Lesson plan

Transrapid

in Germany Transrapid ( ) is a German-developed high-speed monorail train using magnetic levitation. Planning for the system started in the late 1960s, with a test facility in Emsland, Germany, inaugurated in 1983. In 1991, technical readiness for application was approved by the Deutsche Bundesbahn in cooperation with universities. The last version, the 2007-built Transrapid 09, is designed for a cruising speed of and allows acceleration and deceleration of approximately . In 2002, the first commercial implementation was completed – the Shanghai Maglev Train, which connects the city of Shanghai's rapid transit network to Shanghai Pudong International Airport. The Transrapid system has not yet been deployed on a long-distance intercity line. The system was developed and marketed by Siemens and ThyssenKrupp, as well as other, mostly German companies. In 2006, a Transrapid train collided with a maintenance vehicle on the German test track, leading to 23 fatalities. In 2011, the Emsland test track closed down when its operating license expired. In early 2012, demolition and reconversion of the entire Emsland site including the factory was approved, but was delayed until late 2023 because of concepts for usage as a Hyperloop test track or a maglev track for the Chinese CRRC Maglev.…

Back to article

Article summary

in Germany Transrapid ( ) is a German-developed high-speed monorail train using magnetic levitation. Planning for the system started in the late 1960s, with a test facility in Emsland, Germany, inaugurated in 1983. In 1991, technical readiness for application was approved by the Deutsche Bundesbahn in cooperation with universities. The last version, the 2007-built Transrapid 09, is designed for a cruising speed of and allows acceleration and deceleration of approximately . In 2002, the first commercial implementation was completed – the Shanghai Maglev Train, which connects the city of Shanghai's rapid transit network to Shanghai Pudong International Airport. The Transrapid system has not yet been deployed on a long-distance intercity line. The system was developed and marketed by Siemens and ThyssenKrupp, as well as other, mostly German companies. In 2006, a Transrapid train collided with a maintenance vehicle on the German test track, leading to 23 fatalities. In 2011, the Emsland test track closed down when its operating license expired. In early 2012, demolition and reconversion of the entire Emsland site including the factory was approved, but was delayed until late 2023 because of concepts for usage as a Hyperloop test track or a maglev track for the Chinese CRRC Maglev.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.