Lesson plan

Ugarit

UGARIT is a submarine telecommunications cable system in the Mediterranean Sea linking Cyprus and Syria. It has landing points in: * Pentaskhinos, Cyprus * Tartous, Syria It has a design transmission capacity of 622 Mbit/s and a total cable length of 239 km. It started operation on 6 February 1995.

Back to article

Article summary

UGARIT is a submarine telecommunications cable system in the Mediterranean Sea linking Cyprus and Syria. It has landing points in: * Pentaskhinos, Cyprus * Tartous, Syria It has a design transmission capacity of 622 Mbit/s and a total cable length of 239 km. It started operation on 6 February 1995.

Key claims

  1. area: 20 meters — source: Wikipedia, revision 1374559696, retrieved 2026-10-20 · confidence 0.95
  2. date of establishment: 1194 — source: Wikipedia, revision 1374559696, retrieved 2026-10-20 · confidence 0.95

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. The record states that the area is "20 meters". What evidence would count against this claim?
  3. The record states that the date of establishment is "1194". What evidence would count against this claim?
  4. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  5. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

  1. Wikipedia, “Ugarit”, revision 1374559696, retrieved 2026-10-20 https://en.wikipedia.org/w/index.php?oldid=1374559696

Key claims and bibliography are generated from the same tracked claims and sources as the article page.