{
  "id": "enwiki-001378296182",
  "slug": "trans-java-toll-road",
  "title": "Trans-Java Toll Road",
  "qid": "",
  "lead": "The Trans-Java Toll Road ( ) is a tolled expressway network in the island of Java, Indonesia, runs from Port of Merak in Cilegon, the main link between the island of Sumatra and Java, to Banyuwangi, the eastern end of the island in Indonesia and the main link between the island of Java and Bali. It mainly runs through the northern coast of the island, except for the section between Semarang and Surabaya, where it runs through the centre and south of the island. It runs through five of the six provinces on the island of Java (DI Yogyakarta being the sole exception), connecting the major cities of Jakarta, Cirebon, Semarang, Solo, and Surabaya. The toll road is the land transportation backbone of the island and is the most important toll road network of the country. The toll road has a total length of . The Trans-Jawa toll network was first conceived in whole in 1995, by President Soeharto as a means to connect both ends of the island to help with distribution and general traffic between the major cities that it runs through. But, the 1997 Asian financial crisis which affected the country, halted any developments. The project was later revived by President Joko Widodo, with the construction of the remaining sections starting between 2014 and 2016. This revival is mainly due to the main Pantura road getting increasingly congested, especially during the Eid and Christmas seasons.…",
  "body": "The Trans-Java Toll Road ( ) is a tolled expressway network in the island of Java, Indonesia, runs from Port of Merak in Cilegon, the main link between the island of Sumatra and Java, to Banyuwangi, the eastern end of the island in Indonesia and the main link between the island of Java and Bali. It mainly runs through the northern coast of the island, except for the section between Semarang and Surabaya, where it runs through the centre and south of the island. It runs through five of the six provinces on the island of Java (DI Yogyakarta being the sole exception), connecting the major cities of Jakarta, Cirebon, Semarang, Solo, and Surabaya. The toll road is the land transportation backbone of the island and is the most important toll road network of the country. The toll road has a total length of . The Trans-Jawa toll network was first conceived in whole in 1995, by President Soeharto as a means to connect both ends of the island to help with distribution and general traffic between the major cities that it runs through. But, the 1997 Asian financial crisis which affected the country, halted any developments. The project was later revived by President Joko Widodo, with the construction of the remaining sections starting between 2014 and 2016. This revival is mainly due to the main Pantura road getting increasingly congested, especially during the Eid and Christmas seasons. Several sections of the toll road were completed in December 2018, fully connecting the sections between Port of Merak and Surabaya. Meanwhile, the section connecting Surabaya and Probolinggo was completed a year later. As of 2023, the section between Probolinggo and Banyuwangi had its ground breaking with targeted completion date of 2025. There are also many other complementary toll networks connecting this toll road. Trans-Java toll road is part of Asian Highway 2, which extends from Denpasar, Indonesia to Khosravi, Iran. ==Complementary toll roads== ===Jagorawi Toll Road=== The Jagorawi Toll Road was the first toll road in Indonesia. It is and connects Jakarta, Bogor and Ciawi. The Jagorawi Toll Road was built to connect Jakarta and Bandung via Puncak, but since the Purbaleunyi Toll Road opened, it is used primarily for tourists to travel to Puncak. There are plans to extend this toll road to reach Bandung so that there will be two ways to travel from Bandung, via Jakarta-Cikampek Toll Road and Purbaleunyi Toll Road, or using the Jagorawi Toll Road. ===Cibitung–Cilincing Toll Road=== The Cibitung–Cilincing Toll Road will run between Cibitung and Cilincing. This is part of Jakarta Outer Ring Road 2. It will be composed of 4 sections: Section-1, Cibitung–SS Telaga Asih, Section-2, SS Telaga Asih–SS Tembalang Section-3, SS Tembalang–SS Tarumajaya, Section-4, SS Tarumajaya–Cilincing, . From Cibitung it will connect to the Jakarta–Cikampek Toll Road, and from Cilincing it will connect to Jakarta Inner Ring Road via the Koja-Tanjung Priok Port Toll Road. At Cimanggis Interchange, the toll road will be connected to the Jagorawi Toll Road and the Cinere-Jagorawi Toll Road which are currently under construction. The road concession is shared by three companies: MTD Capital Bhd (50%); PT Akses Pelabuhan Indonesia (45%); and PT Nusacipta Eka Pratama (5%). Construction is scheduled to begin in 2016 and the road to open in 2018. ===Cipularang Toll Road=== Cipularang Toll Road is a controlled-access toll road in Java, Indonesia. Opened in 2005, this road connects the Jakarta–Cikampek Toll Road and the Padaleunyi Toll Road. It runs from the north to south with the north end at Jakarta-Cikampek Toll Road and the south end at Cisumdawu Toll Road. Since it opened, this toll road has cut the time of car travel from Jakarta to Bandung to 2 hours. ===Cisumdawu Toll Road=== Cisumdawu Toll Road connects the cities of Cileunyi, Sumedang, and Dawuan. The toll road will connect Kertajati International Airport. ===Surabaya–Tanjung Perak Toll Road=== The Surabaya–Tanjung Perak Toll Road or SERR (Surabaya East Ring Road) connects the city of Surabaya with its port at Tanjung Perak. ===Waru–Juanda Toll Road=== The Waru–Juanda Toll Road connects Surabaya with its airport (Juanda International Airport). This toll road is fully operated by Citra Margatama Surabaya, a subsidiary of Citra Marga Nusaphala Persada. ===Juanda–Tanjung Perak Toll Road=== The Juanda–Tanjung Perak Toll Road is also called the Surabaya Eastern Ring Road (SERR). It will connect Juanda International Airport with Tanjung Perak Port. ==Impact== The completion of Trans-Java Toll Road connecting Jakarta and Surabaya in 2018 created a surge of intercity bus services in Indonesia. During this time, some intercity bus services began operating fleet of double decker busses. →=== Surabaya–Pasuruan–Banyuwangi section === The entire section is located in East Java. Note: Note: Distance is measured from the start of Jakarta section, while exit number is measured from the start of Surabaya section",
  "categories": [
    "102876480",
    "23118434",
    "23219638",
    "23603337",
    "24745107",
    "30109488",
    "46157106",
    "48171627",
    "53532883",
    "63712488",
    "63729138",
    "71478422"
  ],
  "license": "CC BY-SA 4.0",
  "source_uri": "https://en.wikipedia.org/w/index.php?oldid=1378296182",
  "content_hash": "",
  "created_at": null,
  "updated_at": 1791055769.0,
  "claims": [],
  "contradictions": [],
  "confidence": 0.6,
  "csl": {
    "id": "enwiki-001378296182",
    "type": "webpage",
    "title": "Trans-Java Toll Road",
    "author": [
      {
        "family": "Anticloud FZ LLE",
        "literal": "Anticloud FZ LLE"
      }
    ],
    "container-title": "encyclopegia.org",
    "publisher": "Anticloud FZ LLE",
    "publisher-place": "Dubai, United Arab Emirates",
    "URL": "https://encyclopegia.org/a/trans-java-toll-road",
    "issued": {
      "date-parts": [
        [
          2026,
          11,
          18
        ]
      ]
    },
    "accessed": {
      "date-parts": [
        [
          2026,
          11,
          18
        ]
      ]
    },
    "license": "CC BY-SA 4.0",
    "DOI": "eo1:enwiki-001378296182",
    "isBasedOn": "https://en.wikipedia.org/w/index.php?oldid=1378296182",
    "note": "Immutable snapshot enwiki-001378296182"
  }
}