction current line is laid on special cross beams of the overhead wire pylons above the overhead line. Because overhead line pylons possess a smaller cross section than traction current masts, these cross beams have to be quite narrow, so the arrangement of four conductor cables in one level, which is standard at traction current lines, cannot be used.
Where four conductors are needed, one approach is to employ a two-level arrangement of conductor cables. Alternatively, in cases of double-tracked railway lines, the overhead line pylons for both driving directions are equipped with cross beams for the traction current system (two conductor cables).
In densely populated areas, where rights of way are rare, it is common to find pylons which carry electric circuits for traction current as well as those for three-phase alternating current. The latter can be 110 kV, 220 kV, or, in some cases, 380 kV three phase AC lines.
In such cases, the traction current lines must use insulators which can cope with the maximum peak-to-peak voltage which can occur between the lines. Traction current lines are implemented as a rule as single leaders.
For the supply of railways with much rail traffic and in particular for the power supply of high speed railway lines such as the German ICE (Inter City Express) trains, conductors of two bundles are used. The traction current lines from the nuclear power station at Neckarwestheim to the traction current switching station at Neckarwestheim, and from the traction current switching station at Neckarwestheim to the central substation in Stuttgart Zazenhausen are implemented as four-bundle conductors.
Traction current lines are always equipped with an earth conductor. In some cases, two earth conductors are used: for example in, Germany, in cases where the traction current line is carried on pylons together with three phase AC, like the line to the nuclear power station at Neckarwestheim. Similarly, in Austria there are some traction current lines equipped with two earth ropes.
Alternatives to traction current lines
In Sweden, Norway and some areas of the former GDR three phase AC from the public grid is converted into single phase AC with a frequency of 16.7 Hz in substations close to the railways. In these regions there are no traction current lines.
Also in countries in which the electric trains run with direct current or with single phase AC with the frequency of the general power grid, the required conversion of the current is performed in the substations, so that in these countries no traction current lines are needed.
See also
Third rail Traction current converter plant Traction powerstation